CompTIA N10-009 Practice Test 67
Question 660
The original case was: An Ethernet link shows rising CRC errors only when nearby industrial motors run. The requirement then changes: The company replaces the noisy copper uplink with long-distance fiber. Which revised action BEST meets this new condition?
- Investigate electromagnetic interference and replace or reroute affected cable with suitable shielding.
- Error rates fall when the cable is rerouted or protected from the noise source.
- Choose appropriate fiber media and optics for electrical isolation.
- Increase DNS TTL to compensate for physical frame corruption.
Explanation
Correct Answer
C:Fiber transmission avoids the same copper EMI exposure. The revised requirement is: The company replaces the noisy copper uplink with long-distance fiber. The appropriate action is: Choose appropriate fiber media and optics for electrical isolation.
Incorrect Answers
A:This is the original control. Electrical noise can corrupt copper transmission, causing CRC errors. It does not directly satisfy the revised requirement: The company replaces the noisy copper uplink with long-distance fiber.
B:Error rates fall when the cable is rerouted or protected from the noise source. The current requirement is: The company replaces the noisy copper uplink with long-distance fiber.
D:Name caching does not eliminate copper interference. It remains inappropriate in the revised context.
Question 661
PoE access points fail to power when a switch powers all attached devices simultaneously. Which action MOST directly meets the stated networking requirement?
- Identify the port-security trigger, remove unauthorized devices and restore under policy.
- Upgrade the PoE source or use approved injectors with compatible standard.
- Review switch PoE budget and the power class or standard required by the devices.
- Raise radio transmit power to create additional electrical PoE capacity.
Explanation
Correct Answer
C:Aggregate delivered power cannot exceed switch capabilities or device negotiation requirements. This specifically resolves: PoE access points fail to power when a switch powers all attached devices simultaneously.
Incorrect Answers
A:This addresses another problem in objective 5.2: A network port is error-disabled after a user attached a small unmanaged switch with several devices.
B:This action responds to a later condition: One new AP requires a higher PoE standard than the existing switch supports. A per-port standard mismatch differs from shared total budget shortage.
D:Radio RF power settings do not increase PSE power budget. The suggested approach is: Raise radio transmit power to create additional electrical PoE capacity.
Question 662
PoE access points fail to power when a switch powers all attached devices simultaneously. A colleague instead suggests: Raise radio transmit power to create additional electrical PoE capacity. Which finding MOST specifically explains why that suggestion is unsuitable?
- Broadly removing safeguards creates avoidable admission risk.
- A per-port standard mismatch differs from shared total budget shortage.
- Aggregate delivered power cannot exceed switch capabilities or device negotiation requirements.
- Radio RF power settings do not increase PSE power budget.
Explanation
Correct Answer
D:Radio RF power settings do not increase PSE power budget. This flaw directly concerns the proposed action: Raise radio transmit power to create additional electrical PoE capacity.
Incorrect Answers
A:This flaw concerns a different case in objective 5.2: A network port is error-disabled after a user attached a small unmanaged switch with several devices. The current rejected proposal is: Raise radio transmit power to create additional electrical PoE capacity.
B:This rationale belongs to a later changed condition: One new AP requires a higher PoE standard than the existing switch supports.
C:This explains why the recommended control works: Review switch PoE budget and the power class or standard required by the devices.
Question 663
PoE access points fail to power when a switch powers all attached devices simultaneously. After applying the solution 'Review switch PoE budget and the power class or standard required by the devices.', which observation MOST directly proves that the requirement was met?
- The approved device reconnects and no new port-security events appear.
- Approval is recorded for 'Review switch PoE budget and the power class or standard required by the devices.' but no operational validation is performed.
- Power diagnostics show stable watts and AP startup under the approved budget.
- Traffic shaping or capacity tests reduce queue drops under equivalent demand.
Explanation
Correct Answer
C:Power diagnostics show stable watts and AP startup under the approved budget. It tests the intended outcome because aggregate delivered power cannot exceed switch capabilities or device negotiation requirements.
