CompTIA N10-009 Practice Test 43
Question 420
The original case was: An accounting system may lose at most ten minutes of transactions when its primary storage fails. The requirement then changes: Recovery must also finish before the next scheduled business shift. Which revised action BEST meets this new condition?
- A restore test loses no more than the approved ten-minute transaction window.
- Set a ten-minute RTO and assume it protects the last ten minutes of transactions.
- Choose an RPO of ten minutes and design sufficiently frequent data protection.
- Set and test an appropriate RTO aligned to shift start.
Explanation
Correct Answer
D:Acceptable outage duration is separate from acceptable data loss. The revised requirement is: Recovery must also finish before the next scheduled business shift. The appropriate action is: Set and test an appropriate RTO aligned to shift start.
Incorrect Answers
A:A restore test loses no more than the approved ten-minute transaction window. The current requirement is: Recovery must also finish before the next scheduled business shift.
B:Restoration time alone does not guarantee recovered data currency. It remains inappropriate in the revised context.
C:This is the original control. RPO expresses acceptable data loss measured back from the disruption. It does not directly satisfy the revised requirement: Recovery must also finish before the next scheduled business shift.
Question 421
A disaster recovery facility must accept critical workloads within minutes after the primary datacenter is lost. Which action MOST directly meets the stated networking requirement?
- Select an empty cold warehouse and expect immediate production service.
- Use an active-active design with data consistency and health-based traffic management.
- Choose a lower-cost warm or cold arrangement after business approval.
- Use a fully provisioned hot site with tested data synchronization and cutover.
Explanation
Correct Answer
D:Hot sites have ready infrastructure for rapid restoration compared with unequipped sites. This specifically resolves: A disaster recovery facility must accept critical workloads within minutes after the primary datacenter is lost.
Incorrect Answers
A:Cold sites require deployment and restoration time before serving workloads. The suggested approach is: Select an empty cold warehouse and expect immediate production service.
B:This addresses another problem in objective 3.3: Two load-balanced application sites must process traffic simultaneously and continue after one site fails.
C:This action responds to a later condition: The organization changes to a noncritical archive with several days recovery tolerance. Long recovery tolerance can justify less continuously provisioned infrastructure.
Question 422
A disaster recovery facility must accept critical workloads within minutes after the primary datacenter is lost. A colleague instead suggests: Select an empty cold warehouse and expect immediate production service. Which finding MOST specifically explains why that suggestion is unsuitable?
- Cold sites require deployment and restoration time before serving workloads.
- Hot sites have ready infrastructure for rapid restoration compared with unequipped sites.
- An offline passive site is not actively serving user traffic.
- Long recovery tolerance can justify less continuously provisioned infrastructure.
Explanation
Correct Answer
A:Cold sites require deployment and restoration time before serving workloads. This flaw directly concerns the proposed action: Select an empty cold warehouse and expect immediate production service.
Incorrect Answers
B:This explains why the recommended control works: Use a fully provisioned hot site with tested data synchronization and cutover.
C:This flaw concerns a different case in objective 3.3: Two load-balanced application sites must process traffic simultaneously and continue after one site fails. The current rejected proposal is: Select an empty cold warehouse and expect immediate production service.
D:This rationale belongs to a later changed condition: The organization changes to a noncritical archive with several days recovery tolerance.
Question 423
A disaster recovery facility must accept critical workloads within minutes after the primary datacenter is lost. After applying the solution 'Use a fully provisioned hot site with tested data synchronization and cutover.', which observation MOST directly proves that the requirement was met?
- Approval is recorded for 'Use a fully provisioned hot site with tested data synchronization and cutover.' but no operational validation is performed.
- A controlled site failure leaves remaining endpoints serving correct transactions.
- Postexercise records document actions, owner gaps and follow-up assignments.
- A simulated cutover meets approved service RTO and RPO.
Explanation
Correct Answer
D:A simulated cutover meets approved service RTO and RPO. It tests the intended outcome because hot sites have ready infrastructure for rapid restoration compared with unequipped sites.
Incorrect Answers
A:Approval alone does not demonstrate operating effectiveness. The missing direct test is: A simulated cutover meets approved service RTO and RPO.
