One router changes its ISO area identifier during site renumbering and its former Level-1 neighbors no longer share area membership, but Level-2 connectivity remains. Which measurable result would verify success without relying on assumptions?
- The Level-2 connection forms and authorized remote-area prefixes become reachable through the backbone.
- The intended new area peers form Level-1 relationships and Level-2 backbone transit remains stable.
- The unwanted aggregate remains blocked while all approved regional routes return.
- Only intended destinations are routed to the area and unused prefixes are not misrepresented.
Explanation
Correct Answer
B:The acceptance measurement for this case is: The intended new area peers form Level-1 relationships and Level-2 backbone transit remains stable. It establishes that the intended remediation (“Reconcile the NET area plan and preserve a deliberate Level-2 backbone relationship across areas”) was effective and can be corroborated by: Compare area addresses in NET values with the approved migration inventory.
Incorrect Answers
A:The actual case evidence is: One router changes its ISO area identifier during site renumbering and its former Level-1 neighbors no longer share area membership, but Level-2 connectivity remains. The proposed option addresses a different condition: A service core spans two different Level-1 areas, yet two aggregation routers were configured to exchange only Level-1 IS-IS information across their inter-area link. Confirm the distinction by checking: Inspect both Level-1 and Level-2 adjacency counts before and after renumbering. The response supported by the evidence is: The intended new area peers form Level-1 relationships and Level-2 backbone transit remains stable.
C:This choice does not address the stated situation: One router changes its ISO area identifier during site renumbering and its former Level-1 neighbors no longer share area membership, but Level-2 connectivity remains. Its competing context is: A provider core policy update filters every Level-2 prefix from one neighboring area to stop one unwanted aggregate, unexpectedly removing healthy routes. The relevant diagnostic is: Inspect both Level-1 and Level-2 adjacency counts before and after renumbering. The case-supported response is: The intended new area peers form Level-1 relationships and Level-2 backbone transit remains stable.
D:The alternative applies to another situation: A Level-1/Level-2 border advertises a broad IP summary from one area that includes addresses not actually deployed there, attracting invalid traffic. The reported case instead states: One router changes its ISO area identifier during site renumbering and its former Level-1 neighbors no longer share area membership, but Level-2 connectivity remains. The distinguishing check is: Inspect both Level-1 and Level-2 adjacency counts before and after renumbering. The supported action or criterion is: The intended new area peers form Level-1 relationships and Level-2 backbone transit remains stable.
Question 171
An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. Which change most directly addresses the observed problem?
- Repair the authorized interlevel route advertisement policy on the correct Level-1/Level-2 border router.
- Configure a compatible wide-metric IS-IS strategy across the intended area before applying large link costs.
- Allow normal PSNP-based missing-LSP acknowledgment or request processing to repair database synchronization.
- Align the intended IPv6 topology membership with the approved multi-topology design.
Explanation
Correct Answer
D:The fault stated in this case is: An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. The specific corrective action is: Align the intended IPv6 topology membership with the approved multi-topology design. Confirm it with: Inspect IPv4 and IPv6 topology advertisements for the missing transit link. The expected end-to-end outcome is: The intended IPv6 topology includes the link and authorized dual-stack destinations forward.
Incorrect Answers
A:The alternative is directed at this separate case: A remote Level-1 customer prefix must be reachable from the Level-2 backbone, but the border router's configured route leaking policy excludes that prefix. The present incident is: An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. The pertinent verification is: Inspect IPv4 and IPv6 topology advertisements for the missing transit link. The action or outcome to select here is: Align the intended IPv6 topology membership with the approved multi-topology design.
B:This choice does not address the stated situation: An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. Its competing context is: A routing design assigns a link cost above the legacy narrow-metric range, but a peer only understands narrow cost advertisements. The relevant diagnostic is: Inspect IPv4 and IPv6 topology advertisements for the missing transit link. The case-supported response is: Align the intended IPv6 topology membership with the approved multi-topology design.
