CompTIA N10-009 Practice Test 27
Question 260
The original case was: A storage fabric requires 9000-byte frames but an intermediate switch only allows the standard MTU. The requirement then changes: The service moves to an internet path with unknown intermediate MTU. Which revised action BEST meets this new condition?
- Configure 9000 on the endpoints only and ignore transit devices.
- Use path MTU discovery and conservative packet sizing.
- Set a consistent supported jumbo-frame MTU along the entire intended path.
- End-to-end jumbo packet testing succeeds without unexpected drops.
Explanation
Correct Answer
B:Internet transit cannot assume jumbo-frame support. The revised requirement is: The service moves to an internet path with unknown intermediate MTU. The appropriate action is: Use path MTU discovery and conservative packet sizing.
Incorrect Answers
A:End host MTU cannot force an intermediate link to accept larger frames. It remains inappropriate in the revised context.
C:This is the original control. Any smaller-MTU hop may drop oversized frames or cause fragmentation-related issues. It does not directly satisfy the revised requirement: The service moves to an internet path with unknown intermediate MTU.
D:End-to-end jumbo packet testing succeeds without unexpected drops. The current requirement is: The service moves to an internet path with unknown intermediate MTU.
Question 261
A security-sensitive VLAN has unused access ports left enabled and connected to wall jacks. Which action MOST directly meets the stated networking requirement?
- Shut unused ports and assign a nonproduction VLAN under port-security policy.
- Enable appropriate port-based access control and dynamic VLAN policy.
- Assign the access interface to VLAN 30 and verify membership.
- Enable unrestricted auto-trunk negotiation on every unused access port.
Explanation
Correct Answer
A:Unused active switchports create unnecessary physical admission paths. This specifically resolves: A security-sensitive VLAN has unused access ports left enabled and connected to wall jacks.
Incorrect Answers
B:This action responds to a later condition: The building installs corporate 802.1X authentication for managed devices. 802.1X adds authenticated network admission beyond merely disabling unused ports.
C:This addresses another problem in objective 2.2: An employee port belongs in VLAN 30 but the switch currently places it in VLAN 10.
D:Auto trunking expands unintended layer-2 access if misused. The suggested approach is: Enable unrestricted auto-trunk negotiation on every unused access port.
Question 262
A security-sensitive VLAN has unused access ports left enabled and connected to wall jacks. A colleague instead suggests: Enable unrestricted auto-trunk negotiation on every unused access port. Which finding MOST specifically explains why that suggestion is unsuitable?
- 802.1X adds authenticated network admission beyond merely disabling unused ports.
- Unused active switchports create unnecessary physical admission paths.
- Auto trunking expands unintended layer-2 access if misused.
- DNS settings cannot alter physical port VLAN assignment.
Explanation
Correct Answer
C:Auto trunking expands unintended layer-2 access if misused. This flaw directly concerns the proposed action: Enable unrestricted auto-trunk negotiation on every unused access port.
Incorrect Answers
A:This rationale belongs to a later changed condition: The building installs corporate 802.1X authentication for managed devices.
B:This explains why the recommended control works: Shut unused ports and assign a nonproduction VLAN under port-security policy.
D:This flaw concerns a different case in objective 2.2: An employee port belongs in VLAN 30 but the switch currently places it in VLAN 10. The current rejected proposal is: Enable unrestricted auto-trunk negotiation on every unused access port.
Question 263
A security-sensitive VLAN has unused access ports left enabled and connected to wall jacks. After applying the solution 'Shut unused ports and assign a nonproduction VLAN under port-security policy.', which observation MOST directly proves that the requirement was met?
- Both sides report the allowed trunk VLANs and clients communicate only in intended segments.
- The MAC table and address allocation show the client in VLAN 30.
- An unapproved test connection cannot join any production VLAN.
- Approval is recorded for 'Shut unused ports and assign a nonproduction VLAN under port-security policy.' but no operational validation is performed.
Explanation
Correct Answer
C:An unapproved test connection cannot join any production VLAN. It tests the intended outcome because unused active switchports create unnecessary physical admission paths.
