cert
cert-1
cert-2

Pass CompTIA PK0-005 Exam in First Attempt Guaranteed!

Get 100% Latest Exam Questions, Accurate & Verified Answers to Pass the Actual Exam!
30 Days Free Updates, Instant Download!

cert-5
cert-6
PK0-005 Exam - Verified By Experts
PK0-005 Premium Bundle
$29.98

PK0-005 Premium Bundle

$79.99
$109.97
  • Premium File 628 Questions & Answers. Last update: Nov 02, 2026
  • Training Course 159 Video Lectures
  • Study Guide 682 Pages
 
$109.97
$79.99
accept 46 downloads in last 7 days
block-screenshots
Purchase CompTIA PK0-005 Exam Training Products Individually
CompTIA PK0-005 Premium File
Premium File 628 Q&A
$76.99$69.99
CompTIA PK0-005 Video Training Course
Training Course 159 Lectures
$21.99 $19.99
CompTIA PK0-005 PDF Study Guide
Study Guide 682 Pages
$21.99 $19.99
CompTIA PK0-005 Practice Test 31

Question 300

A government system acceptance review discovers several regulatory requirements with no corresponding test case. Which project-management response BEST addresses the stated need?

  1. Use a requirements traceability matrix to link each accepted requirement to design, tests, defects and final acceptance evidence.
  2. Use a burndown or burnup chart and past delivery velocity to forecast remaining work while accounting for changing scope.
  3. Record each change request, disposition, approval, and deployed version so stakeholders can reconstruct authorized project evolution.
  4. Use a fishbone diagram to organize possible causes by categories and guide evidence collection before selecting a corrective action.

Explanation

Correct Answer

A:

Use a requirements traceability matrix to link each accepted requirement to design, tests, defects and final acceptance evidence. This targets the specific project decision. Traceability proves which requirements were implemented and tested; a count of passing tests without requirement mapping may hide omissions. Before committing, assess: Inspect requirement identifiers, acceptance criteria, mapped test cases, gaps, and release evidence. Situation: A government system acceptance review discovers several regulatory requirements with no corresponding test case.

Incorrect Answers

B:

Use a burndown or burnup chart and past delivery velocity to forecast remaining work while accounting for changing scope. That response is associated with Agile burnup burndown and velocity interpretation and does not directly settle this case. Its relevant principle is: Burndown tracks work remaining and burnup tracks delivered work versus total scope; velocity describes prior throughput, not a guaranteed future commitment. The stated case instead calls for: Use a requirements traceability matrix to link each accepted requirement to design, tests, defects and final acceptance evidence. Situation: A government system acceptance review discovers several regulatory requirements with no corresponding test case.

C:

Record each change request, disposition, approval, and deployed version so stakeholders can reconstruct authorized project evolution. That response is associated with Change log and version control record and does not directly settle this case. Its relevant principle is: Change logs track project decisions while version control tracks exact file revisions; both support auditability but are not interchangeable. The stated case instead calls for: Use a requirements traceability matrix to link each accepted requirement to design, tests, defects and final acceptance evidence. Situation: A government system acceptance review discovers several regulatory requirements with no corresponding test case.

D:

Use a fishbone diagram to organize possible causes by categories and guide evidence collection before selecting a corrective action. That response is associated with Fishbone root-cause diagram and does not directly settle this case. Its relevant principle is: Fishbone diagrams brainstorm and structure potential causes but do not prove the root cause without testing. The stated case instead calls for: Use a requirements traceability matrix to link each accepted requirement to design, tests, defects and final acceptance evidence. Situation: A government system acceptance review discovers several regulatory requirements with no corresponding test case.

Question 301

A cloud migration plan consists of one task called Move Everything with no separate network, data and validation work. Before acting, which evidence should the project team examine FIRST to assess the stated need?

