cert
cert-1
cert-2

Pass CompTIA N10-009 Exam in First Attempt Guaranteed!

Get 100% Latest Exam Questions, Accurate & Verified Answers to Pass the Actual Exam!
30 Days Free Updates, Instant Download!

cert-5
cert-6
N10-009 Exam - Verified By Experts
N10-009 Premium Bundle
$29.98

N10-009 Premium Bundle

$79.99
$109.97
  • Premium File 768 Questions & Answers. Last update: Nov 13, 2026
  • Training Course 240 Video Lectures
  • Study Guide 128 Pages
 
$109.97
$79.99
accept 176 downloads in last 7 days
block-screenshots
Purchase CompTIA N10-009 Exam Training Products Individually
CompTIA N10-009 Premium File
Premium File 768 Q&A
$76.99$69.99
CompTIA N10-009 Video Training Course
Training Course 240 Lectures
$21.99 $19.99
CompTIA N10-009 PDF Study Guide
Study Guide 128 Pages
$21.99 $19.99
CompTIA N10-009 Practice Test 44

Question 430

Two load-balanced application sites must process traffic simultaneously and continue after one site fails. A colleague instead suggests: Keep the secondary site powered off yet label the service active-active. Which finding MOST specifically explains why that suggestion is unsuitable?

  1. An offline passive site is not actively serving user traffic.
  2. Active-active capacity serves requests concurrently while retaining service under failure.
  3. MTBF is not an RTO or guaranteed maximum incident restoration time.
  4. Data consistency constraints can dictate a passive writer even when front ends are active.

Explanation

Correct Answer

A:

An offline passive site is not actively serving user traffic. This flaw directly concerns the proposed action: Keep the secondary site powered off yet label the service active-active.

Incorrect Answers

B:

This explains why the recommended control works: Use an active-active design with data consistency and health-based traffic management.

C:

This flaw concerns a different case in objective 3.3: A hardware team needs to reduce average repair duration and compare reliability of two switch models. The current rejected proposal is: Keep the secondary site powered off yet label the service active-active.

D:

This rationale belongs to a later changed condition: The application database cannot safely accept simultaneous active writes.

Question 431

Two load-balanced application sites must process traffic simultaneously and continue after one site fails. After applying the solution 'Use an active-active design with data consistency and health-based traffic management.', which observation MOST directly proves that the requirement was met?

  1. Approval is recorded for 'Use an active-active design with data consistency and health-based traffic management.' but no operational validation is performed.
  2. A controlled site failure leaves remaining endpoints serving correct transactions.
  3. Incident metrics correctly separate failure frequency and actual repair durations.
  4. A timed restoration drill returns the directory service within 20 minutes.

Explanation

Correct Answer

B:

A controlled site failure leaves remaining endpoints serving correct transactions. It tests the intended outcome because active-active capacity serves requests concurrently while retaining service under failure.

Incorrect Answers

A:

The missing direct test is: A controlled site failure leaves remaining endpoints serving correct transactions.

C:

This observation is for a different condition: A hardware team needs to reduce average repair duration and compare reliability of two switch models. It does not directly test the target outcome: Two load-balanced application sites must process traffic simultaneously and continue after one site fails.

D:

This test addresses a separate problem: A core directory service can tolerate at most 20 minutes of outage but backups are tested only annually.

Question 432

The original case was: Two load-balanced application sites must process traffic simultaneously and continue after one site fails. The requirement then changes: The application database cannot safely accept simultaneous active writes. Which revised action BEST meets this new condition?

  1. Reevaluate active-passive or single-writer replication with failover.
  2. Use an active-active design with data consistency and health-based traffic management.
  3. A controlled site failure leaves remaining endpoints serving correct transactions.
  4. Keep the secondary site powered off yet label the service active-active.

Explanation

Correct Answer

A:

Data consistency constraints can dictate a passive writer even when front ends are active. The revised requirement is: The application database cannot safely accept simultaneous active writes. The appropriate action is: Reevaluate active-passive or single-writer replication with failover.

Incorrect Answers

B:

This is the original control. Active-active capacity serves requests concurrently while retaining service under failure. It does not directly satisfy the revised requirement: The application database cannot safely accept simultaneous active writes.

C:

A controlled site failure leaves remaining endpoints serving correct transactions. The current requirement is: The application database cannot safely accept simultaneous active writes.

D:

An offline passive site is not actively serving user traffic. It remains inappropriate in the revised context.

Question 433

A recovery team wants to practice decision-making during a crisis but is not permitted to fail over real services. Which action MOST directly meets the stated networking requirement?