B:This observation is for a different condition: Two load-balanced application sites must process traffic simultaneously and continue after one site fails. It does not directly test the target outcome: A disaster recovery facility must accept critical workloads within minutes after the primary datacenter is lost.
C:This test addresses a separate problem: A recovery team wants to practice decision-making during a crisis but is not permitted to fail over real services.
Question 424
The original case was: A disaster recovery facility must accept critical workloads within minutes after the primary datacenter is lost. The requirement then changes: The organization changes to a noncritical archive with several days recovery tolerance. Which revised action BEST meets this new condition?
- Use a fully provisioned hot site with tested data synchronization and cutover.
- Choose a lower-cost warm or cold arrangement after business approval.
- Select an empty cold warehouse and expect immediate production service.
- A simulated cutover meets approved service RTO and RPO.
Explanation
Correct Answer
B:Long recovery tolerance can justify less continuously provisioned infrastructure. The revised requirement is: The organization changes to a noncritical archive with several days recovery tolerance. The appropriate action is: Choose a lower-cost warm or cold arrangement after business approval.
Incorrect Answers
A:This is the original control. Hot sites have ready infrastructure for rapid restoration compared with unequipped sites. It does not directly satisfy the revised requirement: The organization changes to a noncritical archive with several days recovery tolerance.
C:Cold sites require deployment and restoration time before serving workloads. It remains inappropriate in the revised context.
D:A simulated cutover meets approved service RTO and RPO. The current requirement is: The organization changes to a noncritical archive with several days recovery tolerance.
Question 425
A small department can tolerate several days of downtime and wants the cheapest secondary recovery location. Which TWO entries together specify the appropriate corrective measure AND the strongest direct evidence that it works? (Select TWO.)
- Upgrade to a tested hot or sufficiently capable active recovery architecture.
- Purchase a continuously running full hot site without any business-need analysis.
- A scheduled recovery exercise confirms the build process meets the approved RTO.
- Consider a cold site with documented build and restoration procedures.
- Run a tabletop exercise with roles, timed injects and documented decisions.
Explanation
Correct Answers
C:Correct verification. A scheduled recovery exercise confirms the build process meets the approved RTO. This demonstrates the outcome expected from: Consider a cold site with documented build and restoration procedures.
D:Correct control. Cold sites reduce standing cost at the price of longer recovery time. It addresses the present requirement: A small department can tolerate several days of downtime and wants the cheapest secondary recovery location.
Incorrect Answers
A:This is a response to a different later requirement: The service becomes life-critical with a recovery target measured in minutes. New recovery urgency changes required standby readiness. It is not the original control-and-evidence pair.
B:Incorrect control. High-cost instant capacity may be unnecessary for generous downtime tolerance. The inappropriate proposal is: Purchase a continuously running full hot site without any business-need analysis.
E:This control fits another scenario in objective 3.3: A recovery team wants to practice decision-making during a crisis but is not permitted to fail over real services. It does not directly verify or implement the present issue.
Question 426
A small department can tolerate several days of downtime and wants the cheapest secondary recovery location. A colleague instead suggests: Purchase a continuously running full hot site without any business-need analysis. Which finding MOST specifically explains why that suggestion is unsuitable?
- Cold sites reduce standing cost at the price of longer recovery time.
- New recovery urgency changes required standby readiness.
- High-cost instant capacity may be unnecessary for generous downtime tolerance.
- Full interruption conflicts with the stated no-outage constraint.
Explanation
Correct Answer
C:High-cost instant capacity may be unnecessary for generous downtime tolerance. This flaw directly concerns the proposed action: Purchase a continuously running full hot site without any business-need analysis.
Incorrect Answers
A:This explains why the recommended control works: Consider a cold site with documented build and restoration procedures.
B:This rationale belongs to a later changed condition: The service becomes life-critical with a recovery target measured in minutes.
D:This flaw concerns a different case in objective 3.3: A recovery team wants to practice decision-making during a crisis but is not permitted to fail over real services. The current rejected proposal is: Purchase a continuously running full hot site without any business-need analysis.
Question 427
A small department can tolerate several days of downtime and wants the cheapest secondary recovery location. After applying the solution 'Consider a cold site with documented build and restoration procedures.', which observation MOST directly proves that the requirement was met?
