cert
cert-1
cert-2

Pass CompTIA N10-009 Exam in First Attempt Guaranteed!

Get 100% Latest Exam Questions, Accurate & Verified Answers to Pass the Actual Exam!
30 Days Free Updates, Instant Download!

cert-5
cert-6
N10-009 Exam - Verified By Experts
N10-009 Premium Bundle
$29.98

N10-009 Premium Bundle

$79.99
$109.97
  • Premium File 768 Questions & Answers. Last update: Nov 13, 2026
  • Training Course 240 Video Lectures
  • Study Guide 128 Pages
 
$109.97
$79.99
accept 176 downloads in last 7 days
block-screenshots
Purchase CompTIA N10-009 Exam Training Products Individually
CompTIA N10-009 Premium File
Premium File 768 Q&A
$76.99$69.99
CompTIA N10-009 Video Training Course
Training Course 240 Lectures
$21.99 $19.99
CompTIA N10-009 PDF Study Guide
Study Guide 128 Pages
$21.99 $19.99
CompTIA N10-009 Practice Test 11

Question 100

A server and switch share a rack and need a supported 25-gigabit copper interconnect only two meters long. Which THREE entries correctly identify the applicable control, its technical principle, and a direct validation observation? (Select THREE.)

  1. Choose single-mode fiber and compatible long-distance transceivers within optical budget.
  2. Use an RJ11 telephone patch cord as a 25G Ethernet uplink.
  3. Short twinax DAC links can avoid optical modules for supported short distances.
  4. Replace DAC with distance-appropriate fiber transceivers and tested fiber plant.
  5. Use a vendor-supported 25G SFP28 direct attach cable meeting host port specifications.
  6. The negotiated rate and error counters match the supported DAC link characteristics.

Explanation

Correct Answers

C:

Correct principle. Short twinax DAC links can avoid optical modules for supported short distances. This is the justification for the selected network control: Use a vendor-supported 25G SFP28 direct attach cable meeting host port specifications.

E:

Correct control. Short twinax DAC links can avoid optical modules for supported short distances. It is the recommended implementation for this case.

F:

Correct validation. The negotiated rate and error counters match the supported DAC link characteristics. This is the directly measurable result of the control.

Incorrect Answers

A:

This is another scenario's control in the same domain: A carrier link crosses several kilometers between buildings, beyond the usual reach of multimode optics. It is not the best action for this case.

B:

This control is invalid here. RJ11 wiring and interface specifications do not support a 25G server uplink. It does not meet the specified requirement.

D:

This belongs to the changed condition, not the current three-part answer: The server moves to a different building hundreds of meters away. DAC range is too short for inter-building connectivity.

Question 101

A 100-gigabit backbone upgrade requires the correct optical module form factor for high-density aggregation ports. Which action MOST directly meets the stated networking requirement?

  1. Insert an arbitrary low-speed SFP module without checking aggregation port support.
  2. Choose compatible 10G short-range optical transceivers and multimode cabling.
  3. Use compatible QSFP-class modules and verify lane count, reach and connector type.
  4. Use supported MPO/MTP-style multifiber connections where optics specify them.

Explanation

Correct Answer

C:

QSFP families commonly support high-speed multi-lane uplinks when ports and optics match. This specifically resolves: A 100-gigabit backbone upgrade requires the correct optical module form factor for high-density aggregation ports.

Incorrect Answers

A:

Port form factor and electrical compatibility cannot be assumed interchangeable. The suggested approach is: Insert an arbitrary low-speed SFP module without checking aggregation port support.

B:

This addresses another problem in objective 1.5: An access switch needs a 10-gigabit uplink over a short multimode fiber run inside a building.

D:

This action responds to a later condition: The deployment adds many-fiber trunks into a patch cabinet. Multifiber optics require matching lane-to-fiber connector topology.

Question 102

A 100-gigabit backbone upgrade requires the correct optical module form factor for high-density aggregation ports. A colleague instead suggests: Insert an arbitrary low-speed SFP module without checking aggregation port support. Which finding MOST specifically explains why that suggestion is unsuitable?

  1. Port form factor and electrical compatibility cannot be assumed interchangeable.
  2. Incompatible modules or wavelengths may prevent the optical link from forming.
  3. Multifiber optics require matching lane-to-fiber connector topology.
  4. QSFP families commonly support high-speed multi-lane uplinks when ports and optics match.

Explanation

Correct Answer

A:

Port form factor and electrical compatibility cannot be assumed interchangeable. This flaw directly concerns the proposed action: Insert an arbitrary low-speed SFP module without checking aggregation port support.

Incorrect Answers

B:

This flaw concerns a different case in objective 1.5: An access switch needs a 10-gigabit uplink over a short multimode fiber run inside a building. The current rejected proposal is: Insert an arbitrary low-speed SFP module without checking aggregation port support.

