cert
cert-1
cert-2

Pass CompTIA SK0-005 Exam in First Attempt Guaranteed!

Get 100% Latest Exam Questions, Accurate & Verified Answers to Pass the Actual Exam!
30 Days Free Updates, Instant Download!

cert-5
cert-6
SK0-005 Exam - Verified By Experts
SK0-005 Premium Bundle
$29.98

SK0-005 Premium Bundle

$79.99
$109.97
  • Premium File 617 Questions & Answers. Last update: Nov 13, 2026
  • Training Course 139 Video Lectures
  • Study Guide 533 Pages
 
$109.97
$79.99
accept 21 downloads in last 7 days
block-screenshots
Purchase CompTIA SK0-005 Exam Training Products Individually
CompTIA SK0-005 Premium File
Premium File 617 Q&A
$76.99$69.99
CompTIA SK0-005 Video Training Course
Training Course 139 Lectures
$21.99 $19.99
CompTIA SK0-005 PDF Study Guide
Study Guide 533 Pages
$21.99 $19.99
CompTIA SK0-005 Practice Test 8

Question 70

A change board is planning a verified response to this server event: An operations team swaps a failed RAID member and assumes protection is restored before the controller completes rebuild and consistency checks. For the Hot spare eligibility and rebuild supervision issue, which response elements belong in the approved plan? Select TWO answers.

  1. Configure consistent WWPN zoning and LUN masking on independent fabrics, then enable supported host multipath policies.
  2. The correct mounted filesystem reflects the new usable capacity without data loss and application writes succeed.
  3. Provide compatible spare capacity and interface, replace the failed member, monitor the rebuild and verify array redundancy after completion.
  4. Declare an array healthy as soon as a replacement disk's activity light turns on.
  5. Examine controller event logs, physical drive size/type, spare assignment, rebuild progress and media-error counters.

Explanation

Correct Answer

C:

An array may remain vulnerable while degraded or rebuilding; a spare is useful only if the controller can use it. A successful outcome is: The rebuild completes without new errors and the controller reports all expected redundancy restored.

E:

These observations investigate the exact Hot spare eligibility and rebuild supervision failure rather than unrelated components. The expected technical relationship is: An array may remain vulnerable while degraded or rebuilding; a spare is useful only if the controller can use it.

Incorrect Answers

A:

That option would configure consistent WWPN zoning and LUN masking on independent fabrics, then enable supported host multipath policies, but it addresses a different concern. An array may remain vulnerable while degraded or rebuilding; a spare is useful only if the controller can use it.

B:

This statement concerns Filesystem growth after LUN expansion, a different Server+ technical control. It does not directly address the reported Hot spare eligibility and rebuild supervision fault or prove its repair. For this incident, the relevant principle is: An array may remain vulnerable while degraded or rebuilding; a spare is useful only if the controller can use it.

D:

This is the unsafe shortcut in the Hot spare eligibility and rebuild supervision scenario, not a justified remediation or diagnostic. Discriminate using: Examine controller event logs, physical drive size/type, spare assignment, rebuild progress and media-error counters.

Question 71

A server administrator is investigating a server issue involving fibre channel san zoning and multipath: An ESXi cluster sees only one storage path because a new host's WWPN was omitted from the second fabric's zoning configuration. The change must address the documented fault without creating unrelated risk. Which corrective action is most appropriate? Select ONE best answer.

  1. Select enterprise SSD endurance for the expected write volume and monitor NVMe health, utilization and replacement thresholds.
  2. Expose every LUN to every host and assume extra FC cables automatically create safe paths.
  3. Configure consistent WWPN zoning and LUN masking on independent fabrics, then enable supported host multipath policies.
  4. Choose a RAID level that meets measured capacity, write profile and disk-failure tolerance requirements, and retain independent backups.

Explanation

Correct Answer

C:

SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. For this case, An ESXi cluster sees only one storage path because a new host's WWPN was omitted from the second fabric's zoning configuration.