C:The alternative applies to another situation: A router joins a newly restored point-to-point link and requests a missing LSP using PSNP, but the operator expects a full database reset. The reported case instead states: An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. The distinguishing check is: Inspect IPv4 and IPv6 topology advertisements for the missing transit link. The supported action or criterion is: Align the intended IPv6 topology membership with the approved multi-topology design.
Question 172
An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. Which TWO independent checks would best establish what is happening? (Select TWO.)
- Inspect the specific prefix in both Level-1 and Level-2 link-state databases.
- Compare per-topology SPF paths and route installation for the affected IPv6 destination.
- Inspect IPv4 and IPv6 topology advertisements for the missing transit link.
- Compare each device's IPv4 and IPv6 IS-IS address-family configuration.
- Inspect metric-style configuration and advertised reachability TLV values on both peers.
Explanation
Correct Answers
B:This is a direct diagnostic for the reported fault: Compare per-topology SPF paths and route installation for the affected IPv6 destination. A second independent check is: Inspect IPv4 and IPv6 topology advertisements for the missing transit link. Combined evidence distinguishes the fault before implementing: Align the intended IPv6 topology membership with the approved multi-topology design.
C:This is a direct diagnostic for the reported fault: Inspect IPv4 and IPv6 topology advertisements for the missing transit link. A second independent check is: Compare per-topology SPF paths and route installation for the affected IPv6 destination. Combined evidence distinguishes the fault before implementing: Align the intended IPv6 topology membership with the approved multi-topology design.
Incorrect Answers
A:This choice does not address the stated situation: An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. Its competing context is: A remote Level-1 customer prefix must be reachable from the Level-2 backbone, but the border router's configured route leaking policy excludes that prefix. The relevant diagnostic is: Inspect IPv4 and IPv6 topology advertisements for the missing transit link. The case-supported response is: Compare per-topology SPF paths and route installation for the affected IPv6 destination; and Inspect IPv4 and IPv6 topology advertisements for the missing transit link.
D:The actual case evidence is: An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. The proposed option addresses a different condition: A dual-stack core forms stable IS-IS adjacencies for IPv4, but no IPv6 prefixes propagate because one router lacks the corresponding address-family enablement. Confirm the distinction by checking: Inspect IPv4 and IPv6 topology advertisements for the missing transit link. The response supported by the evidence is: Compare per-topology SPF paths and route installation for the affected IPv6 destination; and Inspect IPv4 and IPv6 topology advertisements for the missing transit link.
E:The alternative is directed at this separate case: A routing design assigns a link cost above the legacy narrow-metric range, but a peer only understands narrow cost advertisements. The present incident is: An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. The pertinent verification is: Inspect IPv4 and IPv6 topology advertisements for the missing transit link. The action or outcome to select here is: Compare per-topology SPF paths and route installation for the affected IPv6 destination; and Inspect IPv4 and IPv6 topology advertisements for the missing transit link.
Question 173
An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. What is the key technical or security failure this situation can produce?
- Inconsistent metric styles can misrepresent costs and yield unexpected paths or incompatible advertisements.
- A working IPv4 shortest path does not guarantee the IPv6 topology includes identical links.
- Ignoring partial database synchronization can prolong stale routes or prompt unnecessary disruptive resets.
- An omitted legitimate interlevel route can isolate remote customers despite stable area adjacencies.
Explanation
Correct Answer
B:The observed condition is: An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. The principal operational or security impact is: A working IPv4 shortest path does not guarantee the IPv6 topology includes identical links. The supported repair is: Align the intended IPv6 topology membership with the approved multi-topology design. Risk describes a possible effect, not proof of every downstream failure.
Incorrect Answers
A:The alternative applies to another situation: A routing design assigns a link cost above the legacy narrow-metric range, but a peer only understands narrow cost advertisements. The reported case instead states: An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. The distinguishing check is: Inspect IPv4 and IPv6 topology advertisements for the missing transit link. The supported action or criterion is: A working IPv4 shortest path does not guarantee the IPv6 topology includes identical links.
