Cisco 300-610 Practice Test 38
Question 370
At a modular X-Series compute design, the architecture standards group considers the recurring risk: X-Series blades require 100G-class east-west throughput but the selected FI uplink design provides only low aggregate uplink capacity. The team needs a defensible design decision rather than a vendor feature checklist. Which continuing design control best prevents the same problem from recurring?
- Review application evacuation steps in chassis maintenance runbooks.
- Re-evaluate FI uplink expansion before adding data-heavy blades.
- Track integrated release qualification before approving future changes.
- Track actual energy and thermal utilization before increasing node density.
Explanation
Correct Answer
B:The most relevant ongoing safeguard is: Re-evaluate FI uplink expansion before adding data-heavy blades. The risk it addresses is: X-Series blades require 100G-class east-west throughput but the selected FI uplink design provides only low aggregate uplink capacity. This check is tied to the technical principle: Fabric module and FI uplink selection must account for compute workload traffic and oversubscription independently of blade CPU/GPU specification. The immediate correction remains: Plan appropriate fabric module, FI and upstream bandwidth based on workload traffic measurements. Periodically validate the safeguard through two different observations. Estimate server east-west and north-south rates under concurrency Measure projected uplink saturation with one network path unavailable. The continuing acceptance target is: Compute nodes receive the design throughput in both normal and expected degraded operation.
Incorrect Answers
A:This is a continuing control for compute hot-swap versus application state; its underlying principle is: Hardware serviceability does not automatically provide application HA or preserved in-memory state. The recurring risk here is different: X-Series blades require 100G-class east-west throughput but the selected FI uplink design provides only low aggregate uplink capacity. The appropriate ongoing control must prevent recurrence of that particular failure, not just the separate issue of: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The intended long-term acceptance condition remains: Compute nodes receive the design throughput in both normal and expected degraded operation.
C:This is a continuing control for ucs x-series firmware rollout constraints; its underlying principle is: UCS domain components and server adapters require supported release combinations, even when each device is individually upgradeable. The recurring risk here is different: X-Series blades require 100G-class east-west throughput but the selected FI uplink design provides only low aggregate uplink capacity. The appropriate ongoing control must prevent recurrence of that particular failure, not just the separate issue of: A mixed UCS X-Series and FI rollout upgrades chassis fabric modules and server firmware simultaneously without validating a supported interoperability matrix. The intended long-term acceptance condition remains: Compute nodes receive the design throughput in both normal and expected degraded operation.
D:This is a continuing control for ucs x-series rack power density; its underlying principle is: Physical rack units are not equivalent to electrical capacity; chassis population and accelerator power require realistic headroom. The recurring risk here is different: X-Series blades require 100G-class east-west throughput but the selected FI uplink design provides only low aggregate uplink capacity. The appropriate ongoing control must prevent recurrence of that particular failure, not just the separate issue of: A dense X-Series deployment fits physically but exceeds rack and data-center power distribution under maximum workload. The intended long-term acceptance condition remains: Compute nodes receive the design throughput in both normal and expected degraded operation.
Question 371
At a modular X-Series compute design, a proposed deployment has this failure mode: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The maintenance plan must not disrupt unrelated tenants. Which design correction most directly addresses this specific failure or requirement?
- Design application failover, workload evacuation and restore paths independently of chassis service procedures.
- Size rack PDUs, power supplies and cooling for supported fully loaded chassis scenarios.
- Clone or update supported Intersight server-profile templates after validating hardware-specific policy fields.
- Select a module and fabric placement model matched to measured intra- and inter-node collective behavior.
Explanation
Correct Answer
C:The relevant failure is: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The technical distinction is: Domain profiles, server profiles and adapter policy compatibility govern how X-Series resources are provisioned. The targeted correction is: Clone or update supported Intersight server-profile templates after validating hardware-specific policy fields. Before changing the design, check two independent observations. Compare discovered server inventory against effective profile constraints Dry-run or stage profile deployment on one eligible node. Accept the change only if: New X-Series nodes associate successfully without disruptive fleet-wide policy changes.
Incorrect Answers
A:This action targets compute hot-swap versus application state, where the mechanism is: Hardware serviceability does not automatically provide application HA or preserved in-memory state. That is a separate condition from the problem in this question: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. Even a successful repair of the alternative would not establish the required result: New X-Series nodes associate successfully without disruptive fleet-wide policy changes. The applicable design change must address the diagnosed mechanism of the stated case, not the neighboring design problem.