Incorrect Answers
A:This observation is for a different condition: A network port is error-disabled after a user attached a small unmanaged switch with several devices. It does not directly test the target outcome: PoE access points fail to power when a switch powers all attached devices simultaneously.
B:The missing direct test is: Power diagnostics show stable watts and AP startup under the approved budget.
D:This test addresses a separate problem: Packets drop under high load because an uplink is saturated but interface CRC counters stay clean.
Question 664
The original case was: PoE access points fail to power when a switch powers all attached devices simultaneously. The requirement then changes: One new AP requires a higher PoE standard than the existing switch supports. Which revised action BEST meets this new condition?
- Power diagnostics show stable watts and AP startup under the approved budget.
- Raise radio transmit power to create additional electrical PoE capacity.
- Upgrade the PoE source or use approved injectors with compatible standard.
- Review switch PoE budget and the power class or standard required by the devices.
Explanation
Correct Answer
C:A per-port standard mismatch differs from shared total budget shortage. The revised requirement is: One new AP requires a higher PoE standard than the existing switch supports. The appropriate action is: Upgrade the PoE source or use approved injectors with compatible standard.
Incorrect Answers
A:Power diagnostics show stable watts and AP startup under the approved budget. The current requirement is: One new AP requires a higher PoE standard than the existing switch supports.
B:Radio RF power settings do not increase PSE power budget. It remains inappropriate in the revised context.
D:This is the original control. Aggregate delivered power cannot exceed switch capabilities or device negotiation requirements. It does not directly satisfy the revised requirement: One new AP requires a higher PoE standard than the existing switch supports.
Question 665
A switchport is administratively disabled and the attached server cannot establish link. Which action MOST directly meets the stated networking requirement?
- Change the DHCP default gateway while leaving the switchport shut.
- Enable the port under approved change control after validating intended connection.
- Investigate the violation and correct policy before a controlled recovery.
- Measure utilization, discards and queue depth to confirm congestion rather than cable corruption.
Explanation
Correct Answer
B:A shutdown port cannot forward or negotiate an operational link. This specifically resolves: A switchport is administratively disabled and the attached server cannot establish link.
Incorrect Answers
A:IP settings cannot enable an administratively disabled PHY. The suggested approach is: Change the DHCP default gateway while leaving the switchport shut.
C:This action responds to a later condition: The port becomes error-disabled after a rapid MAC-security violation. Error-disable has a distinct triggering condition requiring root-cause review.
D:This addresses another problem in objective 5.2: Packets drop under high load because an uplink is saturated but interface CRC counters stay clean.
Question 666
A switchport is administratively disabled and the attached server cannot establish link. A colleague instead suggests: Change the DHCP default gateway while leaving the switchport shut. Which finding MOST specifically explains why that suggestion is unsuitable?
- Error-disable has a distinct triggering condition requiring root-cause review.
- A shutdown port cannot forward or negotiate an operational link.
- IP settings cannot enable an administratively disabled PHY.
- Packet loss is not automatically evidence of optical failure.
Explanation
Correct Answer
C:IP settings cannot enable an administratively disabled PHY. This flaw directly concerns the proposed action: Change the DHCP default gateway while leaving the switchport shut.
Incorrect Answers
A:This rationale belongs to a later changed condition: The port becomes error-disabled after a rapid MAC-security violation.
B:This explains why the recommended control works: Enable the port under approved change control after validating intended connection.
D:This flaw concerns a different case in objective 5.2: Packets drop under high load because an uplink is saturated but interface CRC counters stay clean. The current rejected proposal is: Change the DHCP default gateway while leaving the switchport shut.
Question 667
A switchport is administratively disabled and the attached server cannot establish link. After applying the solution 'Enable the port under approved change control after validating intended connection.', which observation MOST directly proves that the requirement was met?
- Approval is recorded for 'Enable the port under approved change control after validating intended connection.' but no operational validation is performed.
