cert
cert-1
cert-2

Pass PMI CAPM Exam in First Attempt Guaranteed!

Get 100% Latest Exam Questions, Accurate & Verified Answers to Pass the Actual Exam!
30 Days Free Updates, Instant Download!

cert-5
cert-6
CAPM Exam - Verified By Experts
CAPM Premium Bundle
$29.98

CAPM Premium Bundle

$79.99
$109.97
  • Premium File 688 Questions & Answers. Last update: Nov 21, 2026
  • Training Course 123 Video Lectures
  • Study Guide 719 Pages
 
$109.97
$79.99
accept 19 downloads in last 7 days
block-screenshots
Purchase PMI CAPM Exam Training Products Individually
PMI CAPM Premium File
Premium File 688 Q&A
$76.99$69.99
PMI CAPM Video Training Course
Training Course 123 Lectures
$21.99 $19.99
PMI CAPM PDF Study Guide
Study Guide 719 Pages
$21.99 $19.99
PMI CAPM Practice Test 38

Question 370

For an original CAPM project delivery study scenario, consider: An equipment installation project has a signed WBS work package for test certification but schedules its setup, execution and report tasks as one undifferentiated milestone. Select TWO complementary steps: the targeted correction and its strongest prechange validation.

  1. Change: Maintain a consistent integrated plan and update all impacted baselines, requirements and communications following an authorized change.
  2. Treat individual calendar reminders as independent product deliverables and omit work-package acceptance criteria.
  3. Check: Check WBS dictionary boundaries, work-package deliverables, ownership, activity sequencing and acceptance evidence.
  4. Change: Define work packages as manageable units of deliverable scope and derive scheduled activities and milestones to complete them.
  5. Check: Inspect artifact version, owner, status-date consistency, change approvals and reconciliation of progress to measurable work completion.

Explanation

Correct Answer

C:

Acceptance: The project can trace each scheduled activity to an accountable scope package and verify the package's completed output.

D:

Acceptance: The project can trace each scheduled activity to an accountable scope package and verify the package's completed output. A work package is a WBS control unit for estimating and responsibility; its constituent activities consume time to produce its deliverable.

Incorrect Answers

A:

Change: Maintain a consistent integrated plan and update all impacted baselines, requirements and communications following an authorized change. A work package is a WBS control unit for estimating and responsibility; its constituent activities consume time to produce its deliverable.

B:

A work package is a WBS control unit for estimating and responsibility; its constituent activities consume time to produce its deliverable. Use this instead: Define work packages as manageable units of deliverable scope and derive scheduled activities and milestones to complete them.

E:

Check: Inspect artifact version, owner, status-date consistency, change approvals and reconciliation of progress to measurable work completion. A work package is a WBS control unit for estimating and responsibility; its constituent activities consume time to produce its deliverable.

Question 371

A CAPM project team analyst is reviewing this delivery scenario: A construction scheduler allows wall painting before concrete curing because the network diagram contains no finish-to-start relationship. An unsafe shortcut would be: Insert arbitrary fixed dates and remove dependencies so all activities appear to finish before the sponsor's target. What should the project team analyst recommend as the narrowly scoped correction? Select ONE best answer.

  1. Forecast final cost using an appropriate earned-value assumption, such as EAC=BAC divided by CPI when current cost efficiency is expected to continue.
  2. Model real task precedence and suitable finish-to-start or other valid relationships with explicit lags before calculating the project network schedule.
  3. Insert arbitrary fixed dates and remove dependencies so all activities appear to finish before the sponsor's target.
  4. Compute cost variance as EV minus AC, using comparable value and actual-cost units; negative means over budget for performed work.

Explanation

Correct Answer

B:

Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

Incorrect Answers

A:

This option addresses a different CAPM project management topic (Estimate at completion forecasting) rather than the documented Precedence dependencies and network sequencing decision.

C:

Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

D:

Compute cost variance as EV minus AC, using comparable value and actual-cost units; negative means over budget for performed work. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

Question 372

A project delivery review finds: A construction scheduler allows wall painting before concrete curing because the network diagram contains no finish-to-start relationship. The team proposes: Model real task precedence and suitable finish-to-start or other valid relationships with explicit lags before calculating the project network schedule. Which project management principle most strongly supports the proposed response? Select ONE best answer.

  1. Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days.
  2. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.
  3. Process groups describe types of management activity that can overlap and recur; they are not identical to sequential product development phases.
  4. A work package is a WBS control unit for estimating and responsibility; its constituent activities consume time to produce its deliverable.

Explanation

Correct Answer

B:

Demonstrable success requires: The planned sequence respects mandatory handoffs and its schedule can be recalculated when predecessor activities slip.

Incorrect Answers

A:

Earned-value schedule variance compares work value accomplished to value planned by the reporting date; it is not a direct measure of calendar days. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

C:

This option addresses a different CAPM project management topic (Predictive process groups and transitions) rather than the documented Precedence dependencies and network sequencing decision.