Incorrect Answers
A:This test addresses a separate problem: Two managed switches must carry VLANs 10, 20 and 40 over one inter-switch fiber link.
B:This observation is for a different condition: An employee port belongs in VLAN 30 but the switch currently places it in VLAN 10. It does not directly test the target outcome: A security-sensitive VLAN has unused access ports left enabled and connected to wall jacks.
D:Approval alone does not demonstrate operating effectiveness. The missing direct test is: An unapproved test connection cannot join any production VLAN.
Question 264
The original case was: A security-sensitive VLAN has unused access ports left enabled and connected to wall jacks. The requirement then changes: The building installs corporate 802.1X authentication for managed devices. Which revised action BEST meets this new condition?
- Enable unrestricted auto-trunk negotiation on every unused access port.
- Enable appropriate port-based access control and dynamic VLAN policy.
- Shut unused ports and assign a nonproduction VLAN under port-security policy.
- An unapproved test connection cannot join any production VLAN.
Explanation
Correct Answer
B:Correct. 802.1X adds authenticated network admission beyond merely disabling unused ports. The revised requirement is: The building installs corporate 802.1X authentication for managed devices. The appropriate action is: Enable appropriate port-based access control and dynamic VLAN policy.
Incorrect Answers
A:Auto trunking expands unintended layer-2 access if misused. It remains inappropriate in the revised context.
C:This is the original control. Unused active switchports create unnecessary physical admission paths. It does not directly satisfy the revised requirement: The building installs corporate 802.1X authentication for managed devices.
D:An unapproved test connection cannot join any production VLAN. The current requirement is: The building installs corporate 802.1X authentication for managed devices.
Question 265
A network wants to discover which switch became spanning-tree root after a maintenance change. Which action MOST directly meets the stated networking requirement?
- Use a traceroute to determine Ethernet spanning-tree bridge priority.
- Inspect root bridge IDs and STP port roles across the affected topology.
- Set an appropriate STP root priority and test controlled convergence.
- Configure an 802.1Q trunk with explicitly allowed VLANs and consistent native VLAN rules.
Explanation
Correct Answer
B:Root selection depends on bridge priority and MAC when priorities tie. This specifically resolves: A network wants to discover which switch became spanning-tree root after a maintenance change.
Incorrect Answers
A:IP hop tracing does not identify layer-2 STP election details. The suggested approach is: Use a traceroute to determine Ethernet spanning-tree bridge priority.
C:This action responds to a later condition: The root must move deliberately to a resilient distribution switch. Root placement is an engineering policy choice that must be verified.
D:This addresses another problem in objective 2.2: Two managed switches must carry VLANs 10, 20 and 40 over one inter-switch fiber link.
Question 266
A network wants to discover which switch became spanning-tree root after a maintenance change. A colleague instead suggests: Use a traceroute to determine Ethernet spanning-tree bridge priority. Which finding MOST specifically explains why that suggestion is unsuitable?
- Root selection depends on bridge priority and MAC when priorities tie.
- IP hop tracing does not identify layer-2 STP election details.
- Root placement is an engineering policy choice that must be verified.
- Access ports ordinarily transmit a single VLAN and cannot carry all specified tags.
Explanation
Correct Answer
B:IP hop tracing does not identify layer-2 STP election details. This flaw directly concerns the proposed action: Use a traceroute to determine Ethernet spanning-tree bridge priority.
Incorrect Answers
A:This explains why the recommended control works: Inspect root bridge IDs and STP port roles across the affected topology.
C:This rationale belongs to a later changed condition: The root must move deliberately to a resilient distribution switch.
D:This flaw concerns a different case in objective 2.2: Two managed switches must carry VLANs 10, 20 and 40 over one inter-switch fiber link. The current rejected proposal is: Use a traceroute to determine Ethernet spanning-tree bridge priority.
Question 267
A network wants to discover which switch became spanning-tree root after a maintenance change. After applying the solution 'Inspect root bridge IDs and STP port roles across the affected topology.', which observation MOST directly proves that the requirement was met?
- Both sides report the allowed trunk VLANs and clients communicate only in intended segments.
- Neighbor and interface checks agree on native VLAN and no untagged leakage occurs.