B:This action targets ucs x-series rack power density, where the mechanism is: Physical rack units are not equivalent to electrical capacity; chassis population and accelerator power require realistic headroom. That is a separate condition from the problem in this question: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. Even a successful repair of the alternative would not establish the required result: New X-Series nodes associate successfully without disruptive fleet-wide policy changes. The applicable design change must address the diagnosed mechanism of the stated case, not the neighboring design problem.
D:This action targets ucs x-series high-speed gpu workload locality, where the mechanism is: Intra-node accelerator communication and inter-node network traffic use different links and performance budgets. That is a separate condition from the problem in this question: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. Even a successful repair of the alternative would not establish the required result: New X-Series nodes associate successfully without disruptive fleet-wide policy changes. The applicable design change must address the diagnosed mechanism of the stated case, not the neighboring design problem.
Question 372
At a mission-critical UCS blade installation, the cause remains unconfirmed for this reported issue: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. Acceptance requires evidence from the running system, not just the saved design. Which pair of observations most directly tests the proposed diagnosis before a change?
- Compare intended version set against Cisco-supported interoperability matrix; validate one-node networking/storage paths after a staged upgrade.
- Compare proposed GPU and PCIe node requirements to supported chassis topology; inspect fabric module and server generation compatibility guidance.
- Inspect hypervisor or application live migration requirements; test workload continuity during planned removal of an eligible node.
- Compare discovered server inventory against effective profile constraints; dry-run or stage profile deployment on one eligible node.
Explanation
Correct Answer
D:The first observation is: Compare discovered server inventory against effective profile constraints The independent second observation is: Dry-run or stage profile deployment on one eligible node. Together they test the proposed diagnosis of this incident: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The underlying technical principle is: Domain profiles, server profiles and adapter policy compatibility govern how X-Series resources are provisioned. If those checks confirm it, the appropriate next action is: Clone or update supported Intersight server-profile templates after validating hardware-specific policy fields. The expected measurable result is: New X-Series nodes associate successfully without disruptive fleet-wide policy changes.
Incorrect Answers
A:These observations investigate ucs x-series firmware rollout constraints; they would be useful if the symptoms were: A mixed UCS X-Series and FI rollout upgrades chassis fabric modules and server firmware simultaneously without validating a supported interoperability matrix. That alternative rests on the principle: UCS domain components and server adapters require supported release combinations, even when each device is individually upgradeable. The question instead asks for evidence about: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The discriminating observations here are: Compare discovered server inventory against effective profile constraints Dry-run or stage profile deployment on one eligible node.
B:These observations investigate ucs x-series compute and pcie scalability; they would be useful if the symptoms were: A UCS X-Series proposal adds accelerator-heavy nodes without validating chassis fabric and PCIe connectivity capabilities. That alternative rests on the principle: UCS X-Series modular compute and optional PCIe expansion depend on compatible chassis, fabric modules, adapters and supported resource architecture. The question instead asks for evidence about: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The discriminating observations here are: Compare discovered server inventory against effective profile constraints Dry-run or stage profile deployment on one eligible node.
C:These observations investigate compute hot-swap versus application state; they would be useful if the symptoms were: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. That alternative rests on the principle: Hardware serviceability does not automatically provide application HA or preserved in-memory state. The question instead asks for evidence about: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The discriminating observations here are: Compare discovered server inventory against effective profile constraints Dry-run or stage profile deployment on one eligible node.
Question 373
At an Intersight-managed UCS cluster, a failure review must identify the central technical cause of: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. One component outage must remain inside the agreed availability budget. Which engineering principle best explains the observed behavior?
- Hardware serviceability does not automatically provide application HA or preserved in-memory state.
- Intra-node accelerator communication and inter-node network traffic use different links and performance budgets.
- UCS X-Series modular compute and optional PCIe expansion depend on compatible chassis, fabric modules, adapters and supported resource architecture.
- Domain profiles, server profiles and adapter policy compatibility govern how X-Series resources are provisioned.
Explanation
Correct Answer
D:The controlling technical principle is: Domain profiles, server profiles and adapter policy compatibility govern how X-Series resources are provisioned. This matters because the reported design failure is: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The first diagnostic check is: Compare discovered server inventory against effective profile constraints The independent check is: Dry-run or stage profile deployment on one eligible node. These facts support the targeted intervention: Clone or update supported Intersight server-profile templates after validating hardware-specific policy fields. Confirm that the resulting design meets this condition: New X-Series nodes associate successfully without disruptive fleet-wide policy changes.