Incorrect Answers

A:

That option would select enterprise SSD endurance for the expected write volume and monitor NVMe health, utilization and replacement thresholds, but it addresses a different concern. SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone.

B:

This is the unsafe shortcut in the Fibre Channel SAN zoning and multipath scenario, not a justified remediation or diagnostic. SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone.

D:

That option would choose a RAID level that meets measured capacity, write profile and disk-failure tolerance requirements, and retain independent backups, but it addresses a different concern. SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone.

Question 72

While reviewing the CompTIA Server+ administration incident, a technician learns: An ESXi cluster sees only one storage path because a new host's WWPN was omitted from the second fabric's zoning configuration. Which principle most directly explains how to address the described issue safely? Select ONE best answer.

  1. SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone.
  2. An array may remain vulnerable while degraded or rebuilding; a spare is useful only if the controller can use it.
  3. Block-device capacity, partition or logical-volume capacity and filesystem capacity are separate layers that must be reconciled.
  4. Stable iSCSI performance and resilience depend on end-to-end network path design and host multipathing, not simply the number of NICs.

Explanation

Correct Answer

A:

This is the controlling principle for the reported Fibre Channel SAN zoning and multipath incident. Scenario: An ESXi cluster sees only one storage path because a new host's WWPN was omitted from the second fabric's zoning configuration.

Incorrect Answers

B:

This statement concerns Hot spare eligibility and rebuild supervision, a different Server+ technical control. It does not directly address the reported Fibre Channel SAN zoning and multipath fault or prove its repair. For this incident, the relevant principle is: SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. A targeted investigation checks: Check HBA WWPNs, zone membership, array masking, fabric logins and host multipath path states. The desired recovery condition is: The host sees the intended LUN with active or standby paths on both fabrics and survives a single-fabric maintenance test.

C:

This statement concerns Filesystem growth after LUN expansion, a different Server+ technical control. It does not directly address the reported Fibre Channel SAN zoning and multipath fault or prove its repair. For this incident, the relevant principle is: SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. A targeted investigation checks: Check HBA WWPNs, zone membership, array masking, fabric logins and host multipath path states. The desired recovery condition is: The host sees the intended LUN with active or standby paths on both fabrics and survives a single-fabric maintenance test.

D:

This statement concerns iSCSI network isolation and MPIO, a different Server+ technical control. It does not directly address the reported Fibre Channel SAN zoning and multipath fault or prove its repair. For this incident, the relevant principle is: SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. A targeted investigation checks: Check HBA WWPNs, zone membership, array masking, fabric logins and host multipath path states. The desired recovery condition is: The host sees the intended LUN with active or standby paths on both fabrics and survives a single-fabric maintenance test.

Question 73

Before a server change is approved, the on-call engineer receives this incident report: An ESXi cluster sees only one storage path because a new host's WWPN was omitted from the second fabric's zoning configuration. Which evidence would most directly establish the stated root-cause hypothesis? Select ONE best answer.

  1. Check HBA WWPNs, zone membership, array masking, fabric logins and host multipath path states.
  2. Expose every LUN to every host and assume extra FC cables automatically create safe paths.
  3. Review workload I/O pattern, required fault tolerance, array health, usable capacity and rebuild time estimates.
  4. Inspect initiator sessions, target portals, VLAN paths, MTU agreement, switch queue drops and MPIO status.

Explanation

Correct Answer

A:

These observations investigate the exact Fibre Channel SAN zoning and multipath failure rather than unrelated components. Incident: An ESXi cluster sees only one storage path because a new host's WWPN was omitted from the second fabric's zoning configuration.

Incorrect Answers

B:

SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. This is the unsafe shortcut in the Fibre Channel SAN zoning and multipath scenario, not a justified remediation or diagnostic.

C:

For this incident, the relevant principle is: SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. This statement concerns RAID fault tolerance versus performance, a different Server+ technical control.

D:

For this incident, the relevant principle is: SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. A targeted investigation checks: Check HBA WWPNs, zone membership, array masking, fabric logins and host multipath path states.