C:

This rationale belongs to a later changed condition: The deployment adds many-fiber trunks into a patch cabinet.

D:

This explains why the recommended control works: Use compatible QSFP-class modules and verify lane count, reach and connector type.

Question 103

A 100-gigabit backbone upgrade requires the correct optical module form factor for high-density aggregation ports. After applying the solution 'Use compatible QSFP-class modules and verify lane count, reach and connector type.', which observation MOST directly proves that the requirement was met?

  1. Both ends establish the intended rate with acceptable optical levels and CRC counts.
  2. Approval is recorded for 'Use compatible QSFP-class modules and verify lane count, reach and connector type.' but no operational validation is performed.
  3. Inventory and interface diagnostics agree on module identity, speed and optical status.
  4. Installation inspection confirms required markings and compliant cable routing.

Explanation

Correct Answer

C:

Inventory and interface diagnostics agree on module identity, speed and optical status. It tests the intended outcome because qsfp families commonly support high-speed multi-lane uplinks when ports and optics match.

Incorrect Answers

A:

This observation is for a different condition: An access switch needs a 10-gigabit uplink over a short multimode fiber run inside a building. It does not directly test the target outcome: A 100-gigabit backbone upgrade requires the correct optical module form factor for high-density aggregation ports.

B:

The missing direct test is: Inventory and interface diagnostics agree on module identity, speed and optical status.

D:

This test addresses a separate problem: New cabling must run through an air-handling ceiling subject to local fire codes.

Question 104

The original case was: A 100-gigabit backbone upgrade requires the correct optical module form factor for high-density aggregation ports. The requirement then changes: The deployment adds many-fiber trunks into a patch cabinet. Which revised action BEST meets this new condition?

  1. Use compatible QSFP-class modules and verify lane count, reach and connector type.
  2. Use supported MPO/MTP-style multifiber connections where optics specify them.
  3. Insert an arbitrary low-speed SFP module without checking aggregation port support.
  4. Inventory and interface diagnostics agree on module identity, speed and optical status.

Explanation

Correct Answer

B:

Multifiber optics require matching lane-to-fiber connector topology. The revised requirement is: The deployment adds many-fiber trunks into a patch cabinet. The appropriate action is: Use supported MPO/MTP-style multifiber connections where optics specify them.

Incorrect Answers

A:

This is the original control. QSFP families commonly support high-speed multi-lane uplinks when ports and optics match. It does not directly satisfy the revised requirement: The deployment adds many-fiber trunks into a patch cabinet.

C:

Port form factor and electrical compatibility cannot be assumed interchangeable. It remains inappropriate in the revised context.

D:

Inventory and interface diagnostics agree on module identity, speed and optical status. The current requirement is: The deployment adds many-fiber trunks into a patch cabinet.

Question 105

A datacenter needs predictable east-west server connectivity with multiple equal-cost paths between racks. Which action MOST directly meets the stated networking requirement?

  1. Use a hub-and-spoke WAN with resilient hub connectivity and controlled routes.
  2. Use a leaf-spine fabric with appropriate routing and equal-cost multipath.
  3. Consider a collapsed-core design where scale and resilience allow it.
  4. Use one chained daisy-link switch path for all east-west traffic.

Explanation

Correct Answer

B:

Leaf-spine reduces variable hop count between hosts and offers multiple fabric paths. This specifically resolves: A datacenter needs predictable east-west server connectivity with multiple equal-cost paths between racks.

Incorrect Answers

A:

This addresses another problem in objective 1.6: Six remote offices need connectivity to a central ERP application and central security inspection.

C:

This action responds to a later condition: The project changes to a small campus with limited distribution-switch budget. A small campus may consolidate core and distribution functions.

D:

A linear chain adds hops and single points of failure. The suggested approach is: Use one chained daisy-link switch path for all east-west traffic.

Question 106

A datacenter needs predictable east-west server connectivity with multiple equal-cost paths between racks. A colleague instead suggests: Use one chained daisy-link switch path for all east-west traffic. Which finding MOST specifically explains why that suggestion is unsuitable?

  1. Leaf-spine reduces variable hop count between hosts and offers multiple fabric paths.
  2. A small campus may consolidate core and distribution functions.
  3. A full mesh increases connections and operational complexity unnecessarily.
  4. A linear chain adds hops and single points of failure.

Explanation

Correct Answer

D:

A linear chain adds hops and single points of failure. This flaw directly concerns the proposed action: Use one chained daisy-link switch path for all east-west traffic.

Incorrect Answers

A:

This explains why the recommended control works: Use a leaf-spine fabric with appropriate routing and equal-cost multipath.

B:

This rationale belongs to a later changed condition: The project changes to a small campus with limited distribution-switch budget.

