cert
cert-1
cert-2

Pass PMI CAPM Exam in First Attempt Guaranteed!

Get 100% Latest Exam Questions, Accurate & Verified Answers to Pass the Actual Exam!
30 Days Free Updates, Instant Download!

cert-5
cert-6
CAPM Exam - Verified By Experts
CAPM Premium Bundle
$29.98

CAPM Premium Bundle

$79.99
$109.97
  • Premium File 688 Questions & Answers. Last update: Nov 21, 2026
  • Training Course 123 Video Lectures
  • Study Guide 719 Pages
 
$109.97
$79.99
accept 19 downloads in last 7 days
block-screenshots
Purchase PMI CAPM Exam Training Products Individually
PMI CAPM Premium File
Premium File 688 Q&A
$76.99$69.99
PMI CAPM Video Training Course
Training Course 123 Lectures
$21.99 $19.99
PMI CAPM PDF Study Guide
Study Guide 719 Pages
$21.99 $19.99
PMI CAPM Practice Test 41

Question 400

For an original CAPM project delivery study scenario, consider: A delayed noncritical supply task has three days of available float while executives demand immediate cost-intensive crashing without checking if the finish milestone is threatened. Select THREE compatible elements: a proper correction, a targeted diagnostic and an acceptance result.

  1. Change: Distinguish initiating authorization, planning baselines, executing work, monitoring and controlling deviations, and closing or handover tasks.
  2. Check: Compare early and late dates, current critical-path activities, float remaining, technical dependencies and risk of overlapping tasks.
  3. Change: Identify the actual controlling path and available total float before deciding whether fast-tracking, crashing or no compression is justified.
  4. Result: The specialist receives one feasible coordinated work plan and disputes follow documented authority boundaries rather than informal rank.
  5. Result: Intervention targets the actual completion constraint, and remaining float or compression risk is reported transparently to the sponsor.
  6. Check: Check WBS dictionary boundaries, work-package deliverables, ownership, activity sequencing and acceptance evidence.

Explanation

Correct Answer

B:

Total float is schedule flexibility before project finish or successor constraints are affected; compressing work off the critical path may not improve completion. Acceptance: Intervention targets the actual completion constraint, and remaining float or compression risk is reported transparently to the sponsor.

C:

Total float is schedule flexibility before project finish or successor constraints are affected; compressing work off the critical path may not improve completion. Evidence: Compare early and late dates, current critical-path activities, float remaining, technical dependencies and risk of overlapping tasks.

E:

Total float is schedule flexibility before project finish or successor constraints are affected; compressing work off the critical path may not improve completion. Required intervention: Identify the actual controlling path and available total float before deciding whether fast-tracking, crashing or no compression is justified.

Incorrect Answers

A:

Change: Distinguish initiating authorization, planning baselines, executing work, monitoring and controlling deviations, and closing or handover tasks. Total float is schedule flexibility before project finish or successor constraints are affected; compressing work off the critical path may not improve completion.

D:

Result: The specialist receives one feasible coordinated work plan and disputes follow documented authority boundaries rather than informal rank. Total float is schedule flexibility before project finish or successor constraints are affected; compressing work off the critical path may not improve completion.

F:

Check: Check WBS dictionary boundaries, work-package deliverables, ownership, activity sequencing and acceptance evidence. Total float is schedule flexibility before project finish or successor constraints are affected; compressing work off the critical path may not improve completion.

Question 401

A CAPM project team analyst is reviewing this delivery scenario: At a reporting date earned value EV=80 and planned value PV=100 measured in cost units, but a coordinator says the project is twenty units ahead because costs were low. An unsafe shortcut would be: Subtract actual cost from planned value and label that number the schedule variance in elapsed days. What should the project team analyst recommend as the narrowly scoped correction? Select ONE best answer.

  1. Determine the longest dependent path through the activity network and calculate finish time after respecting parallel branches and convergence.
  2. Compute schedule variance as EV minus PV and interpret negative as behind the value baseline and positive as ahead in earned-value terms.
  3. Forecast final cost using an appropriate earned-value assumption, such as EAC=BAC divided by CPI when current cost efficiency is expected to continue.
  4. Subtract actual cost from planned value and label that number the schedule variance in elapsed days.