Incorrect Answers
A:The offered principle describes compute hot-swap versus application state: Hardware serviceability does not automatically provide application HA or preserved in-memory state. That is useful for a distinct incident, such as: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. It does not account for the reported failure: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The governing principle in this situation is: Domain profiles, server profiles and adapter policy compatibility govern how X-Series resources are provisioned.
B:The offered principle describes ucs x-series high-speed gpu workload locality: Intra-node accelerator communication and inter-node network traffic use different links and performance budgets. That is useful for a distinct incident, such as: A GPU application spans several compute modules with heavy collective traffic but its design assumes in-chassis accelerator bandwidth extends transparently across racks. It does not account for the reported failure: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The governing principle in this situation is: Domain profiles, server profiles and adapter policy compatibility govern how X-Series resources are provisioned.
C:The offered principle describes ucs x-series compute and pcie scalability: UCS X-Series modular compute and optional PCIe expansion depend on compatible chassis, fabric modules, adapters and supported resource architecture. That is useful for a distinct incident, such as: A UCS X-Series proposal adds accelerator-heavy nodes without validating chassis fabric and PCIe connectivity capabilities. It does not account for the reported failure: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The governing principle in this situation is: Domain profiles, server profiles and adapter policy compatibility govern how X-Series resources are provisioned.
Question 374
At a dual-fabric virtualization host estate, the service owner needs evidence of resolution for: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The architect must preserve the intended failure domains. Which measured result most directly proves the original requirement is satisfied?
- New X-Series nodes associate successfully without disruptive fleet-wide policy changes.
- Node maintenance meets the application recovery target without relying on mechanical hot-swap as HA.
- Full planned compute population operates within redundant power and thermal envelopes.
- Compute nodes receive the design throughput in both normal and expected degraded operation.
Explanation
Correct Answer
A:The relevant measurable success criterion is: New X-Series nodes associate successfully without disruptive fleet-wide policy changes. It addresses the original reported defect: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. A saved design or configuration command alone does not establish that outcome. Observe the affected system in two independent ways: Compare discovered server inventory against effective profile constraints Dry-run or stage profile deployment on one eligible node. The correction being evaluated is: Clone or update supported Intersight server-profile templates after validating hardware-specific policy fields. The underlying reason that correction matters is: Domain profiles, server profiles and adapter policy compatibility govern how X-Series resources are provisioned.
Incorrect Answers
B:This metric would help validate a correction to compute hot-swap versus application state, rather than the original reported issue. The other issue is: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. Here the defect to be resolved is: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The expected measurable outcome for the actual incident is: New X-Series nodes associate successfully without disruptive fleet-wide policy changes. A positive result for the other service would not prove this requirement is met.
C:This metric would help validate a correction to ucs x-series rack power density, rather than the original reported issue. The other issue is: A dense X-Series deployment fits physically but exceeds rack and data-center power distribution under maximum workload. Here the defect to be resolved is: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The expected measurable outcome for the actual incident is: New X-Series nodes associate successfully without disruptive fleet-wide policy changes. A positive result for the other service would not prove this requirement is met.
D:This metric would help validate a correction to ucs x-series network oversubscription, rather than the original reported issue. The other issue is: X-Series blades require 100G-class east-west throughput but the selected FI uplink design provides only low aggregate uplink capacity. Here the defect to be resolved is: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The expected measurable outcome for the actual incident is: New X-Series nodes associate successfully without disruptive fleet-wide policy changes. A positive result for the other service would not prove this requirement is met.
Question 375
At a Cisco UCS domain expansion, after correction, the team wants to prevent recurrence of: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The team needs a defensible design decision rather than a vendor feature checklist. Which continuing design control best prevents the same problem from recurring?
- Re-evaluate FI uplink expansion before adding data-heavy blades.
- Requalify modules when new PCIe accelerator generations arrive.
- Review application evacuation steps in chassis maintenance runbooks.
- Version templates and test hardware compatibility before full-scale rollout.
Explanation
Correct Answer
D:The most relevant ongoing safeguard is: Version templates and test hardware compatibility before full-scale rollout. The risk it addresses is: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. This check is tied to the technical principle: Domain profiles, server profiles and adapter policy compatibility govern how X-Series resources are provisioned. The immediate correction remains: Clone or update supported Intersight server-profile templates after validating hardware-specific policy fields. Periodically validate the safeguard through two different observations. Compare discovered server inventory against effective profile constraints Dry-run or stage profile deployment on one eligible node. The continuing acceptance target is: New X-Series nodes associate successfully without disruptive fleet-wide policy changes.