- Interface status transitions to up and the server exchanges expected frames.
- Traffic shaping or capacity tests reduce queue drops under equivalent demand.
- Cleaning or replacing the bad segment restores receive power and stable frames.
Explanation
Correct Answer
B:Interface status transitions to up and the server exchanges expected frames. It tests the intended outcome because a shutdown port cannot forward or negotiate an operational link.
Incorrect Answers
A:The missing direct test is: Interface status transitions to up and the server exchanges expected frames.
C:This observation is for a different condition: Packets drop under high load because an uplink is saturated but interface CRC counters stay clean. It does not directly test the target outcome: A switchport is administratively disabled and the attached server cannot establish link.
D:This test addresses a separate problem: A new optic shows low receive light power and a rising bit error rate despite matching nominal speed.
Question 668
The original case was: A switchport is administratively disabled and the attached server cannot establish link. The requirement then changes: The port becomes error-disabled after a rapid MAC-security violation. Which revised action BEST meets this new condition?
- Interface status transitions to up and the server exchanges expected frames.
- Investigate the violation and correct policy before a controlled recovery.
- Enable the port under approved change control after validating intended connection.
- Change the DHCP default gateway while leaving the switchport shut.
Explanation
Correct Answer
B:Error-disable has a distinct triggering condition requiring root-cause review. The revised requirement is: The port becomes error-disabled after a rapid MAC-security violation. The appropriate action is: Investigate the violation and correct policy before a controlled recovery.
Incorrect Answers
A:Interface status transitions to up and the server exchanges expected frames. The current requirement is: The port becomes error-disabled after a rapid MAC-security violation.
C:This is the original control. A shutdown port cannot forward or negotiate an operational link. It does not directly satisfy the revised requirement: The port becomes error-disabled after a rapid MAC-security violation.
D:IP settings cannot enable an administratively disabled PHY. It remains inappropriate in the revised context.
Question 669
A network port is error-disabled after a user attached a small unmanaged switch with several devices. Which action MOST directly meets the stated networking requirement?
- Measure optical power and inspect connector cleanliness, bends and link distance.
- Configure supported voice/data policy and approved MAC limits.
- Disable all port security across the campus to avoid this incident.
- Identify the port-security trigger, remove unauthorized devices and restore under policy.
Explanation
Correct Answer
D:Security violations can intentionally disable ports to contain unexpected endpoint fan-out. This specifically resolves: A network port is error-disabled after a user attached a small unmanaged switch with several devices.
Incorrect Answers
A:This addresses another problem in objective 5.2: A new optic shows low receive light power and a rising bit error rate despite matching nominal speed.
B:This action responds to a later condition: The company officially authorizes a multi-device phone and PC arrangement. Legitimate fan-out needs a scoped policy exception instead of globally disabling controls.
C:Broadly removing safeguards creates avoidable admission risk. The suggested approach is: Disable all port security across the campus to avoid this incident.
Question 670
A network port is error-disabled after a user attached a small unmanaged switch with several devices. A colleague instead suggests: Disable all port security across the campus to avoid this incident. Which finding MOST specifically explains why that suggestion is unsuitable?
- Legitimate fan-out needs a scoped policy exception instead of globally disabling controls.
- Security violations can intentionally disable ports to contain unexpected endpoint fan-out.
- Firewall policy cannot correct optical signal attenuation.
- Broadly removing safeguards creates avoidable admission risk.
Explanation
Correct Answer
D:Broadly removing safeguards creates avoidable admission risk. This flaw directly concerns the proposed action: Disable all port security across the campus to avoid this incident.
Incorrect Answers
A:This rationale belongs to a later changed condition: The company officially authorizes a multi-device phone and PC arrangement.
B:This explains why the recommended control works: Identify the port-security trigger, remove unauthorized devices and restore under policy.
C:This flaw concerns a different case in objective 5.2: A new optic shows low receive light power and a rising bit error rate despite matching nominal speed. The current rejected proposal is: Disable all port security across the campus to avoid this incident.