  1. Inspect equipment purchases, cloud subscriptions, staffing and support charges, accounting policy, and time horizon.
  2. Inspect signed scope, deliverable hierarchy, package completion criteria, missing work, and overlapping assignments.
  3. Inspect estimated task duration, external deliverables, technical sequence, resource availability, and milestone acceptance criteria.
  4. Inspect completed work, unresolved blockers, budget commitments, forecast assumptions, and change approvals.

Explanation

Correct Answer

B:

Inspect signed scope, deliverable hierarchy, package completion criteria, missing work, and overlapping assignments. This checks the relevant condition before the team intervenes. A work breakdown structure decomposes project deliverables into work, not simply a calendar of meetings or an unprioritized wish list. The controlled response is: Decompose approved deliverables into manageable work packages with clear boundaries, estimates and responsible owners. Situation: A cloud migration plan consists of one task called Move Everything with no separate network, data and validation work.

Incorrect Answers

A:

Inspect equipment purchases, cloud subscriptions, staffing and support charges, accounting policy, and time horizon. That evidence would investigate Capital expenditure versus operating expenditure, not the main uncertainty in this situation. To decide the current case, examine: Inspect signed scope, deliverable hierarchy, package completion criteria, missing work, and overlapping assignments. Situation: A cloud migration plan consists of one task called Move Everything with no separate network, data and validation work.

C:

Inspect estimated task duration, external deliverables, technical sequence, resource availability, and milestone acceptance criteria. That evidence would investigate Planning milestones and predecessor sequencing, not the main uncertainty in this situation. To decide the current case, examine: Inspect signed scope, deliverable hierarchy, package completion criteria, missing work, and overlapping assignments. Situation: A cloud migration plan consists of one task called Move Everything with no separate network, data and validation work.

D:

Inspect completed work, unresolved blockers, budget commitments, forecast assumptions, and change approvals. That evidence would investigate Progress reporting and budget forecast updates, not the main uncertainty in this situation. To decide the current case, examine: Inspect signed scope, deliverable hierarchy, package completion criteria, missing work, and overlapping assignments. Situation: A cloud migration plan consists of one task called Move Everything with no separate network, data and validation work.

Question 302

A project ends with final signoff but no searchable record of major changes, risks, or post-launch ownership. Which result BEST demonstrates that the project-management response met the stated need?

  1. Testing identifies nonconforming outputs before signoff and required evidence is preserved against the agreed quality gates.
  2. Suppliers and contractors are offboarded, financial commitments reconcile, and ongoing support terms remain accessible to operations.
  3. Future project teams can retrieve approved final records and reuse lessons without losing sensitive audit evidence.
  4. Parties approve a workable resolution with recorded commitments rather than continuing a personal or undocumented dispute.

Explanation

Correct Answer

C:

Future project teams can retrieve approved final records and reuse lessons without losing sensitive audit evidence. This is an observable measure of the intended outcome, not just evidence that a meeting or configuration occurred. Lessons learned improve later work when they are captured and made discoverable; archiving supports retention and traceability after closure. Situation: A project ends with final signoff but no searchable record of major changes, risks, or post-launch ownership.

Incorrect Answers

A:

Testing identifies nonconforming outputs before signoff and required evidence is preserved against the agreed quality gates. That outcome tests Quality assurance plan and test entry criteria; it is not proof of this particular requirement. The more specific validation is: Future project teams can retrieve approved final records and reuse lessons without losing sensitive audit evidence. Situation: A project ends with final signoff but no searchable record of major changes, risks, or post-launch ownership.

B:

Suppliers and contractors are offboarded, financial commitments reconcile, and ongoing support terms remain accessible to operations. That outcome tests Vendor contract closeout and resource release; it is not proof of this particular requirement. The more specific validation is: Future project teams can retrieve approved final records and reuse lessons without losing sensitive audit evidence. Situation: A project ends with final signoff but no searchable record of major changes, risks, or post-launch ownership.