- Postexercise records document actions, owner gaps and follow-up assignments.
- Incident metrics correctly separate failure frequency and actual repair durations.
- A scheduled recovery exercise confirms the build process meets the approved RTO.
- Approval is recorded for 'Consider a cold site with documented build and restoration procedures.' but no operational validation is performed.
Explanation
Correct Answer
C:A scheduled recovery exercise confirms the build process meets the approved RTO. It tests the intended outcome because cold sites reduce standing cost at the price of longer recovery time.
Incorrect Answers
A:This observation is for a different condition: A recovery team wants to practice decision-making during a crisis but is not permitted to fail over real services. It does not directly test the target outcome: A small department can tolerate several days of downtime and wants the cheapest secondary recovery location.
B:This test addresses a separate problem: A hardware team needs to reduce average repair duration and compare reliability of two switch models.
D:The missing direct test is: A scheduled recovery exercise confirms the build process meets the approved RTO.
Question 428
The original case was: A small department can tolerate several days of downtime and wants the cheapest secondary recovery location. The requirement then changes: The service becomes life-critical with a recovery target measured in minutes. Which revised action BEST meets this new condition?
- Consider a cold site with documented build and restoration procedures.
- Purchase a continuously running full hot site without any business-need analysis.
- A scheduled recovery exercise confirms the build process meets the approved RTO.
- Upgrade to a tested hot or sufficiently capable active recovery architecture.
Explanation
Correct Answer
D:New recovery urgency changes required standby readiness. The revised requirement is: The service becomes life-critical with a recovery target measured in minutes. The appropriate action is: Upgrade to a tested hot or sufficiently capable active recovery architecture.
Incorrect Answers
A:This is the original control. Cold sites reduce standing cost at the price of longer recovery time. It does not directly satisfy the revised requirement: The service becomes life-critical with a recovery target measured in minutes.
B:High-cost instant capacity may be unnecessary for generous downtime tolerance. It remains inappropriate in the revised context.
C:A scheduled recovery exercise confirms the build process meets the approved RTO. The current requirement is: The service becomes life-critical with a recovery target measured in minutes.
Question 429
Two load-balanced application sites must process traffic simultaneously and continue after one site fails. Which action MOST directly meets the stated networking requirement?
- Keep the secondary site powered off yet label the service active-active.
- Use an active-active design with data consistency and health-based traffic management.
- Track MTTR for service repair and MTBF for failures using consistent incident data.
- Reevaluate active-passive or single-writer replication with failover.
Explanation
Correct Answer
B:Active-active capacity serves requests concurrently while retaining service under failure. This specifically resolves: Two load-balanced application sites must process traffic simultaneously and continue after one site fails.
Incorrect Answers
A:An offline passive site is not actively serving user traffic. The suggested approach is: Keep the secondary site powered off yet label the service active-active.
C:This addresses another problem in objective 3.3: A hardware team needs to reduce average repair duration and compare reliability of two switch models.
D:This action responds to a later condition: The application database cannot safely accept simultaneous active writes. Data consistency constraints can dictate a passive writer even when front ends are active.
Question 430
Two load-balanced application sites must process traffic simultaneously and continue after one site fails. A colleague instead suggests: Keep the secondary site powered off yet label the service active-active. Which finding MOST specifically explains why that suggestion is unsuitable?
- An offline passive site is not actively serving user traffic.
- Active-active capacity serves requests concurrently while retaining service under failure.
- MTBF is not an RTO or guaranteed maximum incident restoration time.
- Data consistency constraints can dictate a passive writer even when front ends are active.
Explanation
Correct Answer
A:An offline passive site is not actively serving user traffic. This flaw directly concerns the proposed action: Keep the secondary site powered off yet label the service active-active.
Incorrect Answers
B:This explains why the recommended control works: Use an active-active design with data consistency and health-based traffic management.
C:This flaw concerns a different case in objective 3.3: A hardware team needs to reduce average repair duration and compare reliability of two switch models. The current rejected proposal is: Keep the secondary site powered off yet label the service active-active.
D:This rationale belongs to a later changed condition: The application database cannot safely accept simultaneous active writes.