D:

A work package is a WBS control unit for estimating and responsibility; its constituent activities consume time to produce its deliverable. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

Question 373

The project team has not approved a broad project-plan change. Available evidence indicates: A construction scheduler allows wall painting before concrete curing because the network diagram contains no finish-to-start relationship. Which evidence best tests the project diagnosis before approving a disruptive change? Select ONE best answer.

  1. Verify that requirements are sufficiently stable, mandatory approvals are known and schedule or contract constraints justify baseline control.
  2. Review the activity list, predecessor links, dependency type, lag assumptions and consequences of each violated relationship.
  3. Calculate each candidate start-to-finish path, compare durations and verify the converging successor begins only after all required predecessors finish.
  4. Verify EV and PV at the same status date, the units of value and the reported subtraction rather than using actual cost.

Explanation

Correct Answer

B:

Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

Incorrect Answers

A:

Verify that requirements are sufficiently stable, mandatory approvals are known and schedule or contract constraints justify baseline control. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

C:

Calculate each candidate start-to-finish path, compare durations and verify the converging successor begins only after all required predecessors finish. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

D:

Verify EV and PV at the same status date, the units of value and the reported subtraction rather than using actual cost. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

Question 374

A candidate project response has been piloted and stakeholders require a post-change acceptance check. Original problem: A construction scheduler allows wall painting before concrete curing because the network diagram contains no finish-to-start relationship. The accountable project owner requires evidence that outcomes are met without disrupting planned work. Which acceptance result demonstrates that the project response meets the intended outcome? Select ONE best answer.

  1. The project can trace each scheduled activity to an accountable scope package and verify the package's completed output.
  2. The planned sequence respects mandatory handoffs and its schedule can be recalculated when predecessor activities slip.
  3. Product measurements and documented controls meet the agreed standard, and deviations have explicit corrective or acceptance decisions.
  4. The specialist receives one feasible coordinated work plan and disputes follow documented authority boundaries rather than informal rank.

Explanation

Correct Answer

B:

Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

Incorrect Answers

A:

The project can trace each scheduled activity to an accountable scope package and verify the package's completed output. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

C:

Product measurements and documented controls meet the agreed standard, and deviations have explicit corrective or acceptance decisions. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

D:

This option addresses a different CAPM project management topic (Organizational matrix authority) rather than the documented Precedence dependencies and network sequencing decision.

Question 375

An implementation sign-off request identifies the following problem: A construction scheduler allows wall painting before concrete curing because the network diagram contains no finish-to-start relationship. Which paired project management action and verification should close the review? Select ONE best answer.

  1. Change: Calculate CPI as EV divided by AC and SPI as EV divided by PV, interpreting efficiency and schedule separately. Verify: Check EV, PV and AC same-date values, calculation denominator and whether the status conclusion separates cost from schedule.
  2. Change: Compute cost variance as EV minus AC, using comparable value and actual-cost units; negative means over budget for performed work. Verify: Check EV earned through status and AC booked for the same work, then calculate the signed difference and variance narrative.
  3. Change: Model real task precedence and suitable finish-to-start or other valid relationships with explicit lags before calculating the project network schedule. Verify: Review the activity list, predecessor links, dependency type, lag assumptions and consequences of each violated relationship.
  4. Change: Maintain a consistent integrated plan and update all impacted baselines, requirements and communications following an authorized change. Verify: Inspect change disposition, document revision IDs, work authorization, updated budgets, dates and acceptance tests across stakeholders.

Explanation

Correct Answer

C:

Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

Incorrect Answers

A:

This option addresses a different CAPM project management topic (CPI and SPI index interpretation) rather than the documented Precedence dependencies and network sequencing decision.

B:

Change: Compute cost variance as EV minus AC, using comparable value and actual-cost units; negative means over budget for performed work.

D:

Change: Maintain a consistent integrated plan and update all impacted baselines, requirements and communications following an authorized change. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

Question 376

A CAPM project team analyst is reviewing this delivery scenario: A product team schedules final validation to start after prototyping begins, but ignores the approved rule that testing must wait for the complete prototype handover. An unsafe shortcut would be: Insert arbitrary fixed dates and remove dependencies so all activities appear to finish before the sponsor's target. What should the project team analyst recommend as the narrowly scoped correction? Select ONE best answer.

  1. Identify the actual controlling path and available total float before deciding whether fast-tracking, crashing or no compression is justified.
  2. Insert arbitrary fixed dates and remove dependencies so all activities appear to finish before the sponsor's target.
  3. Model real task precedence and suitable finish-to-start or other valid relationships with explicit lags before calculating the project network schedule.
  4. Maintain a consistent integrated plan and update all impacted baselines, requirements and communications following an authorized change.

Explanation

Correct Answer

C:

Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

Incorrect Answers

A:

Identify the actual controlling path and available total float before deciding whether fast-tracking, crashing or no compression is justified. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

B:

Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

D:

Maintain a consistent integrated plan and update all impacted baselines, requirements and communications following an authorized change. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

Question 377

A project delivery review finds: A product team schedules final validation to start after prototyping begins, but ignores the approved rule that testing must wait for the complete prototype handover. The team proposes: Model real task precedence and suitable finish-to-start or other valid relationships with explicit lags before calculating the project network schedule. Which project management principle most strongly supports the proposed response? Select ONE best answer.