Question 74

After the team implements a targeted remediation for Fibre Channel SAN zoning and multipath, the original incident was: An ESXi cluster sees only one storage path because a new host's WWPN was omitted from the second fabric's zoning configuration. Which acceptance criterion would best demonstrate a durable and safe resolution? Select ONE best answer.

  1. Devices remain within endurance, temperature and spare-capacity guidance and replacements occur before service-impacting failures.
  2. The port establishes the planned supported link speed with stable counters and no rising physical errors.
  3. The host sees the intended LUN with active or standby paths on both fabrics and survives a single-fabric maintenance test.
  4. The rebuild completes without new errors and the controller reports all expected redundancy restored.

Explanation

Correct Answer

C:

SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. Incident: An ESXi cluster sees only one storage path because a new host's WWPN was omitted from the second fabric's zoning configuration.

Incorrect Answers

A:

This statement concerns NVMe endurance and capacity monitoring, a different Server+ technical control. It does not directly address the reported Fibre Channel SAN zoning and multipath fault or prove its repair. For this incident, the relevant principle is: SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. A targeted investigation checks: Check HBA WWPNs, zone membership, array masking, fabric logins and host multipath path states. The desired recovery condition is: The host sees the intended LUN with active or standby paths on both fabrics and survives a single-fabric maintenance test.

B:

This statement concerns NIC media and transceiver compatibility, a different Server+ technical control. It does not directly address the reported Fibre Channel SAN zoning and multipath fault or prove its repair. For this incident, the relevant principle is: SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. A targeted investigation checks: Check HBA WWPNs, zone membership, array masking, fabric logins and host multipath path states. The desired recovery condition is: The host sees the intended LUN with active or standby paths on both fabrics and survives a single-fabric maintenance test.

D:

This statement concerns Hot spare eligibility and rebuild supervision, a different Server+ technical control. It does not directly address the reported Fibre Channel SAN zoning and multipath fault or prove its repair.

Question 75

A change board is planning a verified response to this server event: An ESXi cluster sees only one storage path because a new host's WWPN was omitted from the second fabric's zoning configuration. For the Fibre Channel SAN zoning and multipath issue, which response elements belong in the approved plan? Select ONE best answer.

  1. Configure consistent WWPN zoning and LUN masking on independent fabrics, then enable supported host multipath policies. Then validate the change by confirming: The host sees the intended LUN with active or standby paths on both fabrics and survives a single-fabric maintenance test.
  2. Trace PSU cords through PDU, UPS and breaker paths; compare load and failover ratings against peak demand.
  3. Use dedicated or appropriately isolated iSCSI paths with supported MPIO, correct initiator/target configuration and measured QoS.
  4. Expose every LUN to every host and assume extra FC cables automatically create safe paths.

Explanation

Correct Answer

A:

SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. The proposed change and outcome assessment work together for Fibre Channel SAN zoning and multipath.

Incorrect Answers

B:

That option would trace PSU cords through PDU, UPS and breaker paths; compare load and failover ratings against peak demand, but it addresses a different concern. SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone.

C:

That option would use dedicated or appropriately isolated iSCSI paths with supported MPIO, correct initiator/target configuration and measured QoS, but it addresses a different concern. SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone.

D:

This is the unsafe shortcut in the Fibre Channel SAN zoning and multipath scenario, not a justified remediation or diagnostic. Incident: An ESXi cluster sees only one storage path because a new host's WWPN was omitted from the second fabric's zoning configuration.

Question 76

A server administrator is investigating a server issue involving fibre channel san zoning and multipath: A database host can discover a LUN over fabric A but loses storage access whenever one HBA switch is maintained because fabric B has no mapped path. The change must address the documented fault without creating unrelated risk. Which corrective action is most appropriate? Select ONE best answer.

  1. Follow the motherboard and processor-qualified DIMM population map and validate supported capacity, speed, ranks and NUMA channel balance.
  2. Configure consistent WWPN zoning and LUN masking on independent fabrics, then enable supported host multipath policies.
  3. Expose every LUN to every host and assume extra FC cables automatically create safe paths.
  4. Check component hot-swap support, follow power isolation requirements and use approved ESD handling procedures.