  1. Set an RTO of 20 minutes and exercise a recovery procedure capable of meeting it.
  2. Disconnect production power to simulate realism without authorization.
  3. Run a tabletop exercise with roles, timed injects and documented decisions.
  4. Run restoration validation using representative isolated systems.

Explanation

Correct Answer

C:

Tabletops rehearse coordination and escalation without interrupting production. This specifically resolves: A recovery team wants to practice decision-making during a crisis but is not permitted to fail over real services.

Incorrect Answers

A:

This addresses another problem in objective 3.3: A core directory service can tolerate at most 20 minutes of outage but backups are tested only annually.

B:

Full interruption conflicts with the stated no-outage constraint. The suggested approach is: Disconnect production power to simulate realism without authorization.

D:

This action responds to a later condition: Management later authorizes technical recovery in a completely isolated lab. Technical validation measures implementation beyond discussion-only exercises.

Question 434

A recovery team wants to practice decision-making during a crisis but is not permitted to fail over real services. A colleague instead suggests: Disconnect production power to simulate realism without authorization. Which finding MOST specifically explains why that suggestion is unsuitable?

  1. Full interruption conflicts with the stated no-outage constraint.
  2. Tabletops rehearse coordination and escalation without interrupting production.
  3. RPO concerns recoverable data loss, not the elapsed service outage.
  4. Technical validation measures implementation beyond discussion-only exercises.

Explanation

Correct Answer

A:

Full interruption conflicts with the stated no-outage constraint. This flaw directly concerns the proposed action: Disconnect production power to simulate realism without authorization.

Incorrect Answers

B:

This explains why the recommended control works: Run a tabletop exercise with roles, timed injects and documented decisions.

C:

This flaw concerns a different case in objective 3.3: A core directory service can tolerate at most 20 minutes of outage but backups are tested only annually. The current rejected proposal is: Disconnect production power to simulate realism without authorization.

D:

This rationale belongs to a later changed condition: Management later authorizes technical recovery in a completely isolated lab.

Question 435

A recovery team wants to practice decision-making during a crisis but is not permitted to fail over real services. After applying the solution 'Run a tabletop exercise with roles, timed injects and documented decisions.', which observation MOST directly proves that the requirement was met?

  1. Postexercise records document actions, owner gaps and follow-up assignments.
  2. Approval is recorded for 'Run a tabletop exercise with roles, timed injects and documented decisions.' but no operational validation is performed.
  3. A timed restoration drill returns the directory service within 20 minutes.
  4. A restore test loses no more than the approved ten-minute transaction window.

Explanation

Correct Answer

A:

Postexercise records document actions, owner gaps and follow-up assignments. It tests the intended outcome because tabletops rehearse coordination and escalation without interrupting production.

Incorrect Answers

B:

The missing direct test is: Postexercise records document actions, owner gaps and follow-up assignments.

C:

This observation is for a different condition: A core directory service can tolerate at most 20 minutes of outage but backups are tested only annually. It does not directly test the target outcome: A recovery team wants to practice decision-making during a crisis but is not permitted to fail over real services.

D:

This test addresses a separate problem: An accounting system may lose at most ten minutes of transactions when its primary storage fails.

Question 436

The original case was: A recovery team wants to practice decision-making during a crisis but is not permitted to fail over real services. The requirement then changes: Management later authorizes technical recovery in a completely isolated lab. Which revised action BEST meets this new condition?

  1. Disconnect production power to simulate realism without authorization.
  2. Postexercise records document actions, owner gaps and follow-up assignments.
  3. Run restoration validation using representative isolated systems.
  4. Run a tabletop exercise with roles, timed injects and documented decisions.

Explanation

Correct Answer

C:

Technical validation measures implementation beyond discussion-only exercises. The revised requirement is: Management later authorizes technical recovery in a completely isolated lab. The appropriate action is: Run restoration validation using representative isolated systems.

Incorrect Answers

A:

Full interruption conflicts with the stated no-outage constraint. It remains inappropriate in the revised context.

B:

Postexercise records document actions, owner gaps and follow-up assignments. The current requirement is: Management later authorizes technical recovery in a completely isolated lab.

D:

This is the original control. Tabletops rehearse coordination and escalation without interrupting production. It does not directly satisfy the revised requirement: Management later authorizes technical recovery in a completely isolated lab.

Question 437

A hardware team needs to reduce average repair duration and compare reliability of two switch models. Which action MOST directly meets the stated networking requirement?