Explanation

Correct Answer

B:

This targeted action addresses the observed delivery, governance or stakeholder-decision gap without discarding necessary controls. Applied case: At a reporting date earned value EV=80 and planned value PV=100 measured in cost units, but a coordinator says the project is twenty units ahead because costs were low.

Incorrect Answers

A:

Determine the longest dependent path through the activity network and calculate finish time after respecting parallel branches and convergence. Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

C:

Forecast final cost using an appropriate earned-value assumption, such as EAC=BAC divided by CPI when current cost efficiency is expected to continue. Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

D:

Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

Question 402

CAPM predictive scheduling and earned-value calculation. At a reporting date earned value EV=80 and planned value PV=100 measured in cost units, but a coordinator says the project is twenty units ahead because costs were low. What is the earned-value schedule variance SV, in the same cost units as EV and PV? Select ONE best answer.

  1. SV = -20 units
  2. SV = 0 units
  3. SV = +180 units
  4. SV = +20 units

Explanation

Correct Answer

A:

SV = -20 units This is the correct result. Schedule variance SV=EV-PV=80-100=-20 value units; this indicates behind the value schedule baseline, not 20 calendar days.

Incorrect Answers

B:

SV = 0 units This result is inconsistent with the required calculation. The two input values are not equal. Correct work: Schedule variance SV=EV-PV=80-100=-20 value units; this indicates behind the value schedule baseline, not 20 calendar days.

C:

SV = +180 units This result is inconsistent with the required calculation. Adding EV and PV is not the variance calculation. Correct work: Schedule variance SV=EV-PV=80-100=-20 value units; this indicates behind the value schedule baseline, not 20 calendar days.

D:

Reversing EV and PV changes the sign and falsely suggests schedule advancement.

Question 403

The project team has not approved a broad project-plan change. Available evidence indicates: At a reporting date earned value EV=80 and planned value PV=100 measured in cost units, but a coordinator says the project is twenty units ahead because costs were low. Which evidence best tests the project diagnosis before approving a disruptive change? Select ONE best answer.

  1. Verify EV and PV at the same status date, the units of value and the reported subtraction rather than using actual cost.
  2. Check baseline BAC, earned EV, actual AC, computed CPI and whether the proposed forecasting assumption fits the work remaining.
  3. Check EV earned through status and AC booked for the same work, then calculate the signed difference and variance narrative.
  4. Examine the organization chart, resource assignment, delegated project authority and the two managers' priority decisions.

Explanation

Correct Answer

A:

Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

Incorrect Answers

B:

Check baseline BAC, earned EV, actual AC, computed CPI and whether the proposed forecasting assumption fits the work remaining. Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

C:

Check EV earned through status and AC booked for the same work, then calculate the signed difference and variance narrative. Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

D:

Examine the organization chart, resource assignment, delegated project authority and the two managers' priority decisions. Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

Question 404

A candidate project response has been piloted and stakeholders require a post-change acceptance check. Original problem: At a reporting date earned value EV=80 and planned value PV=100 measured in cost units, but a coordinator says the project is twenty units ahead because costs were low. The accountable project owner requires evidence that outcomes are met without disrupting planned work. Which acceptance result demonstrates that the project response meets the intended outcome? Select ONE best answer.

  1. The report states the selected EAC method, its inputs and a defensible final-cost forecast for each scenario.
  2. The status states SV=-20 for EV80/PV100 or SV=+15 for EV150/PV135 and draws the correct baseline comparison.
  3. Everyone executes one approved baseline set and reports performance against the same current definitions.
  4. Reports and source controls reconcile at the reporting date, exposing variance, ownership and authorized changes without contradictory status.

Explanation

Correct Answer

B:

Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

Incorrect Answers

A:

The report states the selected EAC method, its inputs and a defensible final-cost forecast for each scenario. Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

C:

Everyone executes one approved baseline set and reports performance against the same current definitions. Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

D:

Reports and source controls reconcile at the reporting date, exposing variance, ownership and authorized changes without contradictory status. Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

Question 405

An implementation sign-off request identifies the following problem: At a reporting date earned value EV=80 and planned value PV=100 measured in cost units, but a coordinator says the project is twenty units ahead because costs were low. Which paired project management action and verification should close the review? Select ONE best answer.