D:

Parties approve a workable resolution with recorded commitments rather than continuing a personal or undocumented dispute. That outcome tests Collaborative conflict resolution; it is not proof of this particular requirement. The more specific validation is: Future project teams can retrieve approved final records and reuse lessons without losing sensitive audit evidence. Situation: A project ends with final signoff but no searchable record of major changes, risks, or post-launch ownership.

Question 303

An integration test reports frequent malformed files and the group needs to map possible process and system contributors. Before acting, which evidence should the project team examine FIRST to assess the stated need?

  1. Inspect completed work, remaining backlog, added scope, sprint boundaries, and historical throughput.
  2. Inspect ticket categories, assignment queues, severity rules, due dates, and linked project issues.
  3. Inspect observed problem, potential people/process/equipment/environment drivers, supporting data, and untested assumptions.
  4. Inspect security policy, offline access needs, vendor support, backup responsibilities, subscription terms, and integration constraints.

Explanation

Correct Answer

C:

Inspect observed problem, potential people/process/equipment/environment drivers, supporting data, and untested assumptions. This checks the relevant condition before the team intervenes. Fishbone diagrams brainstorm and structure potential causes but do not prove the root cause without testing. The controlled response is: Use a fishbone diagram to organize possible causes by categories and guide evidence collection before selecting a corrective action. Situation: An integration test reports frequent malformed files and the group needs to map possible process and system contributors.

Incorrect Answers

A:

Inspect completed work, remaining backlog, added scope, sprint boundaries, and historical throughput. That evidence would investigate Agile burnup burndown and velocity interpretation, not the main uncertainty in this situation. To decide the current case, examine: Inspect observed problem, potential people/process/equipment/environment drivers, supporting data, and untested assumptions. Situation: An integration test reports frequent malformed files and the group needs to map possible process and system contributors.

B:

Inspect ticket categories, assignment queues, severity rules, due dates, and linked project issues. That evidence would investigate Ticketing and case management workflow, not the main uncertainty in this situation. To decide the current case, examine: Inspect observed problem, potential people/process/equipment/environment drivers, supporting data, and untested assumptions. Situation: An integration test reports frequent malformed files and the group needs to map possible process and system contributors.

D:

Inspect security policy, offline access needs, vendor support, backup responsibilities, subscription terms, and integration constraints. That evidence would investigate Cloud versus on-premise project management tools, not the main uncertainty in this situation. To decide the current case, examine: Inspect observed problem, potential people/process/equipment/environment drivers, supporting data, and untested assumptions. Situation: An integration test reports frequent malformed files and the group needs to map possible process and system contributors.

Question 304

A contractor photographs confidential racks during a site visit without receiving visitor authorization. Which TWO complementary steps provide the best response AND its necessary supporting assessment? Select TWO.

  1. Protect project locations and removable storage with approved access, custody, disposal and visitor controls.
  2. The production deployment matches a reviewed tested build, and staging failures block promotion with an auditable record.
  3. Inspect badge permissions, visitor logs, device inventory, removable media rules, and secure storage practices.
  4. Inspect data subjects' locations, hosting regions, contractual transfers, retention policies, and applicable regulatory requirements.
  5. Apply corporate mobile-device, remote-access and endpoint policies to project staff before permitting access to production services.

Explanation

Correct Answers

A:

Protect project locations and removable storage with approved access, custody, disposal and visitor controls. This targets the specific project decision. Physical security remains necessary even for cloud projects; an unlocked device or uncontrolled removable drive can bypass digital safeguards. Before committing, assess: Inspect badge permissions, visitor logs, device inventory, removable media rules, and secure storage practices. It complements the associated assessment evidence. Situation: A contractor photographs confidential racks during a site visit without receiving visitor authorization.

C:

Inspect badge permissions, visitor logs, device inventory, removable media rules, and secure storage practices. This checks the relevant condition before the team intervenes. Physical security remains necessary even for cloud projects; an unlocked device or uncontrolled removable drive can bypass digital safeguards. The controlled response is: Protect project locations and removable storage with approved access, custody, disposal and visitor controls. It complements the associated implementation step. Situation: A contractor photographs confidential racks during a site visit without receiving visitor authorization.