Explanation

Correct Answer

B:

SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. For this case, A database host can discover a LUN over fabric A but loses storage access whenever one HBA switch is maintained because fabric B has no mapped path.

Incorrect Answers

A:

This statement concerns CPU memory compatibility and population, a different Server+ technical control. It does not directly address the reported Fibre Channel SAN zoning and multipath fault or prove its repair. For this incident, the relevant principle is: SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. A targeted investigation checks: Check HBA WWPNs, zone membership, array masking, fabric logins and host multipath path states. The desired recovery condition is: The host sees the intended LUN with active or standby paths on both fabrics and survives a single-fabric maintenance test.

C:

This is the unsafe shortcut in the Fibre Channel SAN zoning and multipath scenario, not a justified remediation or diagnostic. Incident: A database host can discover a LUN over fabric A but loses storage access whenever one HBA switch is maintained because fabric B has no mapped path.

D:

That option would check component hot-swap support, follow power isolation requirements and use approved ESD handling procedures, but it addresses a different concern. SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone.

Question 77

While reviewing the CompTIA Server+ administration incident, a technician learns: A database host can discover a LUN over fabric A but loses storage access whenever one HBA switch is maintained because fabric B has no mapped path. Which principle most directly explains how to address the described issue safely? Select ONE best answer.

  1. SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone.
  2. Serviceable components differ in whether live replacement is safe, while electrostatic discharge can damage electronics even when mains power is removed.
  3. Memory configuration depends on CPU/socket population and validated channel topology, not only DIMM physical fit or total gigabytes.
  4. Stable iSCSI performance and resilience depend on end-to-end network path design and host multipathing, not simply the number of NICs.

Explanation

Correct Answer

A:

This is the controlling principle for the reported Fibre Channel SAN zoning and multipath incident. Scenario: A database host can discover a LUN over fabric A but loses storage access whenever one HBA switch is maintained because fabric B has no mapped path.

Incorrect Answers

B:

This statement concerns ESD and hot-swap replacement procedure, a different Server+ technical control. It does not directly address the reported Fibre Channel SAN zoning and multipath fault or prove its repair. For this incident, the relevant principle is: SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. A targeted investigation checks: Check HBA WWPNs, zone membership, array masking, fabric logins and host multipath path states. The desired recovery condition is: The host sees the intended LUN with active or standby paths on both fabrics and survives a single-fabric maintenance test.

C:

This statement concerns CPU memory compatibility and population, a different Server+ technical control. It does not directly address the reported Fibre Channel SAN zoning and multipath fault or prove its repair.

D:

This statement concerns iSCSI network isolation and MPIO, a different Server+ technical control. It does not directly address the reported Fibre Channel SAN zoning and multipath fault or prove its repair. For this incident, the relevant principle is: SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. A targeted investigation checks: Check HBA WWPNs, zone membership, array masking, fabric logins and host multipath path states. The desired recovery condition is: The host sees the intended LUN with active or standby paths on both fabrics and survives a single-fabric maintenance test.

Question 78

Before a server change is approved, the on-call engineer receives this incident report: A database host can discover a LUN over fabric A but loses storage access whenever one HBA switch is maintained because fabric B has no mapped path. Which evidence would most directly establish the stated root-cause hypothesis? Select ONE best answer.

  1. Expose every LUN to every host and assume extra FC cables automatically create safe paths.
  2. Examine controller event logs, physical drive size/type, spare assignment, rebuild progress and media-error counters.
  3. Inspect initiator sessions, target portals, VLAN paths, MTU agreement, switch queue drops and MPIO status.
  4. Check HBA WWPNs, zone membership, array masking, fabric logins and host multipath path states.

Explanation

Correct Answer

D:

These observations investigate the exact Fibre Channel SAN zoning and multipath failure rather than unrelated components. Incident: A database host can discover a LUN over fabric A but loses storage access whenever one HBA switch is maintained because fabric B has no mapped path.