  1. Change: Model real task precedence and suitable finish-to-start or other valid relationships with explicit lags before calculating the project network schedule. Verify: Review the activity list, predecessor links, dependency type, lag assumptions and consequences of each violated relationship.
  2. Change: Compute cost variance as EV minus AC, using comparable value and actual-cost units; negative means over budget for performed work. Verify: Check EV earned through status and AC booked for the same work, then calculate the signed difference and variance narrative.
  3. Change: Determine the longest dependent path through the activity network and calculate finish time after respecting parallel branches and convergence. Verify: Calculate each candidate start-to-finish path, compare durations and verify the converging successor begins only after all required predecessors finish.
  4. Change: Compute schedule variance as EV minus PV and interpret negative as behind the value baseline and positive as ahead in earned-value terms. Verify: Verify EV and PV at the same status date, the units of value and the reported subtraction rather than using actual cost.

Explanation

Correct Answer

D:

Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

Incorrect Answers

A:

Change: Model real task precedence and suitable finish-to-start or other valid relationships with explicit lags before calculating the project network schedule. Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

B:

Change: Compute cost variance as EV minus AC, using comparable value and actual-cost units; negative means over budget for performed work. Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

C:

Change: Determine the longest dependent path through the activity network and calculate finish time after respecting parallel branches and convergence.

Question 406

A CAPM project team analyst is reviewing this delivery scenario: A rollout has EV=150 and PV=135 cost units on the status date, yet its dashboard marks a fifteen-unit schedule delay without doing the earned-value subtraction. An unsafe shortcut would be: Subtract actual cost from planned value and label that number the schedule variance in elapsed days. What should the project team analyst recommend as the narrowly scoped correction? Select ONE best answer.

  1. Distinguish initiating authorization, planning baselines, executing work, monitoring and controlling deviations, and closing or handover tasks.
  2. Subtract actual cost from planned value and label that number the schedule variance in elapsed days.
  3. Determine the longest dependent path through the activity network and calculate finish time after respecting parallel branches and convergence.
  4. Compute schedule variance as EV minus PV and interpret negative as behind the value baseline and positive as ahead in earned-value terms.

Explanation

Correct Answer

D:

This targeted action addresses the observed delivery, governance or stakeholder-decision gap without discarding necessary controls. Applied case: A rollout has EV=150 and PV=135 cost units on the status date, yet its dashboard marks a fifteen-unit schedule delay without doing the earned-value subtraction.

Incorrect Answers

A:

This option addresses a different CAPM project management topic (Predictive process groups and transitions) rather than the documented Schedule variance EV versus PV decision.

B:

For this best change assessment, the shortcut changes or bypasses the necessary delivery, governance or operational boundary rather than correcting it.

C:

Determine the longest dependent path through the activity network and calculate finish time after respecting parallel branches and convergence. A rollout has EV=150 and PV=135 cost units on the status date, yet its dashboard marks a fifteen-unit schedule delay without doing the earned-value subtraction.

Question 407

CAPM predictive scheduling and earned-value calculation. A rollout has EV=150 and PV=135 cost units on the status date, yet its dashboard marks a fifteen-unit schedule delay without doing the earned-value subtraction. What is earned-value schedule variance SV at this status date? Select ONE best answer.

  1. SV = +15 units
  2. SV = +285 units
  3. SV = 0 units
  4. SV = -15 units

Explanation

Correct Answer

A:

SV = +15 units This is the correct result. SV=EV-PV=150-135=+15 value units, indicating work value ahead of baseline.

Incorrect Answers

B:

SV = +285 units This result is inconsistent with the required calculation. Adding the amounts does not represent schedule variance. Correct work: SV=EV-PV=150-135=+15 value units, indicating work value ahead of baseline.

C:

SV = 0 units This result is inconsistent with the required calculation. EV differs from PV by 15 units. Correct work: SV=EV-PV=150-135=+15 value units, indicating work value ahead of baseline.

