Question 130
A new switch is installed with a different software version than the approved baseline but no deviation is recorded. Which switching implementation or corrective action BEST addresses the underlying requirement?
Explanation
Correct Answer
Reconcile the approved design with actual interfaces, optics, firmware, cable labels and final switch configurations after deployment. This addresses the controlling network requirement rather than merely changing its symptoms. The approved design and final operating topology can diverge, requiring documented changes rather than silent drift. Verify before and after with: Compare installation photos, running and startup configs, topology neighbors, asset inventory and exception log. Scenario: A new switch is installed with a different software version than the approved baseline but no deviation is recorded.
Incorrect Answers
Calculate access ports, PoE classes and spare uplink capacity from endpoint inventory and growth rather than ordering by current occupied ports alone. This action instead applies to Port density and growth headroom. Port availability, available watts and uplink throughput are separate constraints in campus switch sizing. It does not directly resolve the controlling requirement. The targeted response is: Reconcile the approved design with actual interfaces, optics, firmware, cable labels and final switch configurations after deployment. Scenario: A new switch is installed with a different software version than the approved baseline but no deviation is recorded.
Correct the precise RADIUS, EAP or role-download fault while retaining least-privilege policy and test-deny behavior. This action instead applies to Authentication and RADIUS remediation discipline. Replacing an authentication outage with unrestricted open ports is not equivalent to a secure remediation. It does not directly resolve the controlling requirement. The targeted response is: Reconcile the approved design with actual interfaces, optics, firmware, cable labels and final switch configurations after deployment. Scenario: A new switch is installed with a different software version than the approved baseline but no deviation is recorded.
Schedule VLAN creation, trunk allowance, SVI services and routing prerequisites before switching live endpoint traffic. This action instead applies to Dependency ordering for VLAN and routed cutovers. Changes to L2 carriage and L3 gateway reachability must be ordered to avoid transient black holes. It does not directly resolve the controlling requirement. The targeted response is: Reconcile the approved design with actual interfaces, optics, firmware, cable labels and final switch configurations after deployment. Scenario: A new switch is installed with a different software version than the approved baseline but no deviation is recorded.