- Approval is recorded for 'Inspect root bridge IDs and STP port roles across the affected topology.' but no operational validation is performed.
- All switches report the intended root and appropriate designated or alternate roles.
Explanation
Correct Answer
D:All switches report the intended root and appropriate designated or alternate roles. It tests the intended outcome because root selection depends on bridge priority and mac when priorities tie.
Incorrect Answers
A:This observation is for a different condition: Two managed switches must carry VLANs 10, 20 and 40 over one inter-switch fiber link. It does not directly test the target outcome: A network wants to discover which switch became spanning-tree root after a maintenance change.
B:This test addresses a separate problem: A trunk between two switches forwards untagged frames into different native VLANs on each side.
C:The missing direct test is: All switches report the intended root and appropriate designated or alternate roles.
Question 268
The original case was: A network wants to discover which switch became spanning-tree root after a maintenance change. The requirement then changes: The root must move deliberately to a resilient distribution switch. Which revised action BEST meets this new condition?
- Set an appropriate STP root priority and test controlled convergence.
- All switches report the intended root and appropriate designated or alternate roles.
- Inspect root bridge IDs and STP port roles across the affected topology.
- Use a traceroute to determine Ethernet spanning-tree bridge priority.
Explanation
Correct Answer
A:Root placement is an engineering policy choice that must be verified. The revised requirement is: The root must move deliberately to a resilient distribution switch. The appropriate action is: Set an appropriate STP root priority and test controlled convergence.
Incorrect Answers
B:All switches report the intended root and appropriate designated or alternate roles. The current requirement is: The root must move deliberately to a resilient distribution switch.
C:This is the original control. Root selection depends on bridge priority and MAC when priorities tie. It does not directly satisfy the revised requirement: The root must move deliberately to a resilient distribution switch.
D:IP hop tracing does not identify layer-2 STP election details. It remains inappropriate in the revised context.
Question 269
Three adjacent 2.4GHz wireless APs overlap heavily and clients experience poor performance. Which action MOST directly meets the stated networking requirement?
- Deploy supported multiband APs with compatible SSIDs and appropriate 6GHz authentication settings.
- Plan nonoverlapping 2.4GHz channels and suitable transmit power after a site survey.
- Assign all neighboring APs overlapping channels at maximum power.
- Enable an approved 6GHz WLAN with supported security and channel planning.
Explanation
Correct Answer
B:Channel overlap and excess power increase co-channel or adjacent-channel contention. This specifically resolves: Three adjacent 2.4GHz wireless APs overlap heavily and clients experience poor performance.
Incorrect Answers
A:This addresses another problem in objective 2.3: An office needs newer clients to join 6GHz while preserving support for older 5GHz devices.
C:Excessive shared airtime and adjacent-channel energy can degrade throughput. The suggested approach is: Assign all neighboring APs overlapping channels at maximum power.
D:This action responds to a later condition: The office replaces most clients with 6GHz-compatible devices. 6GHz offers different spectrum and client-support constraints from 2.4GHz.
Question 270
Three adjacent 2.4GHz wireless APs overlap heavily and clients experience poor performance. A colleague instead suggests: Assign all neighboring APs overlapping channels at maximum power. Which finding MOST specifically explains why that suggestion is unsuitable?
- 6GHz offers different spectrum and client-support constraints from 2.4GHz.
- Clients without a 6GHz radio cannot associate on that band.
- Excessive shared airtime and adjacent-channel energy can degrade throughput.
- Channel overlap and excess power increase co-channel or adjacent-channel contention.
Explanation
Correct Answer
C:Excessive shared airtime and adjacent-channel energy can degrade throughput. This flaw directly concerns the proposed action: Assign all neighboring APs overlapping channels at maximum power.
Incorrect Answers
A:This rationale belongs to a later changed condition: The office replaces most clients with 6GHz-compatible devices.
B:This flaw concerns a different case in objective 2.3: An office needs newer clients to join 6GHz while preserving support for older 5GHz devices. The current rejected proposal is: Assign all neighboring APs overlapping channels at maximum power.
D:This explains why the recommended control works: Plan nonoverlapping 2.4GHz channels and suitable transmit power after a site survey.