Incorrect Answers

A:

SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. Incident: A database host can discover a LUN over fabric A but loses storage access whenever one HBA switch is maintained because fabric B has no mapped path.

B:

For this incident, the relevant principle is: SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. Incident: A database host can discover a LUN over fabric A but loses storage access whenever one HBA switch is maintained because fabric B has no mapped path.

C:

For this incident, the relevant principle is: SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. This statement concerns iSCSI network isolation and MPIO, a different Server+ technical control.

Question 79

After the team implements a targeted remediation for Fibre Channel SAN zoning and multipath, the original incident was: A database host can discover a LUN over fabric A but loses storage access whenever one HBA switch is maintained because fabric B has no mapped path. Which acceptance criterion would best demonstrate a durable and safe resolution? Select ONE best answer.

  1. Firmware reports the expected usable capacity and approved speed, with balanced populated channels and no training errors.
  2. The correct mounted filesystem reflects the new usable capacity without data loss and application writes succeed.
  3. The host sees the intended LUN with active or standby paths on both fabrics and survives a single-fabric maintenance test.
  4. Devices remain within endurance, temperature and spare-capacity guidance and replacements occur before service-impacting failures.

Explanation

Correct Answer

C:

SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. This evidence tests whether the original Fibre Channel SAN zoning and multipath weakness has been corrected under realistic conditions.

Incorrect Answers

A:

This statement concerns CPU memory compatibility and population, a different Server+ technical control. It does not directly address the reported Fibre Channel SAN zoning and multipath fault or prove its repair. For this incident, the relevant principle is: SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone.

B:

This statement concerns Filesystem growth after LUN expansion, a different Server+ technical control. It does not directly address the reported Fibre Channel SAN zoning and multipath fault or prove its repair. For this incident, the relevant principle is: SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. A targeted investigation checks: Check HBA WWPNs, zone membership, array masking, fabric logins and host multipath path states. The desired recovery condition is: The host sees the intended LUN with active or standby paths on both fabrics and survives a single-fabric maintenance test.

D:

This statement concerns NVMe endurance and capacity monitoring, a different Server+ technical control. It does not directly address the reported Fibre Channel SAN zoning and multipath fault or prove its repair. For this incident, the relevant principle is: SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. A targeted investigation checks: Check HBA WWPNs, zone membership, array masking, fabric logins and host multipath path states. The desired recovery condition is: The host sees the intended LUN with active or standby paths on both fabrics and survives a single-fabric maintenance test.

Question 80

A change board is planning a verified response to this server event: A database host can discover a LUN over fabric A but loses storage access whenever one HBA switch is maintained because fabric B has no mapped path. For the Fibre Channel SAN zoning and multipath issue, which response elements belong in the approved plan? Select TWO answers.

  1. Check HBA WWPNs, zone membership, array masking, fabric logins and host multipath path states.
  2. Devices remain within endurance, temperature and spare-capacity guidance and replacements occur before service-impacting failures.
  3. Configure consistent WWPN zoning and LUN masking on independent fabrics, then enable supported host multipath policies.
  4. Use dedicated or appropriately isolated iSCSI paths with supported MPIO, correct initiator/target configuration and measured QoS.
  5. Expose every LUN to every host and assume extra FC cables automatically create safe paths.

Explanation

Correct Answer

A:

These observations investigate the exact Fibre Channel SAN zoning and multipath failure rather than unrelated components. The expected technical relationship is: SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone.

C:

SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. This is the appropriate targeted correction for Fibre Channel SAN zoning and multipath.

Incorrect Answers

B:

For this incident, the relevant principle is: SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. This statement concerns NVMe endurance and capacity monitoring, a different Server+ technical control.

D:

For this incident, the relevant principle is: SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. It does not directly address the reported Fibre Channel SAN zoning and multipath fault or prove its repair.

E:

SAN high availability requires correctly presented LUNs over multiple independent usable fabric paths, not redundant cables alone. Discriminate using: Check HBA WWPNs, zone membership, array masking, fabric logins and host multipath path states.