Incorrect Answers

B:

The production deployment matches a reviewed tested build, and staging failures block promotion with an auditable record. This is useful for CI CD staging and production release governance but is not one of the complementary steps for this case. The appropriate paired decision combines: Protect project locations and removable storage with approved access, custody, disposal and visitor controls. and Inspect badge permissions, visitor logs, device inventory, removable media rules, and secure storage practices. Situation: A contractor photographs confidential racks during a site visit without receiving visitor authorization.

D:

Inspect data subjects' locations, hosting regions, contractual transfers, retention policies, and applicable regulatory requirements. This is useful for Geographic privacy jurisdiction and data residency but is not one of the complementary steps for this case. The appropriate paired decision combines: Protect project locations and removable storage with approved access, custody, disposal and visitor controls. and Inspect badge permissions, visitor logs, device inventory, removable media rules, and secure storage practices. Situation: A contractor photographs confidential racks during a site visit without receiving visitor authorization.

E:

Apply corporate mobile-device, remote-access and endpoint policies to project staff before permitting access to production services. This is useful for Remote endpoint and operational security but is not one of the complementary steps for this case. The appropriate paired decision combines: Protect project locations and removable storage with approved access, custody, disposal and visitor controls. and Inspect badge permissions, visitor logs, device inventory, removable media rules, and secure storage practices. Situation: A contractor photographs confidential racks during a site visit without receiving visitor authorization.

Question 305

A payroll migration team copies employee identifiers into an open spreadsheet while debugging test failures. Which project-management response BEST addresses the stated need?

  1. Apply appropriate multifactor authentication and task-scoped permissions to project systems that contain sensitive data.
  2. Identify personal and health information in project datasets, minimize unnecessary exposure and map handling to applicable policies.
  3. Review country and regional privacy requirements before moving, processing or disclosing personal data across borders.
  4. Follow authorized operational change control for infrastructure updates with customer notice, scheduled downtime and a tested rollback plan.

Explanation

Correct Answer

B:

Identify personal and health information in project datasets, minimize unnecessary exposure and map handling to applicable policies. This targets the specific project decision. PII can identify people, and PHI adds health-related sensitivity under applicable rules; naming data as test information does not automatically make it safe. Before committing, assess: Inspect data inventory, PII or PHI fields, purpose of processing, authorized recipients, and protection requirements. Situation: A payroll migration team copies employee identifiers into an open spreadsheet while debugging test failures.

Incorrect Answers

A:

Apply appropriate multifactor authentication and task-scoped permissions to project systems that contain sensitive data. That response is associated with Multifactor authentication and least privilege and does not directly settle this case. Its relevant principle is: MFA reduces reliance on a password alone; least privilege separately limits what a successfully authenticated identity may do. The stated case instead calls for: Identify personal and health information in project datasets, minimize unnecessary exposure and map handling to applicable policies. Situation: A payroll migration team copies employee identifiers into an open spreadsheet while debugging test failures.

C:

Review country and regional privacy requirements before moving, processing or disclosing personal data across borders. That response is associated with Geographic privacy jurisdiction and data residency and does not directly settle this case. Its relevant principle is: Privacy and residency obligations can vary by jurisdiction; technical cloud-region availability does not establish legal permission to transfer data. The stated case instead calls for: Identify personal and health information in project datasets, minimize unnecessary exposure and map handling to applicable policies. Situation: A payroll migration team copies employee identifiers into an open spreadsheet while debugging test failures.

D:

Follow authorized operational change control for infrastructure updates with customer notice, scheduled downtime and a tested rollback plan. That response is associated with Infrastructure maintenance window and rollback and does not directly settle this case. Its relevant principle is: Infrastructure change control manages service interruption and reversibility, not just implementation of a technically valid command. The stated case instead calls for: Identify personal and health information in project datasets, minimize unnecessary exposure and map handling to applicable policies. Situation: A payroll migration team copies employee identifiers into an open spreadsheet while debugging test failures.

