Question 590
A log shipping monitor shows restore delay increasing because a previous log file is missing and the team resumes from a later file, breaking the chain. Which Azure SQL or SQL Server administrative approach is MOST appropriate?
Explanation
Correct Answer
Configure SQL Server log shipping across supported instances with reliable log backup, copy and restore schedules, delay and standby policies, then test manual recovery and ownership of jobs. This is the supported administration mechanism for the described workload. Log shipping is backup-copy-restore orchestration, not synchronous automatic database failover or a substitute for manual application cutover. Verify with: Inspect monitor-server history, last backup/copied/restored times, log chain continuity, share access, standby mode and restore delay.
Incorrect Answers
Build and monitor supported SQL Server Always On availability groups on Azure VMs and understand SQL MI link behavior, verifying cluster quorum, replica health, endpoint access and synchronization mode. This addresses Always On availability groups on SQL Server VMs and SQL MI links, not the controlling requirement here. An AG protects replicated user databases and requires cluster/listener configuration; it does not automatically synchronize every SQL Agent job or server-level login. Prefer: Configure SQL Server log shipping across supported instances with reliable log backup, copy and restore schedules, delay and standby policies, then test manual recovery and ownership of jobs.
Plan full, differential and transaction-log backups using appropriate SQL Server recovery model and restore order for the intended point-in-time objective. This addresses SQL Server native backup chain and recovery model, not the controlling requirement here. A full backup without subsequent transaction-log backups cannot recover every later transaction; SIMPLE recovery changes log backup support. Prefer: Configure SQL Server log shipping across supported instances with reliable log backup, copy and restore schedules, delay and standby policies, then test manual recovery and ownership of jobs.
Test availability and recovery plans with realistic but controlled primary outages, application write workload, backups and rollback exercises before claiming a recovery objective. This addresses HA DR tabletop and destructive failure testing, not the controlling requirement here. A failover button clicking successfully is not proof the application, authentication, jobs and downstream services all recovered end to end. Prefer: Configure SQL Server log shipping across supported instances with reliable log backup, copy and restore schedules, delay and standby policies, then test manual recovery and ownership of jobs.


