  • Premium File 604 Questions & Answers. Last update: Nov 24, 2026
  • Training Course 106 Video Lectures
  • Study Guide 1255 Pages
 
$109.97
$79.99
accept 10 downloads in last 7 days
block-screenshots
Purchase Cisco 350-901 Exam Training Products Individually
Cisco 350-901 Premium File
Premium File 604 Q&A
$76.99$69.99
Cisco 350-901 Video Training Course
Training Course 106 Lectures
$21.99 $19.99
Cisco 350-901 PDF Study Guide
Study Guide 1255 Pages
$21.99 $19.99
Cisco 350-901 Practice Test 12

Question 110

An enterprise network automation team is given this requirement: An interface policy edit unexpectedly proposes destroying a shared controller object. Which specific implementation step is MOST appropriate? Select ONE answer.

  1. Attach services to a dedicated private Compose network
  2. Apply supported OSPF resource arguments and preserve unrelated process settings
  3. Inspect the resource replacement reason and stop until dependencies are reviewed
  4. Use the model-defined resource URL and authenticated GET

Explanation

Correct Answer

C:

Inspect the resource replacement reason and stop until dependencies are reviewed. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

Incorrect Answers

A:

That option concerns Docker Compose service networks and volumes in Infrastructure as Code. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

B:

Apply supported OSPF resource arguments and preserve unrelated process settings addresses the distinct network-automation topic of Ansible OSPF resource configuration in Network Automation. This case is controlled by: Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

D:

That option concerns RESTCONF base path and data-store semantics in Network Automation. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

Question 111

An enterprise network automation team is given this requirement: An interface policy edit unexpectedly proposes destroying a shared controller object. Which technical principle BEST justifies the approach? Select ONE answer.

  1. High-frequency broad subscriptions increase load and bandwidth, while too-sparse data loses evidence
  2. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift
  3. Simulation catches logic errors, but cannot guarantee identical physical network timing or ASIC behavior
  4. Technical correctness alone cannot justify applying a network change to an uncontrolled target set

Explanation

Correct Answer

B:

Plans describe proposed graph actions but must be evaluated for destructive replacements and drift is the most appropriate technical principle for this particular AUTOCOR v2.0 network-automation scenario: An interface policy edit unexpectedly proposes destroying a shared controller object. The governing design or operational principle is: Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

Incorrect Answers

A:

That option concerns Telemetry paths and sampling considerations in Operations. The tempting wrong assumption to avoid is: Automatically apply any plan that shows resource deletion without owner approval.

C:

That option concerns Network automation test double and simulation strategy in Network Automation. The tempting wrong assumption to avoid is: Automatically apply any plan that shows resource deletion without owner approval.

D:

That option concerns Network change scope blast-radius analysis in Network Automation. The tempting wrong assumption to avoid is: Automatically apply any plan that shows resource deletion without owner approval.

Question 112

An enterprise network automation team is given this requirement: An interface policy edit unexpectedly proposes destroying a shared controller object. Which observable outcome BEST confirms the intended result? Select ONE answer.

  1. Automation targets the correct existing node
  2. The next review identifies the specific changed VLAN
  3. The intended update succeeds without brute-force retries
  4. No unintended shared resource is deleted

Explanation

Correct Answer

D:

No unintended shared resource is deleted. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

Incorrect Answers

A:

Automation targets the correct existing node addresses the distinct network-automation topic of Network asset and source-of-truth synchronization in Network Automation. This case is controlled by: Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

B:

That option concerns Terraform drift and imported resources in Network Automation. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

C:

That option concerns Diagnosis from API HTTP logs and traces in Operations. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

Question 113

During a reviewed network automation change, engineers discover: A scheduled lab deployment produces an additive change for two new VLAN resources. Which decision should the team PRIORITIZE? Choose ONE best answer.