  1. Set a business-approved RTO and validate feasible restoration.
  2. Interpret MTBF as the contractual maximum repair outage duration.
  3. Track MTTR for service repair and MTBF for failures using consistent incident data.
  4. Choose an RPO of ten minutes and design sufficiently frequent data protection.

Explanation

Correct Answer

C:

MTTR measures average repair time and MTBF measures time between failures for repairable assets. This specifically resolves: A hardware team needs to reduce average repair duration and compare reliability of two switch models.

Incorrect Answers

A:

This action responds to a later condition: Business owners need a maximum acceptable outage instead of an observed repair average. RTO is a forward-looking recovery target rather than historical repair performance.

B:

MTBF is not an RTO or guaranteed maximum incident restoration time. The suggested approach is: Interpret MTBF as the contractual maximum repair outage duration.

D:

This addresses another problem in objective 3.3: An accounting system may lose at most ten minutes of transactions when its primary storage fails.

Question 438

A hardware team needs to reduce average repair duration and compare reliability of two switch models. A colleague instead suggests: Interpret MTBF as the contractual maximum repair outage duration. Which finding MOST specifically explains why that suggestion is unsuitable?

  1. MTBF is not an RTO or guaranteed maximum incident restoration time.
  2. MTTR measures average repair time and MTBF measures time between failures for repairable assets.
  3. RTO is a forward-looking recovery target rather than historical repair performance.
  4. Restoration time alone does not guarantee recovered data currency.

Explanation

Correct Answer

A:

MTBF is not an RTO or guaranteed maximum incident restoration time. This flaw directly concerns the proposed action: Interpret MTBF as the contractual maximum repair outage duration.

Incorrect Answers

B:

This explains why the recommended control works: Track MTTR for service repair and MTBF for failures using consistent incident data.

C:

This rationale belongs to a later changed condition: Business owners need a maximum acceptable outage instead of an observed repair average.

D:

This flaw concerns a different case in objective 3.3: An accounting system may lose at most ten minutes of transactions when its primary storage fails. The current rejected proposal is: Interpret MTBF as the contractual maximum repair outage duration.

Question 439

A hardware team needs to reduce average repair duration and compare reliability of two switch models. After applying the solution 'Track MTTR for service repair and MTBF for failures using consistent incident data.', which observation MOST directly proves that the requirement was met?

  1. A restore test loses no more than the approved ten-minute transaction window.
  2. Approval is recorded for 'Track MTTR for service repair and MTBF for failures using consistent incident data.' but no operational validation is performed.
  3. A simulated cutover meets approved service RTO and RPO.
  4. Incident metrics correctly separate failure frequency and actual repair durations.

Explanation

Correct Answer

D:

Incident metrics correctly separate failure frequency and actual repair durations. It tests the intended outcome because mttr measures average repair time and mtbf measures time between failures for repairable assets.

Incorrect Answers

A:

This observation is for a different condition: An accounting system may lose at most ten minutes of transactions when its primary storage fails. It does not directly test the target outcome: A hardware team needs to reduce average repair duration and compare reliability of two switch models.

B:

The missing direct test is: Incident metrics correctly separate failure frequency and actual repair durations.

C:

This test addresses a separate problem: A disaster recovery facility must accept critical workloads within minutes after the primary datacenter is lost.

Question 440

The original case was: A hardware team needs to reduce average repair duration and compare reliability of two switch models. The requirement then changes: Business owners need a maximum acceptable outage instead of an observed repair average. Which revised action BEST meets this new condition?

  1. Set a business-approved RTO and validate feasible restoration.
  2. Track MTTR for service repair and MTBF for failures using consistent incident data.
  3. Incident metrics correctly separate failure frequency and actual repair durations.
  4. Interpret MTBF as the contractual maximum repair outage duration.

Explanation

Correct Answer

A:

RTO is a forward-looking recovery target rather than historical repair performance. The revised requirement is: Business owners need a maximum acceptable outage instead of an observed repair average. The appropriate action is: Set a business-approved RTO and validate feasible restoration.

Incorrect Answers

B:

This is the original control. MTTR measures average repair time and MTBF measures time between failures for repairable assets. It does not directly satisfy the revised requirement: Business owners need a maximum acceptable outage instead of an observed repair average.

C:

Incident metrics correctly separate failure frequency and actual repair durations. The current requirement is: Business owners need a maximum acceptable outage instead of an observed repair average.

D:

MTBF is not an RTO or guaranteed maximum incident restoration time. It remains inappropriate in the revised context.

CompTIA Network+ (N10-009) Practice Tests