C:The actual case evidence is: An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. The proposed option addresses a different condition: A router joins a newly restored point-to-point link and requests a missing LSP using PSNP, but the operator expects a full database reset. Confirm the distinction by checking: Inspect IPv4 and IPv6 topology advertisements for the missing transit link. The response supported by the evidence is: A working IPv4 shortest path does not guarantee the IPv6 topology includes identical links.
D:The alternative is directed at this separate case: A remote Level-1 customer prefix must be reachable from the Level-2 backbone, but the border router's configured route leaking policy excludes that prefix. The present incident is: An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. The pertinent verification is: Inspect IPv4 and IPv6 topology advertisements for the missing transit link. The action or outcome to select here is: A working IPv4 shortest path does not guarantee the IPv6 topology includes identical links.
Question 174
An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. Choose TWO complementary steps: one repair and one precaution against collateral impact. (Select TWO.)
- Repair the authorized interlevel route advertisement policy on the correct Level-1/Level-2 border router.
- Verify that the correct IPv4 reachability information is originated and allowed into the relevant level.
- Align the intended IPv6 topology membership with the approved multi-topology design.
- Enable the intended supported IS-IS IPv6 reachability capability without disrupting healthy IPv4 routing.
- Test a documentation IPv6 prefix and preserve IPv4 route programming during changes.
Explanation
Correct Answers
C:This is the required technical repair: Align the intended IPv6 topology membership with the approved multi-topology design. The separately necessary deployment safeguard is: Test a documentation IPv6 prefix and preserve IPv4 route programming during changes. Together they address: A working IPv4 shortest path does not guarantee the IPv6 topology includes identical links.
E:This safeguard prevents unwanted collateral effects: Test a documentation IPv6 prefix and preserve IPv4 route programming during changes. Its complementary corrective change is: Align the intended IPv6 topology membership with the approved multi-topology design. Both are required because: A working IPv4 shortest path does not guarantee the IPv6 topology includes identical links.
Incorrect Answers
A:These other facts could justify the alternative: A remote Level-1 customer prefix must be reachable from the Level-2 backbone, but the border router's configured route leaking policy excludes that prefix. They differ from the stated case: An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. Test the distinction using: Inspect IPv4 and IPv6 topology advertisements for the missing transit link. The case-specific response is: Align the intended IPv6 topology membership with the approved multi-topology design; and Test a documentation IPv6 prefix and preserve IPv4 route programming during changes.
B:The actual case evidence is: An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. The proposed option addresses a different condition: An IS-IS adjacency is fully Up but one IPv4 application subnet does not appear in its neighbor's route table after an interface was added. Confirm the distinction by checking: Inspect IPv4 and IPv6 topology advertisements for the missing transit link. The response supported by the evidence is: Align the intended IPv6 topology membership with the approved multi-topology design; and Test a documentation IPv6 prefix and preserve IPv4 route programming during changes.
D:This choice does not address the stated situation: An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. Its competing context is: A dual-stack core forms stable IS-IS adjacencies for IPv4, but no IPv6 prefixes propagate because one router lacks the corresponding address-family enablement. The relevant diagnostic is: Inspect IPv4 and IPv6 topology advertisements for the missing transit link. The case-supported response is: Align the intended IPv6 topology membership with the approved multi-topology design; and Test a documentation IPv6 prefix and preserve IPv4 route programming during changes.
Question 175
An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. What evidence would demonstrate that the intended fix worked correctly?
- The permitted prefix propagates between intended levels and customer packets follow a valid path.
- All participating routers interpret the intended metric values and compute valid shortest paths.
- The requested LSP arrives and both neighbors agree on the current database without area-wide resets.
- The intended IPv6 topology includes the link and authorized dual-stack destinations forward.