D:

SV = -15 units This result is inconsistent with the required calculation. Subtracting EV from PV reverses the sign. Correct work: SV=EV-PV=150-135=+15 value units, indicating work value ahead of baseline.

Question 408

The project team has not approved a broad project-plan change. Available evidence indicates: A rollout has EV=150 and PV=135 cost units on the status date, yet its dashboard marks a fifteen-unit schedule delay without doing the earned-value subtraction. Which evidence best tests the project diagnosis before approving a disruptive change? Select ONE best answer.

  1. Examine the organization chart, resource assignment, delegated project authority and the two managers' priority decisions.
  2. Inspect artifact version, owner, status-date consistency, change approvals and reconciliation of progress to measurable work completion.
  3. Inspect change disposition, document revision IDs, work authorization, updated budgets, dates and acceptance tests across stakeholders.
  4. Verify EV and PV at the same status date, the units of value and the reported subtraction rather than using actual cost.

Explanation

Correct Answer

D:

Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

Incorrect Answers

A:

Examine the organization chart, resource assignment, delegated project authority and the two managers' priority decisions. A rollout has EV=150 and PV=135 cost units on the status date, yet its dashboard marks a fifteen-unit schedule delay without doing the earned-value subtraction.

B:

Inspect artifact version, owner, status-date consistency, change approvals and reconciliation of progress to measurable work completion. Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

C:

Inspect change disposition, document revision IDs, work authorization, updated budgets, dates and acceptance tests across stakeholders. Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

Question 409

A candidate project response has been piloted and stakeholders require a post-change acceptance check. Original problem: A rollout has EV=150 and PV=135 cost units on the status date, yet its dashboard marks a fifteen-unit schedule delay without doing the earned-value subtraction. The accountable project owner requires evidence that outcomes are met without disrupting planned work. Which acceptance result demonstrates that the project response meets the intended outcome? Select ONE best answer.

  1. The specialist receives one feasible coordinated work plan and disputes follow documented authority boundaries rather than informal rank.
  2. The planned sequence respects mandatory handoffs and its schedule can be recalculated when predecessor activities slip.
  3. The status states SV=-20 for EV80/PV100 or SV=+15 for EV150/PV135 and draws the correct baseline comparison.
  4. Product measurements and documented controls meet the agreed standard, and deviations have explicit corrective or acceptance decisions.

Explanation

Correct Answer

C:

Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days. The approved implementation step was: Compute schedule variance as EV minus PV and interpret negative as behind the value baseline and positive as ahead in earned-value terms.

Incorrect Answers

A:

The specialist receives one feasible coordinated work plan and disputes follow documented authority boundaries rather than informal rank. Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

B:

The planned sequence respects mandatory handoffs and its schedule can be recalculated when predecessor activities slip. Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

D:

This option addresses a different CAPM project management topic (Quality management plan and control) rather than the documented Schedule variance EV versus PV decision.

Question 410

For an original CAPM project delivery study scenario, consider: A rollout has EV=150 and PV=135 cost units on the status date, yet its dashboard marks a fifteen-unit schedule delay without doing the earned-value subtraction. Select TWO complementary steps: the targeted correction and its strongest prechange validation.

  1. Subtract actual cost from planned value and label that number the schedule variance in elapsed days.
  2. Change: Calculate CPI as EV divided by AC and SPI as EV divided by PV, interpreting efficiency and schedule separately.
  3. Check: Compare early and late dates, current critical-path activities, float remaining, technical dependencies and risk of overlapping tasks.
  4. Change: Compute schedule variance as EV minus PV and interpret negative as behind the value baseline and positive as ahead in earned-value terms.
  5. Check: Verify EV and PV at the same status date, the units of value and the reported subtraction rather than using actual cost.

Explanation

Correct Answer

D:

Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days. Evidence: Verify EV and PV at the same status date, the units of value and the reported subtraction rather than using actual cost.

E:

Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days. Verify EV and PV at the same status date, the units of value and the reported subtraction rather than using actual cost.

Incorrect Answers

A:

Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.

B:

This option addresses a different CAPM project management topic (CPI and SPI index interpretation) rather than the documented Schedule variance EV versus PV decision.