  1. Follow documented cursor or page links until all required inventory objects are retrieved
  2. Validate YAML shape, YANG-derived schemas, API contracts, and intended policy rules before device changes
  3. Review a Terraform plan and require explicit authorization before applying network state changes
  4. Package common network tasks as versioned roles and reference supported collections at explicit compatible releases

Explanation

Correct Answer

C:

Review a Terraform plan and require explicit authorization before applying network state changes. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

Incorrect Answers

A:

That option concerns REST API pagination and continuation in Network Automation. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

B:

That option would validate YAML shape, YANG-derived schemas, API contracts, and intended policy rules before device changes, but it addresses a different concern. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

D:

That option concerns Ansible roles and reusable collections in Network Automation. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

Question 114

During a reviewed network automation change, engineers discover: A scheduled lab deployment produces an additive change for two new VLAN resources. What is the BEST next technical step? Choose ONE best answer.

  1. Evaluate a supported IaC provider and state backend with lifecycle controls
  2. Weight costly false positive consequences during evaluation
  3. Store the plan as an immutable review artifact and apply only after approval
  4. Confirm port identity and apply disabled state only to that access port

Explanation

Correct Answer

C:

Store the plan as an immutable review artifact and apply only after approval. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

Incorrect Answers

A:

That option concerns Network automation framework selection tradeoffs in Network Automation. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

B:

Weight costly false positive consequences during evaluation addresses the distinct network-automation topic of AI recommendation scoring and false positive tests in AI in Automation. The preferred choice here is: Store the plan as an immutable review artifact and apply only after approval. This case is controlled by: Plans describe proposed graph actions but must be evaluated for destructive replacements and drift. A useful verification is: Applied state matches the reviewed intended resources.

D:

That option concerns Ansible interface administrative state in Network Automation. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

Question 115

During a reviewed network automation change, engineers discover: A scheduled lab deployment produces an additive change for two new VLAN resources. Which underlying concept MOST directly supports the decision? Choose ONE best answer.

  1. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift
  2. A successful code build does not authorize changes to critical network infrastructure
  3. Early input validation prevents malformed addresses or resource identifiers from entering network state
  4. Low-code does not eliminate security, testing, versioning or ownership requirements

Explanation

Correct Answer

A:

Plans describe proposed graph actions but must be evaluated for destructive replacements and drift is the most appropriate technical principle for this particular AUTOCOR v2.0 network-automation scenario: A scheduled lab deployment produces an additive change for two new VLAN resources. The governing design or operational principle is: Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

Incorrect Answers

B:

That option concerns GitLab manual gates and deployment rollback in Infrastructure as Code. The case-specific implementation to examine is: Store the plan as an immutable review artifact and apply only after approval.

C:

That option concerns Terraform variable typing and validation in Network Automation. The case-specific implementation to examine is: Store the plan as an immutable review artifact and apply only after approval.

D:

That option concerns Low-code automation approval and guardrails in Network Automation. The case-specific implementation to examine is: Store the plan as an immutable review artifact and apply only after approval.

Question 116

During a reviewed network automation change, engineers discover: A scheduled lab deployment produces an additive change for two new VLAN resources. Which verification evidence would BEST demonstrate success? Choose ONE best answer.

  1. Readback resolves the intended protocol identity
  2. Applied state matches the reviewed intended resources
  3. Critical business API actions continue without starvation
  4. No device is pushed to an unverified endpoint

Explanation

Correct Answer

B:

Applied state matches the reviewed intended resources. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

Incorrect Answers

A:

That option concerns YANG identityref and enum value representation in Infrastructure as Code. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

C:

That option concerns REST API rate limiting and backoff in Network Automation. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

D:

No device is pushed to an unverified endpoint addresses the distinct network-automation topic of Network asset and source-of-truth synchronization in Network Automation. This case is controlled by: Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

Question 117

An operations and automation project faces this situation: A team tries to apply an earlier saved plan after the state was changed by another job. What is the MOST defensible engineering approach? Choose ONE answer.