Explanation
Correct Answer
D:The acceptance measurement for this case is: The intended IPv6 topology includes the link and authorized dual-stack destinations forward. It establishes that the intended remediation (“Align the intended IPv6 topology membership with the approved multi-topology design”) was effective and can be corroborated by: Compare per-topology SPF paths and route installation for the affected IPv6 destination.
Incorrect Answers
A:The actual case evidence is: An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. The proposed option addresses a different condition: A remote Level-1 customer prefix must be reachable from the Level-2 backbone, but the border router's configured route leaking policy excludes that prefix. Confirm the distinction by checking: Inspect IPv4 and IPv6 topology advertisements for the missing transit link. The response supported by the evidence is: The intended IPv6 topology includes the link and authorized dual-stack destinations forward.
B:The alternative is directed at this separate case: A routing design assigns a link cost above the legacy narrow-metric range, but a peer only understands narrow cost advertisements. The present incident is: An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. The pertinent verification is: Inspect IPv4 and IPv6 topology advertisements for the missing transit link. The action or outcome to select here is: The intended IPv6 topology includes the link and authorized dual-stack destinations forward.
C:This choice does not address the stated situation: An IPv6 IS-IS multi-topology design excludes a transit interface that participates in the IPv4 topology, leaving IPv6 routes to one site unresolved. Its competing context is: A router joins a newly restored point-to-point link and requests a missing LSP using PSNP, but the operator expects a full database reset. The relevant diagnostic is: Inspect IPv4 and IPv6 topology advertisements for the missing transit link. The case-supported response is: The intended IPv6 topology includes the link and authorized dual-stack destinations forward.
Question 176
Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. Which corrective action best resolves this particular network fault?
- Review IS-IS DIS priority and tie-breaking rules, then set only approved election parameters if a change is necessary.
- Allow normal PSNP-based missing-LSP acknowledgment or request processing to repair database synchronization.
- Align the intended Level-1 area membership on the shared link rather than changing unrelated interface costs.
- Apply the documented DIS tie-breaking criteria and inspect the relevant MAC or system-ID identifiers.
Explanation
Correct Answer
D:The fault stated in this case is: Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. The specific corrective action is: Apply the documented DIS tie-breaking criteria and inspect the relevant MAC or system-ID identifiers. Confirm it with: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates. The expected end-to-end outcome is: The elected DIS is explained by equal-priority tie-breaks and the pseudonode view remains stable.
Incorrect Answers
A:The alternative is directed at this separate case: A broadcast segment elects a designated intermediate system with a higher advertised priority, but an engineer attempts to change link speed to force another router to become DIS. The present incident is: Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. The pertinent verification is: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates. The action or outcome to select here is: Apply the documented DIS tie-breaking criteria and inspect the relevant MAC or system-ID identifiers.
B:This choice does not address the stated situation: Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. Its competing context is: A router joins a newly restored point-to-point link and requests a missing LSP using PSNP, but the operator expects a full database reset. The relevant diagnostic is: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates. The case-supported response is: Apply the documented DIS tie-breaking criteria and inspect the relevant MAC or system-ID identifiers.
C:The alternative applies to another situation: Two Nokia routers on the same Ethernet circuit have matching link settings but never establish a Level-1 IS-IS adjacency because their NET area values differ. The reported case instead states: Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. The distinguishing check is: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates. The supported action or criterion is: Apply the documented DIS tie-breaking criteria and inspect the relevant MAC or system-ID identifiers.
Question 177
Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. Before proposing a change, which TWO observations would give the most useful confirmation? (Select TWO.)
- Inspect the PSNP identifier list and the neighbor's advertised LSP sequence values.
- Inspect each neighbor's configured NET area prefix and Level-1 adjacency counters during Hello exchange.
- Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates.
- Compare actual DIS assignment with the deterministic election rules for the interface.
- Compare both routers' NET values and the system-ID portion of the configured network entity titles.