Question 306

A developer pushes code directly to production after a successful local test without a staging deployment. Before acting, which evidence should the project team examine FIRST to assess the stated need?

  1. Inspect source review, build results, test automation, environment configuration, release approval, and rollback package.
  2. Inspect device compliance, secure remote access, staff screening requirements, endpoint protection and contractor termination rules.
  3. Inspect data subjects' locations, hosting regions, contractual transfers, retention policies, and applicable regulatory requirements.
  4. Inspect maintenance approval, affected services, backup or restore readiness, customer communication, and validation checks.

Explanation

Correct Answer

A:

Inspect source review, build results, test automation, environment configuration, release approval, and rollback package. This checks the relevant condition before the team intervenes. Continuous integration and delivery automate builds and tests; production authorization and environment separation still require defined governance. The controlled response is: Promote tested software through controlled source integration, staging checks and approved production release rather than bypassing deployment gates. Situation: A developer pushes code directly to production after a successful local test without a staging deployment.

Incorrect Answers

B:

Inspect device compliance, secure remote access, staff screening requirements, endpoint protection and contractor termination rules. That evidence would investigate Remote endpoint and operational security, not the main uncertainty in this situation. To decide the current case, examine: Inspect source review, build results, test automation, environment configuration, release approval, and rollback package. Situation: A developer pushes code directly to production after a successful local test without a staging deployment.

C:

Inspect data subjects' locations, hosting regions, contractual transfers, retention policies, and applicable regulatory requirements. That evidence would investigate Geographic privacy jurisdiction and data residency, not the main uncertainty in this situation. To decide the current case, examine: Inspect source review, build results, test automation, environment configuration, release approval, and rollback package. Situation: A developer pushes code directly to production after a successful local test without a staging deployment.

D:

Inspect maintenance approval, affected services, backup or restore readiness, customer communication, and validation checks. That evidence would investigate Infrastructure maintenance window and rollback, not the main uncertainty in this situation. To decide the current case, examine: Inspect source review, build results, test automation, environment configuration, release approval, and rollback package. Situation: A developer pushes code directly to production after a successful local test without a staging deployment.

Question 307

A startup cannot predict which subscription features customers will value until they test an early release. Which result BEST demonstrates that the project-management response met the stated need?

  1. A deliberately vulnerable dependency stops the release before production and its remediation is traceable to a team owner.
  2. Each approved phase produces accepted documents or deliverables before the dependent phase begins, and deviations follow control.
  3. The new capability is formally accepted and transferred to a continuing operations team instead of keeping a perpetual project open.
  4. High-priority user feedback changes upcoming backlog order without silently changing completed accepted scope or bypassing quality gates.

Explanation

Correct Answer

D:

High-priority user feedback changes upcoming backlog order without silently changing completed accepted scope or bypassing quality gates. This is an observable measure of the intended outcome, not just evidence that a meeting or configuration occurred. Iterative Agile delivery relies on frequent feedback and a prioritized product backlog; product ownership is different from project administrative scheduling. Situation: A startup cannot predict which subscription features customers will value until they test an early release.

Incorrect Answers

A:

A deliberately vulnerable dependency stops the release before production and its remediation is traceable to a team owner. That outcome tests DevSecOps security in delivery; it is not proof of this particular requirement. The more specific validation is: High-priority user feedback changes upcoming backlog order without silently changing completed accepted scope or bypassing quality gates. Situation: A startup cannot predict which subscription features customers will value until they test an early release.

B:

Each approved phase produces accepted documents or deliverables before the dependent phase begins, and deviations follow control. That outcome tests Waterfall for fixed regulatory requirements; it is not proof of this particular requirement. The more specific validation is: High-priority user feedback changes upcoming backlog order without silently changing completed accepted scope or bypassing quality gates. Situation: A startup cannot predict which subscription features customers will value until they test an early release.