  1. Minimize exposed auth headers, redact sensitive payloads and ensure verified TLS for automation calls
  2. Review a Terraform plan and require explicit authorization before applying network state changes
  3. Express resource references and explicit dependencies when underlying API operations require ordering
  4. Manage OSPF process and interface intent using supported vendor collection modules and validate neighbors after change

Explanation

Correct Answer

B:

Review a Terraform plan and require explicit authorization before applying network state changes. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

Incorrect Answers

A:

That option concerns Security of API tokens and TLS logging in Operations. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

C:

Express resource references and explicit dependencies when underlying API operations require ordering addresses the distinct network-automation topic of Terraform resource dependencies and graph in Network Automation. This case is controlled by: Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

D:

Manage OSPF process and interface intent using supported vendor collection modules and validate neighbors after change addresses the distinct network-automation topic of Ansible OSPF resource configuration in Network Automation. This case is controlled by: Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

Question 118

An operations and automation project faces this situation: A team tries to apply an earlier saved plan after the state was changed by another job. Which concrete action would BEST address this case? Choose ONE answer.

  1. Regenerate or invalidate stale plan under state locking rules
  2. Compare gathered facts and diff to the inventory record before approval
  3. Record partial application and run approved rollback or reconciliation
  4. Evaluate retention and access controls under policy before enabling it

Explanation

Correct Answer

A:

Regenerate or invalidate stale plan under state locking rules. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

Incorrect Answers

B:

That option concerns Ansible check mode and diff review in Network Automation. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

C:

That option concerns RESTCONF safe configuration updates and rollback in Network Automation. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

D:

Evaluate retention and access controls under policy before enabling it addresses the distinct network-automation topic of AI data privacy and confidential network context in AI in Automation. The preferred choice here is: Regenerate or invalidate stale plan under state locking rules. This case is controlled by: Plans describe proposed graph actions but must be evaluated for destructive replacements and drift. A useful verification is: Only a current reconciled plan can be applied.

Question 119

An operations and automation project faces this situation: A team tries to apply an earlier saved plan after the state was changed by another job. Why is the preferred approach technically justified? Choose ONE answer.

  1. Ansible network plugins define how commands reach devices, while secure variables supply authentication separately
  2. Technical correctness alone cannot justify applying a network change to an uncontrolled target set
  3. A valid JSON or YAML document must encode values according to the YANG data type, not just human labels
  4. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift

Explanation

Correct Answer

D:

Confirm the result against this expected evidence: Only a current reconciled plan can be applied.

Incorrect Answers

A:

That option concerns Ansible network connection and authentication in Network Automation. Confirm the result against this expected evidence: Only a current reconciled plan can be applied.

B:

That option concerns Network change scope blast-radius analysis in Network Automation. Confirm the result against this expected evidence: Only a current reconciled plan can be applied.

C:

That option concerns YANG identityref and enum value representation in Infrastructure as Code. Confirm the result against this expected evidence: Only a current reconciled plan can be applied.

Question 120

An operations and automation project faces this situation: A team tries to apply an earlier saved plan after the state was changed by another job. Which measurable result BEST verifies the approach? Choose ONE answer.

  1. No live production mutation occurs in tests
  2. The report identifies the missing approved permission
  3. Plans retain the same intended dependency relationships
  4. Only a current reconciled plan can be applied

Explanation

Correct Answer

D:

Only a current reconciled plan can be applied. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

Incorrect Answers

A:

That option concerns Network change execution environment isolation in Operations. Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.

B:

The report identifies the missing approved permission addresses the distinct network-automation topic of REST API safe error handling and response codes in Network Automation. The preferred choice here is: Only a current reconciled plan can be applied. This case is controlled by: Plans describe proposed graph actions but must be evaluated for destructive replacements and drift. A useful verification is: Only a current reconciled plan can be applied.

C:

Plans retain the same intended dependency relationships addresses the distinct network-automation topic of Terraform resource dependencies and graph in Network Automation. This case is controlled by: Plans describe proposed graph actions but must be evaluated for destructive replacements and drift.