Explanation
Correct Answers
C:This is a direct diagnostic for the reported fault: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates. A second independent check is: Compare actual DIS assignment with the deterministic election rules for the interface. Combined evidence distinguishes the fault before implementing: Apply the documented DIS tie-breaking criteria and inspect the relevant MAC or system-ID identifiers.
D:This is a direct diagnostic for the reported fault: Compare actual DIS assignment with the deterministic election rules for the interface. A second independent check is: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates. Combined evidence distinguishes the fault before implementing: Apply the documented DIS tie-breaking criteria and inspect the relevant MAC or system-ID identifiers.
Incorrect Answers
A:This choice does not address the stated situation: Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. Its competing context is: A router joins a newly restored point-to-point link and requests a missing LSP using PSNP, but the operator expects a full database reset. The relevant diagnostic is: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates. The case-supported response is: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates; and Compare actual DIS assignment with the deterministic election rules for the interface.
B:The alternative applies to another situation: Two Nokia routers on the same Ethernet circuit have matching link settings but never establish a Level-1 IS-IS adjacency because their NET area values differ. The reported case instead states: Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. The distinguishing check is: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates. The supported action or criterion is: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates; and Compare actual DIS assignment with the deterministic election rules for the interface.
E:The alternative is directed at this separate case: Two new Nokia edge routers use the same six-byte system ID in their NET configuration, causing inconsistent link-state origin records in a regional lab. The present incident is: Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. The pertinent verification is: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates. The action or outcome to select here is: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates; and Compare actual DIS assignment with the deterministic election rules for the interface.
Question 178
Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. Which statement best describes the immediate risk of ignoring this problem?
- Ignoring partial database synchronization can prolong stale routes or prompt unnecessary disruptive resets.
- Confusing link bandwidth with DIS election can trigger ineffective and disruptive interface changes.
- A mismatched area prevents Level-1 neighbor formation despite physical connectivity and valid IP routes.
- Misinterpreting election tie-breakers can cause unnecessary repeated adjacency resets.
Explanation
Correct Answer
D:The observed condition is: Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. The principal operational or security impact is: Misinterpreting election tie-breakers can cause unnecessary repeated adjacency resets. The supported repair is: Apply the documented DIS tie-breaking criteria and inspect the relevant MAC or system-ID identifiers. Risk describes a possible effect, not proof of every downstream failure.
Incorrect Answers
A:The alternative applies to another situation: A router joins a newly restored point-to-point link and requests a missing LSP using PSNP, but the operator expects a full database reset. The reported case instead states: Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. The distinguishing check is: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates. The supported action or criterion is: Misinterpreting election tie-breakers can cause unnecessary repeated adjacency resets.
B:These other facts could justify the alternative: A broadcast segment elects a designated intermediate system with a higher advertised priority, but an engineer attempts to change link speed to force another router to become DIS. They differ from the stated case: Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. Test the distinction using: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates. The case-specific response is: Misinterpreting election tie-breakers can cause unnecessary repeated adjacency resets.
C:The actual case evidence is: Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. The proposed option addresses a different condition: Two Nokia routers on the same Ethernet circuit have matching link settings but never establish a Level-1 IS-IS adjacency because their NET area values differ. Confirm the distinction by checking: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates. The response supported by the evidence is: Misinterpreting election tie-breakers can cause unnecessary repeated adjacency resets.
Question 179
Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. Which TWO measures together address the fault while protecting other services? (Select TWO.)
- Enable the intended Level-2 adjacency for the inter-area backbone while keeping Level-1 boundaries documented.
- Leave the functioning LAN untouched while validating the selection in a lab.
- Allow normal PSNP-based missing-LSP acknowledgment or request processing to repair database synchronization.
- Apply the documented DIS tie-breaking criteria and inspect the relevant MAC or system-ID identifiers.
- Assign a stable unique system ID to each routing system and retain the approved area addressing structure.