  1. The critical path is the longest-duration path through the directed schedule network and typically determines earliest project completion absent constraints or resource effects.
  2. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.
  3. The WBS organizes all approved project scope by deliverables and supports a scope baseline; activities and calendar dates are planned from that work.
  4. Predictive monitoring depends on traceable baseline comparisons and controlled records; one status narrative cannot replace underlying evidence.

Explanation

Correct Answer

B:

Demonstrable success requires: The planned sequence respects mandatory handoffs and its schedule can be recalculated when predecessor activities slip.

Incorrect Answers

A:

The critical path is the longest-duration path through the directed schedule network and typically determines earliest project completion absent constraints or resource effects. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

C:

The WBS organizes all approved project scope by deliverables and supports a scope baseline; activities and calendar dates are planned from that work. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

D:

Predictive monitoring depends on traceable baseline comparisons and controlled records; one status narrative cannot replace underlying evidence. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

Question 378

The project team has not approved a broad project-plan change. Available evidence indicates: A product team schedules final validation to start after prototyping begins, but ignores the approved rule that testing must wait for the complete prototype handover. Which evidence best tests the project diagnosis before approving a disruptive change? Select ONE best answer.

  1. Check WBS dictionary boundaries, work-package deliverables, ownership, activity sequencing and acceptance evidence.
  2. Compare early and late dates, current critical-path activities, float remaining, technical dependencies and risk of overlapping tasks.
  3. Check EV earned through status and AC booked for the same work, then calculate the signed difference and variance narrative.
  4. Review the activity list, predecessor links, dependency type, lag assumptions and consequences of each violated relationship.

Explanation

Correct Answer

D:

Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network. Confirm afterward that: The planned sequence respects mandatory handoffs and its schedule can be recalculated when predecessor activities slip.

Incorrect Answers

A:

Check WBS dictionary boundaries, work-package deliverables, ownership, activity sequencing and acceptance evidence. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

B:

Compare early and late dates, current critical-path activities, float remaining, technical dependencies and risk of overlapping tasks. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

C:

Check EV earned through status and AC booked for the same work, then calculate the signed difference and variance narrative. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

Question 379

A candidate project response has been piloted and stakeholders require a post-change acceptance check. Original problem: A product team schedules final validation to start after prototyping begins, but ignores the approved rule that testing must wait for the complete prototype handover. The accountable project owner requires evidence that outcomes are met without disrupting planned work. Which acceptance result demonstrates that the project response meets the intended outcome? Select ONE best answer.

  1. The report correctly shows CV=-30 for EV120/AC150 or CV=+15 for EV210/AC195, with no false comparison to elapsed days.
  2. Every agreed deliverable maps to one accountable work package and detailed activity planning can follow without unapproved additions.
  3. Intervention targets the actual completion constraint, and remaining float or compression risk is reported transparently to the sponsor.
  4. The planned sequence respects mandatory handoffs and its schedule can be recalculated when predecessor activities slip.

Explanation

Correct Answer

D:

Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network. The approved implementation step was: Model real task precedence and suitable finish-to-start or other valid relationships with explicit lags before calculating the project network schedule.

Incorrect Answers

A:

The report correctly shows CV=-30 for EV120/AC150 or CV=+15 for EV210/AC195, with no false comparison to elapsed days. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

B:

Every agreed deliverable maps to one accountable work package and detailed activity planning can follow without unapproved additions. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

C:

Intervention targets the actual completion constraint, and remaining float or compression risk is reported transparently to the sponsor. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

Question 380

For an original CAPM project delivery study scenario, consider: A product team schedules final validation to start after prototyping begins, but ignores the approved rule that testing must wait for the complete prototype handover. Select TWO complementary steps: the targeted correction and its strongest prechange validation.

  1. Insert arbitrary fixed dates and remove dependencies so all activities appear to finish before the sponsor's target.
  2. Change: Model real task precedence and suitable finish-to-start or other valid relationships with explicit lags before calculating the project network schedule.
  3. Change: Plan prevention and verification methods, measurement thresholds and nonconformance responses, then execute the documented quality controls.
  4. Check: Compare early and late dates, current critical-path activities, float remaining, technical dependencies and risk of overlapping tasks.
  5. Check: Review the activity list, predecessor links, dependency type, lag assumptions and consequences of each violated relationship.

Explanation

Correct Answer

B:

Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network. Acceptance: The planned sequence respects mandatory handoffs and its schedule can be recalculated when predecessor activities slip.

E:

Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network. Required intervention: Model real task precedence and suitable finish-to-start or other valid relationships with explicit lags before calculating the project network schedule.

Incorrect Answers

A:

Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

C:

Change: Plan prevention and verification methods, measurement thresholds and nonconformance responses, then execute the documented quality controls. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

D:

Check: Compare early and late dates, current critical-path activities, float remaining, technical dependencies and risk of overlapping tasks. Sequence logic represents technical or contractual dependencies; calendar dates cannot replace a correct dependency network.

Certified Associate in Project Management (PMI-100) (CAPM) Practice Tests