C:

This flaw concerns a different case in objective 1.6: Six remote offices need connectivity to a central ERP application and central security inspection. The current rejected proposal is: Use one chained daisy-link switch path for all east-west traffic.

Question 107

A datacenter needs predictable east-west server connectivity with multiple equal-cost paths between racks. After applying the solution 'Use a leaf-spine fabric with appropriate routing and equal-cost multipath.', which observation MOST directly proves that the requirement was met?

  1. Path testing shows ECMP distribution and consistent rack-to-rack reachability.
  2. Disruption tests confirm traffic reroutes through remaining mesh paths.
  3. Route verification shows each branch reaches central services and unnecessary branch paths are blocked.
  4. Approval is recorded for 'Use a leaf-spine fabric with appropriate routing and equal-cost multipath.' but no operational validation is performed.

Explanation

Correct Answer

A:

Path testing shows ECMP distribution and consistent rack-to-rack reachability. It tests the intended outcome because leaf-spine reduces variable hop count between hosts and offers multiple fabric paths.

Incorrect Answers

B:

This test addresses a separate problem: A research backbone must maintain peer reachability after losing any one of several inter-site links.

C:

This observation is for a different condition: Six remote offices need connectivity to a central ERP application and central security inspection. It does not directly test the target outcome: A datacenter needs predictable east-west server connectivity with multiple equal-cost paths between racks.

D:

The missing direct test is: Path testing shows ECMP distribution and consistent rack-to-rack reachability.

Question 108

The original case was: A datacenter needs predictable east-west server connectivity with multiple equal-cost paths between racks. The requirement then changes: The project changes to a small campus with limited distribution-switch budget. Which revised action BEST meets this new condition?

  1. Consider a collapsed-core design where scale and resilience allow it.
  2. Path testing shows ECMP distribution and consistent rack-to-rack reachability.
  3. Use one chained daisy-link switch path for all east-west traffic.
  4. Use a leaf-spine fabric with appropriate routing and equal-cost multipath.

Explanation

Correct Answer

A:

A small campus may consolidate core and distribution functions. The revised requirement is: The project changes to a small campus with limited distribution-switch budget. The appropriate action is: Consider a collapsed-core design where scale and resilience allow it.

Incorrect Answers

B:

Path testing shows ECMP distribution and consistent rack-to-rack reachability. The current requirement is: The project changes to a small campus with limited distribution-switch budget.

C:

A linear chain adds hops and single points of failure. It remains inappropriate in the revised context.

D:

This is the original control. Leaf-spine reduces variable hop count between hosts and offers multiple fabric paths. It does not directly satisfy the revised requirement: The project changes to a small campus with limited distribution-switch budget.

Question 109

A university wants separate access, distribution and core roles for a growing campus. Which action MOST directly meets the stated networking requirement?

  1. Give every access switch an independent internet route with no distribution structure.
  2. Implement a three-tier hierarchical design with redundant uplinks at each role.
  3. Use a scaled-down collapsed core with appropriately managed redundancy.
  4. Design redundant mesh paths with tested routing convergence.

Explanation

Correct Answer

B:

Layered roles help scale policy, aggregation and backbone transport. This specifically resolves: A university wants separate access, distribution and core roles for a growing campus.

Incorrect Answers

A:

Flat unmanaged design complicates segmentation and operational control. The suggested approach is: Give every access switch an independent internet route with no distribution structure.

C:

This action responds to a later condition: A small branch only needs two layers and a few switches. Simpler campus size can justify fewer hierarchical layers.

D:

This addresses another problem in objective 1.6: A research backbone must maintain peer reachability after losing any one of several inter-site links.

Question 110

A university wants separate access, distribution and core roles for a growing campus. A colleague instead suggests: Give every access switch an independent internet route with no distribution structure. Which finding MOST specifically explains why that suggestion is unsuitable?

  1. Simpler campus size can justify fewer hierarchical layers.
  2. Layered roles help scale policy, aggregation and backbone transport.
  3. Flat unmanaged design complicates segmentation and operational control.
  4. A single hub or circuit becomes a common point of failure.

Explanation

Correct Answer

C:

Flat unmanaged design complicates segmentation and operational control. This flaw directly concerns the proposed action: Give every access switch an independent internet route with no distribution structure.

Incorrect Answers

A:

This rationale belongs to a later changed condition: A small branch only needs two layers and a few switches.

B:

This explains why the recommended control works: Implement a three-tier hierarchical design with redundant uplinks at each role.

D:

This flaw concerns a different case in objective 1.6: A research backbone must maintain peer reachability after losing any one of several inter-site links. The current rejected proposal is: Give every access switch an independent internet route with no distribution structure.

CompTIA Network+ (N10-009) Practice Tests