Incorrect Answers
A:This is a continuing control for ucs x-series network oversubscription; its underlying principle is: Fabric module and FI uplink selection must account for compute workload traffic and oversubscription independently of blade CPU/GPU specification. The recurring risk here is different: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The appropriate ongoing control must prevent recurrence of that particular failure, not just the separate issue of: X-Series blades require 100G-class east-west throughput but the selected FI uplink design provides only low aggregate uplink capacity. The intended long-term acceptance condition remains: New X-Series nodes associate successfully without disruptive fleet-wide policy changes.
B:This is a continuing control for ucs x-series compute and pcie scalability; its underlying principle is: UCS X-Series modular compute and optional PCIe expansion depend on compatible chassis, fabric modules, adapters and supported resource architecture. The recurring risk here is different: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The appropriate ongoing control must prevent recurrence of that particular failure, not just the separate issue of: A UCS X-Series proposal adds accelerator-heavy nodes without validating chassis fabric and PCIe connectivity capabilities. The intended long-term acceptance condition remains: New X-Series nodes associate successfully without disruptive fleet-wide policy changes.
C:This is a continuing control for compute hot-swap versus application state; its underlying principle is: Hardware serviceability does not automatically provide application HA or preserved in-memory state. The recurring risk here is different: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The appropriate ongoing control must prevent recurrence of that particular failure, not just the separate issue of: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The intended long-term acceptance condition remains: New X-Series nodes associate successfully without disruptive fleet-wide policy changes.
Question 376
At a Cisco UCS domain expansion, a design review reports the following issue: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The maintenance plan must not disrupt unrelated tenants. Which design correction most directly addresses this specific failure or requirement?
- Clone or update supported Intersight server-profile templates after validating hardware-specific policy fields.
- Select a module and fabric placement model matched to measured intra- and inter-node collective behavior.
- Stage the supported integrated release and approved upgrade order with a rollback plan and representative test node.
- Design application failover, workload evacuation and restore paths independently of chassis service procedures.
Explanation
Correct Answer
D:The relevant failure is: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The technical distinction is: Hardware serviceability does not automatically provide application HA or preserved in-memory state. The targeted correction is: Design application failover, workload evacuation and restore paths independently of chassis service procedures. Before changing the design, check two independent observations. Inspect hypervisor or application live migration requirements Test workload continuity during planned removal of an eligible node. Accept the change only if: Node maintenance meets the application recovery target without relying on mechanical hot-swap as HA.
Incorrect Answers
A:This action targets ucs x-series service-profile inheritance, where the mechanism is: Domain profiles, server profiles and adapter policy compatibility govern how X-Series resources are provisioned. That is a separate condition from the problem in this question: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. Even a successful repair of the alternative would not establish the required result: Node maintenance meets the application recovery target without relying on mechanical hot-swap as HA. The applicable design change must address the diagnosed mechanism of the stated case, not the neighboring design problem.
B:This action targets ucs x-series high-speed gpu workload locality, where the mechanism is: Intra-node accelerator communication and inter-node network traffic use different links and performance budgets. That is a separate condition from the problem in this question: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. Even a successful repair of the alternative would not establish the required result: Node maintenance meets the application recovery target without relying on mechanical hot-swap as HA. The applicable design change must address the diagnosed mechanism of the stated case, not the neighboring design problem.
C:This action targets ucs x-series firmware rollout constraints, where the mechanism is: UCS domain components and server adapters require supported release combinations, even when each device is individually upgradeable. That is a separate condition from the problem in this question: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. Even a successful repair of the alternative would not establish the required result: Node maintenance meets the application recovery target without relying on mechanical hot-swap as HA. The applicable design change must address the diagnosed mechanism of the stated case, not the neighboring design problem.
Question 377
At a modular X-Series compute design, two engineers propose competing diagnoses for this condition: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. Acceptance requires evidence from the running system, not just the saved design. Which pair of observations most directly tests the proposed diagnosis before a change?
- Compare intended version set against Cisco-supported interoperability matrix; validate one-node networking/storage paths after a staged upgrade.
- Compare discovered server inventory against effective profile constraints; dry-run or stage profile deployment on one eligible node.
- Inspect hypervisor or application live migration requirements; test workload continuity during planned removal of an eligible node.
- Estimate server east-west and north-south rates under concurrency; measure projected uplink saturation with one network path unavailable.