C:

The new capability is formally accepted and transferred to a continuing operations team instead of keeping a perpetual project open. That outcome tests Project versus ongoing operations; it is not proof of this particular requirement. The more specific validation is: High-priority user feedback changes upcoming backlog order without silently changing completed accepted scope or bypassing quality gates. Situation: A startup cannot predict which subscription features customers will value until they test an early release.

Question 308

A software pilot uses manual exports to continue testing while a broken connector is being repaired. Which result BEST demonstrates that the project-management response met the stated need?

  1. The workaround restores essential activity, the underlying cause is addressed, and closure evidence shows recurrence is controlled.
  2. Only approved extensions appear in the work plan, while rejected or deferred requests remain visible but uncommitted.
  3. The decision authority receives documented alternatives and impacts, and the request is not implemented while undecided.
  4. The live problem has an accountable resolver and timely status communications until resolution and closure evidence are recorded.

Explanation

Correct Answer

A:

The workaround restores essential activity, the underlying cause is addressed, and closure evidence shows recurrence is controlled. This is an observable measure of the intended outcome, not just evidence that a meeting or configuration occurred. A workaround limits immediate disruption but is not necessarily a root-cause fix; recurring issues require causal investigation. Situation: A software pilot uses manual exports to continue testing while a broken connector is being repaired.

Incorrect Answers

B:

Only approved extensions appear in the work plan, while rejected or deferred requests remain visible but uncommitted. That outcome tests Scope creep and baseline integrity; it is not proof of this particular requirement. The more specific validation is: The workaround restores essential activity, the underlying cause is addressed, and closure evidence shows recurrence is controlled. Situation: A software pilot uses manual exports to continue testing while a broken connector is being repaired.

C:

The decision authority receives documented alternatives and impacts, and the request is not implemented while undecided. That outcome tests Change request impact assessment; it is not proof of this particular requirement. The more specific validation is: The workaround restores essential activity, the underlying cause is addressed, and closure evidence shows recurrence is controlled. Situation: A software pilot uses manual exports to continue testing while a broken connector is being repaired.

D:

The live problem has an accountable resolver and timely status communications until resolution and closure evidence are recorded. That outcome tests Issue severity triage and escalation; it is not proof of this particular requirement. The more specific validation is: The workaround restores essential activity, the underlying cause is addressed, and closure evidence shows recurrence is controlled. Situation: A software pilot uses manual exports to continue testing while a broken connector is being repaired.

Question 309

A hospital implementation has parallel training and interface work, but only the integration chain controls launch date. Which TWO complementary steps provide the best response AND its necessary supporting assessment? Select TWO.

  1. The opportunity has a deliberate owner and a documented response that increases or secures benefit without mislabeling it as a threat.
  2. Use approved contingency buffer for anticipated uncertainty and rebaseline only after an authorized material change rather than hiding every schedule slip.
  3. Inspect task durations, predecessor links, float values, milestone dates, and resource assumptions for the project network.
  4. Inspect arrival variability, average cycle time, work queues, current WIP, and whether demand can be forecast into stable sprint goals.
  5. Map task precedence and identify the longest dependency path to forecast the earliest achievable finish before compressing work.

Explanation

Correct Answers

C:

Inspect task durations, predecessor links, float values, milestone dates, and resource assumptions for the project network. This checks the relevant condition before the team intervenes. The critical path is the longest duration path through dependent tasks; delaying a critical task can delay completion even if other tasks have slack. The controlled response is: Map task precedence and identify the longest dependency path to forecast the earliest achievable finish before compressing work. It complements the associated implementation step. Situation: A hospital implementation has parallel training and interface work, but only the integration chain controls launch date.

E:

Map task precedence and identify the longest dependency path to forecast the earliest achievable finish before compressing work. This targets the specific project decision. The critical path is the longest duration path through dependent tasks; delaying a critical task can delay completion even if other tasks have slack. Before committing, assess: Inspect task durations, predecessor links, float values, milestone dates, and resource assumptions for the project network. It complements the associated assessment evidence. Situation: A hospital implementation has parallel training and interface work, but only the integration chain controls launch date.