Explanation
Correct Answers
B:This safeguard prevents unwanted collateral effects: Leave the functioning LAN untouched while validating the selection in a lab. Its complementary corrective change is: Apply the documented DIS tie-breaking criteria and inspect the relevant MAC or system-ID identifiers. Both are required because: Misinterpreting election tie-breakers can cause unnecessary repeated adjacency resets.
D:This is the required technical repair: Apply the documented DIS tie-breaking criteria and inspect the relevant MAC or system-ID identifiers. The separately necessary deployment safeguard is: Leave the functioning LAN untouched while validating the selection in a lab. Together they address: Misinterpreting election tie-breakers can cause unnecessary repeated adjacency resets.
Incorrect Answers
A:These other facts could justify the alternative: A service core spans two different Level-1 areas, yet two aggregation routers were configured to exchange only Level-1 IS-IS information across their inter-area link. They differ from the stated case: Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. Test the distinction using: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates. The case-specific response is: Leave the functioning LAN untouched while validating the selection in a lab; and Apply the documented DIS tie-breaking criteria and inspect the relevant MAC or system-ID identifiers.
C:The alternative is directed at this separate case: A router joins a newly restored point-to-point link and requests a missing LSP using PSNP, but the operator expects a full database reset. The present incident is: Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. The pertinent verification is: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates. The action or outcome to select here is: Leave the functioning LAN untouched while validating the selection in a lab; and Apply the documented DIS tie-breaking criteria and inspect the relevant MAC or system-ID identifiers.
E:The alternative applies to another situation: Two new Nokia edge routers use the same six-byte system ID in their NET configuration, causing inconsistent link-state origin records in a regional lab. The reported case instead states: Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. The distinguishing check is: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates. The supported action or criterion is: Leave the functioning LAN untouched while validating the selection in a lab; and Apply the documented DIS tie-breaking criteria and inspect the relevant MAC or system-ID identifiers.
Question 180
Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. After the approved repair, which outcome best demonstrates that this exact fault is resolved?
- The authorized Level-1 neighbors reach Up state and exchange their expected area link-state information.
- The elected DIS is explained by equal-priority tie-breaks and the pseudonode view remains stable.
- The requested LSP arrives and both neighbors agree on the current database without area-wide resets.
- The selected DIS matches the authorized priority design and the LAN adjacency remains stable.
Explanation
Correct Answer
B:The acceptance measurement for this case is: The elected DIS is explained by equal-priority tie-breaks and the pseudonode view remains stable. It establishes that the intended remediation (“Apply the documented DIS tie-breaking criteria and inspect the relevant MAC or system-ID identifiers”) was effective and can be corroborated by: Compare actual DIS assignment with the deterministic election rules for the interface.
Incorrect Answers
A:The actual case evidence is: Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. The proposed option addresses a different condition: Two Nokia routers on the same Ethernet circuit have matching link settings but never establish a Level-1 IS-IS adjacency because their NET area values differ. Confirm the distinction by checking: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates. The response supported by the evidence is: The elected DIS is explained by equal-priority tie-breaks and the pseudonode view remains stable.
C:This choice does not address the stated situation: Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. Its competing context is: A router joins a newly restored point-to-point link and requests a missing LSP using PSNP, but the operator expects a full database reset. The relevant diagnostic is: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates. The case-supported response is: The elected DIS is explained by equal-priority tie-breaks and the pseudonode view remains stable.
D:The alternative applies to another situation: A broadcast segment elects a designated intermediate system with a higher advertised priority, but an engineer attempts to change link speed to force another router to become DIS. The reported case instead states: Two IS-IS routers on a LAN advertise the same DIS priority, but an operator expects the lower identifier to win an otherwise tied election. The distinguishing check is: Capture IS-IS LAN Hellos showing equal priorities and identities of all candidates. The supported action or criterion is: The elected DIS is explained by equal-priority tie-breaks and the pseudonode view remains stable.