Explanation
Correct Answer
C:The first observation is: Inspect hypervisor or application live migration requirements The independent second observation is: Test workload continuity during planned removal of an eligible node. Together they test the proposed diagnosis of this incident: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The underlying technical principle is: Hardware serviceability does not automatically provide application HA or preserved in-memory state. If those checks confirm it, the appropriate next action is: Design application failover, workload evacuation and restore paths independently of chassis service procedures. The expected measurable result is: Node maintenance meets the application recovery target without relying on mechanical hot-swap as HA.
Incorrect Answers
A:These observations investigate ucs x-series firmware rollout constraints; they would be useful if the symptoms were: A mixed UCS X-Series and FI rollout upgrades chassis fabric modules and server firmware simultaneously without validating a supported interoperability matrix. That alternative rests on the principle: UCS domain components and server adapters require supported release combinations, even when each device is individually upgradeable. The question instead asks for evidence about: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The discriminating observations here are: Inspect hypervisor or application live migration requirements Test workload continuity during planned removal of an eligible node.
B:These observations investigate ucs x-series service-profile inheritance; they would be useful if the symptoms were: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. That alternative rests on the principle: Domain profiles, server profiles and adapter policy compatibility govern how X-Series resources are provisioned. The question instead asks for evidence about: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The discriminating observations here are: Inspect hypervisor or application live migration requirements Test workload continuity during planned removal of an eligible node.
D:These observations investigate ucs x-series network oversubscription; they would be useful if the symptoms were: X-Series blades require 100G-class east-west throughput but the selected FI uplink design provides only low aggregate uplink capacity. That alternative rests on the principle: Fabric module and FI uplink selection must account for compute workload traffic and oversubscription independently of blade CPU/GPU specification. The question instead asks for evidence about: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The discriminating observations here are: Inspect hypervisor or application live migration requirements Test workload continuity during planned removal of an eligible node.
Question 378
At a mission-critical UCS blade installation, the design group challenges an assumption behind this issue: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. One component outage must remain inside the agreed availability budget. Which engineering principle best explains the observed behavior?
- Physical rack units are not equivalent to electrical capacity; chassis population and accelerator power require realistic headroom.
- Intra-node accelerator communication and inter-node network traffic use different links and performance budgets.
- Domain profiles, server profiles and adapter policy compatibility govern how X-Series resources are provisioned.
- Hardware serviceability does not automatically provide application HA or preserved in-memory state.
Explanation
Correct Answer
D:The controlling technical principle is: Hardware serviceability does not automatically provide application HA or preserved in-memory state. This matters because the reported design failure is: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The first diagnostic check is: Inspect hypervisor or application live migration requirements The independent check is: Test workload continuity during planned removal of an eligible node. These facts support the targeted intervention: Design application failover, workload evacuation and restore paths independently of chassis service procedures. Confirm that the resulting design meets this condition: Node maintenance meets the application recovery target without relying on mechanical hot-swap as HA.
Incorrect Answers
A:The offered principle describes ucs x-series rack power density: Physical rack units are not equivalent to electrical capacity; chassis population and accelerator power require realistic headroom. That is useful for a distinct incident, such as: A dense X-Series deployment fits physically but exceeds rack and data-center power distribution under maximum workload. It does not account for the reported failure: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The governing principle in this situation is: Hardware serviceability does not automatically provide application HA or preserved in-memory state.
B:The offered principle describes ucs x-series high-speed gpu workload locality: Intra-node accelerator communication and inter-node network traffic use different links and performance budgets. That is useful for a distinct incident, such as: A GPU application spans several compute modules with heavy collective traffic but its design assumes in-chassis accelerator bandwidth extends transparently across racks. It does not account for the reported failure: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The governing principle in this situation is: Hardware serviceability does not automatically provide application HA or preserved in-memory state.
C:The offered principle describes ucs x-series service-profile inheritance: Domain profiles, server profiles and adapter policy compatibility govern how X-Series resources are provisioned. That is useful for a distinct incident, such as: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. It does not account for the reported failure: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The governing principle in this situation is: Hardware serviceability does not automatically provide application HA or preserved in-memory state.
Question 379
At an Intersight-managed UCS cluster, a change has been proposed for the following condition: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The architect must preserve the intended failure domains. Which measured result most directly proves the original requirement is satisfied?
- Node maintenance meets the application recovery target without relying on mechanical hot-swap as HA.
- All components run compatible software with retained data and SAN reachability.
- New X-Series nodes associate successfully without disruptive fleet-wide policy changes.