Incorrect Answers

A:

The opportunity has a deliberate owner and a documented response that increases or secures benefit without mislabeling it as a threat. This is useful for Positive risk opportunity strategies but is not one of the complementary steps for this case. The appropriate paired decision combines: Map task precedence and identify the longest dependency path to forecast the earliest achievable finish before compressing work. and Inspect task durations, predecessor links, float values, milestone dates, and resource assumptions for the project network. Situation: A hospital implementation has parallel training and interface work, but only the integration chain controls launch date.

B:

Use approved contingency buffer for anticipated uncertainty and rebaseline only after an authorized material change rather than hiding every schedule slip. This is useful for Schedule buffer and controlled rebaseline but is not one of the complementary steps for this case. The appropriate paired decision combines: Map task precedence and identify the longest dependency path to forecast the earliest achievable finish before compressing work. and Inspect task durations, predecessor links, float values, milestone dates, and resource assumptions for the project network. Situation: A hospital implementation has parallel training and interface work, but only the integration chain controls launch date.

D:

Inspect arrival variability, average cycle time, work queues, current WIP, and whether demand can be forecast into stable sprint goals. This is useful for Kanban flow versus sprint commitments but is not one of the complementary steps for this case. The appropriate paired decision combines: Map task precedence and identify the longest dependency path to forecast the earliest achievable finish before compressing work. and Inspect task durations, predecessor links, float values, milestone dates, and resource assumptions for the project network. Situation: A hospital implementation has parallel training and interface work, but only the integration chain controls launch date.

Question 310

A development team uses story points as an employee timesheet and creates misleading commitments. Before acting, which evidence should the project team examine FIRST to assess the stated need?

  1. Inspect backlog ownership, sprint goals, stakeholder feedback cadence, definition of done, and ability to reorder work.
  2. Inspect task durations, predecessor links, float values, milestone dates, and resource assumptions for the project network.
  3. Review requirements, test cases, defect results, acceptance criteria, user scenarios, and signoff ownership.
  4. Inspect current priorities, acceptance criteria, team velocity, dependencies, and historical size of completed work.

Explanation

Correct Answer

D:

Inspect current priorities, acceptance criteria, team velocity, dependencies, and historical size of completed work. This checks the relevant condition before the team intervenes. Story points reflect relative complexity or effort rather than guaranteed hours, and an epic is too broad to treat as one small task. The controlled response is: Break an epic into well-scoped backlog items, estimate relative effort with the team, and select a realistic sprint goal using proven capacity. Situation: A development team uses story points as an employee timesheet and creates misleading commitments.

Incorrect Answers

A:

Inspect backlog ownership, sprint goals, stakeholder feedback cadence, definition of done, and ability to reorder work. That evidence would investigate Agile feedback and product ownership, not the main uncertainty in this situation. To decide the current case, examine: Inspect current priorities, acceptance criteria, team velocity, dependencies, and historical size of completed work. Situation: A development team uses story points as an employee timesheet and creates misleading commitments.

B:

Inspect task durations, predecessor links, float values, milestone dates, and resource assumptions for the project network. That evidence would investigate Critical path and hard dependencies, not the main uncertainty in this situation. To decide the current case, examine: Inspect current priorities, acceptance criteria, team velocity, dependencies, and historical size of completed work. Situation: A development team uses story points as an employee timesheet and creates misleading commitments.

C:

Review requirements, test cases, defect results, acceptance criteria, user scenarios, and signoff ownership. That evidence would investigate Verification versus validation and UAT, not the main uncertainty in this situation. To decide the current case, examine: Inspect current priorities, acceptance criteria, team velocity, dependencies, and historical size of completed work. Situation: A development team uses story points as an employee timesheet and creates misleading commitments.