- Full planned compute population operates within redundant power and thermal envelopes.
Explanation
Correct Answer
A:The relevant measurable success criterion is: Node maintenance meets the application recovery target without relying on mechanical hot-swap as HA. It addresses the original reported defect: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. A saved design or configuration command alone does not establish that outcome. Observe the affected system in two independent ways: Inspect hypervisor or application live migration requirements Test workload continuity during planned removal of an eligible node. The correction being evaluated is: Design application failover, workload evacuation and restore paths independently of chassis service procedures. The underlying reason that correction matters is: Hardware serviceability does not automatically provide application HA or preserved in-memory state.
Incorrect Answers
B:This metric would help validate a correction to ucs x-series firmware rollout constraints, rather than the original reported issue. The other issue is: A mixed UCS X-Series and FI rollout upgrades chassis fabric modules and server firmware simultaneously without validating a supported interoperability matrix. Here the defect to be resolved is: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The expected measurable outcome for the actual incident is: Node maintenance meets the application recovery target without relying on mechanical hot-swap as HA. A positive result for the other service would not prove this requirement is met.
C:This metric would help validate a correction to ucs x-series service-profile inheritance, rather than the original reported issue. The other issue is: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. Here the defect to be resolved is: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The expected measurable outcome for the actual incident is: Node maintenance meets the application recovery target without relying on mechanical hot-swap as HA. A positive result for the other service would not prove this requirement is met.
D:This metric would help validate a correction to ucs x-series rack power density, rather than the original reported issue. The other issue is: A dense X-Series deployment fits physically but exceeds rack and data-center power distribution under maximum workload. Here the defect to be resolved is: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The expected measurable outcome for the actual incident is: Node maintenance meets the application recovery target without relying on mechanical hot-swap as HA. A positive result for the other service would not prove this requirement is met.
Question 380
At a dual-fabric virtualization host estate, a post-incident design review focuses on preventing: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The team needs a defensible design decision rather than a vendor feature checklist. Which continuing design control best prevents the same problem from recurring?
- Version templates and test hardware compatibility before full-scale rollout.
- Re-evaluate FI uplink expansion before adding data-heavy blades.
- Review application evacuation steps in chassis maintenance runbooks.
- Track actual energy and thermal utilization before increasing node density.
Explanation
Correct Answer
C:The most relevant ongoing safeguard is: Review application evacuation steps in chassis maintenance runbooks. The risk it addresses is: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. This check is tied to the technical principle: Hardware serviceability does not automatically provide application HA or preserved in-memory state. The immediate correction remains: Design application failover, workload evacuation and restore paths independently of chassis service procedures. Periodically validate the safeguard through two different observations. Inspect hypervisor or application live migration requirements Test workload continuity during planned removal of an eligible node. The continuing acceptance target is: Node maintenance meets the application recovery target without relying on mechanical hot-swap as HA.
Incorrect Answers
A:This is a continuing control for ucs x-series service-profile inheritance; its underlying principle is: Domain profiles, server profiles and adapter policy compatibility govern how X-Series resources are provisioned. The recurring risk here is different: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The appropriate ongoing control must prevent recurrence of that particular failure, not just the separate issue of: An Intersight-managed X-Series policy template uses settings suited to a previous chassis generation and fails on a new node. The intended long-term acceptance condition remains: Node maintenance meets the application recovery target without relying on mechanical hot-swap as HA.
B:This is a continuing control for ucs x-series network oversubscription; its underlying principle is: Fabric module and FI uplink selection must account for compute workload traffic and oversubscription independently of blade CPU/GPU specification. The recurring risk here is different: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The appropriate ongoing control must prevent recurrence of that particular failure, not just the separate issue of: X-Series blades require 100G-class east-west throughput but the selected FI uplink design provides only low aggregate uplink capacity. The intended long-term acceptance condition remains: Node maintenance meets the application recovery target without relying on mechanical hot-swap as HA.
D:This is a continuing control for ucs x-series rack power density; its underlying principle is: Physical rack units are not equivalent to electrical capacity; chassis population and accelerator power require realistic headroom. The recurring risk here is different: An operator assumes a modular X-Series compute node can be replaced without application disruption simply because it is physically serviceable. The appropriate ongoing control must prevent recurrence of that particular failure, not just the separate issue of: A dense X-Series deployment fits physically but exceeds rack and data-center power distribution under maximum workload. The intended long-term acceptance condition remains: Node maintenance meets the application recovery target without relying on mechanical hot-swap as HA.