cert
cert-1
cert-2

Pass Amazon AWS Certified Data Engineer - Associate DEA-C01 Exam in First Attempt Guaranteed!

Get 100% Latest Exam Questions, Accurate & Verified Answers to Pass the Actual Exam!
30 Days Free Updates, Instant Download!

cert-5
cert-6
AWS Certified Data Engineer - Associate DEA-C01 Exam - Verified By Experts
AWS Certified Data Engineer - Associate DEA-C01 Premium Bundle
$29.98

AWS Certified Data Engineer - Associate DEA-C01 Premium Bundle

$79.99
$109.97
  • Premium File 366 Questions & Answers. Last update: Nov 13, 2026
  • Training Course 273 Video Lectures
  • Study Guide 809 Pages
 
$109.97
$79.99
accept 50 downloads in last 7 days
block-screenshots
Purchase Amazon AWS Certified Data Engineer - Associate DEA-C01 Exam Training Products Individually
Amazon AWS Certified Data Engineer - Associate DEA-C01 Premium File
Premium File 366 Q&A
$76.99$69.99
Amazon AWS Certified Data Engineer - Associate DEA-C01 Video Training Course
Training Course 273 Lectures
$21.99 $19.99
Amazon AWS Certified Data Engineer - Associate DEA-C01 PDF Study Guide
Study Guide 809 Pages
$21.99 $19.99
Amazon AWS Certified Data Engineer - Associate DEA-C01 Practice Test 32

Question 310

A Glue crawler must complete schema discovery before the ETL transformation reads the new table. An incorrect proposal is: Assume creating two jobs with similar names creates a dependency automatically. What operational defect would the misguided change introduce?

  1. The dashboard theme independently caused an unrelated source database failure.
  2. Reading a healthy CloudWatch log automatically erased every earlier record.
  3. A correctly encrypted S3 test object was the sole cause of an unrelated ISP outage.
  4. Launching ETL when schema discovery is still running can read stale or missing catalog metadata.

Explanation

Correct Answer

D:

The safer implementation is to use AWS Glue workflows and scheduled or conditional triggers to link crawlers and jobs with explicit completion conditions. This is why the incorrect shortcut does not meet Glue workflows triggers and crawlers.

Incorrect Answers

A:

That unrelated assertion does not explain the actual Glue workflows triggers and crawlers risk. The relevant failure is that launching ETL when schema discovery is still running can read stale or missing catalog metadata.

B:

That unrelated assertion does not explain the actual Glue workflows triggers and crawlers risk. Check glue workflow run, trigger state, crawler completion, job run and catalog table readiness.

C:

That unrelated assertion does not explain the actual Glue workflows triggers and crawlers risk.

Question 311

A Glue crawler must complete schema discovery before the ETL transformation reads the new table. The observed failure is: Launching ETL when schema discovery is still running can read stale or missing catalog metadata. What focused remediation preserves the intended data contract?

  1. Run both crawler and transformation at the same timestamp and claim completion order.
  2. Repair trigger predicates and prove correct crawler-to-job ordering with a test partition.
  3. Disable workflow history when a trigger remains inactive.
  4. Assume creating two jobs with similar names creates a dependency automatically.

Explanation

Correct Answer

B:

This addresses the observed Glue workflows triggers and crawlers failure while preserving the required contract. Glue workflow triggers coordinate Glue-native jobs and crawlers based on defined events and states.

Incorrect Answers

A:

Run both crawler and transformation at the same timestamp and claim completion order. Launching ETL when schema discovery is still running can read stale or missing catalog metadata. Instead repair trigger predicates and prove correct crawler-to-job ordering with a test partition.

C:

Disable workflow history when a trigger remains inactive. Launching ETL when schema discovery is still running can read stale or missing catalog metadata. Instead repair trigger predicates and prove correct crawler-to-job ordering with a test partition.

D:

Assume creating two jobs with similar names creates a dependency automatically. Launching ETL when schema discovery is still running can read stale or missing catalog metadata. Instead repair trigger predicates and prove correct crawler-to-job ordering with a test partition.

Question 312

A conditional Glue workflow trigger never fires because a prerequisite job does not transition to expected status. What architecture action addresses the stated source-to-target behavior?

  1. In this operational case, run both crawler and transformation at the same timestamp and claim completion order.
  2. In this operational case, disable workflow history when a trigger remains inactive.
  3. In this operational case, use AWS Glue workflows and scheduled or conditional triggers to link crawlers and jobs with explicit completion conditions.
  4. In this operational case, assume creating two jobs with similar names creates a dependency automatically.

Explanation

Correct Answer

C:

Validate with glue workflow run, trigger state, crawler completion, job run and catalog table readiness.

Incorrect Answers

A:

Run both crawler and transformation at the same timestamp and claim completion order. Glue workflow triggers coordinate Glue-native jobs and crawlers based on defined events and states. Inspect glue workflow run, trigger state, crawler completion, job run and catalog table readiness.

B:

Launching ETL when schema discovery is still running can read stale or missing catalog metadata.

D:

Launching ETL when schema discovery is still running can read stale or missing catalog metadata. The supported design is to use AWS Glue workflows and scheduled or conditional triggers to link crawlers and jobs with explicit completion conditions.

Question 313

A conditional Glue workflow trigger never fires because a prerequisite job does not transition to expected status. What validation evidence distinguishes a correct implementation from a dashboard-only change?

  1. The relevant validation evidence is a renamed resource label that does not show an authorization or processing result.
  2. The relevant validation evidence is glue workflow run, trigger state, crawler completion, job run and catalog table readiness.
  3. The relevant validation evidence is a successful ping to an unrelated service that did not process the data.
  4. The relevant validation evidence is an old architecture drawing without the current query plan or job-run identifier.

Explanation

Correct Answer

B:

These observations directly test Glue workflows triggers and crawlers. In this specific operating situation, a conditional Glue workflow trigger never fires because a prerequisite job does not transition to expected status.

Incorrect Answers

A:

A renamed resource label that does not show an authorization or processing result. This is not sufficient evidence for Glue workflows triggers and crawlers. Check glue workflow run, trigger state, crawler completion, job run and catalog table readiness. Glue workflow triggers coordinate Glue-native jobs and crawlers based on defined events and states.

C:

A successful ping to an unrelated service that did not process the data. This is not sufficient evidence for Glue workflows triggers and crawlers. Check glue workflow run, trigger state, crawler completion, job run and catalog table readiness. Glue workflow triggers coordinate Glue-native jobs and crawlers based on defined events and states.

D:

An old architecture drawing without the current query plan or job-run identifier. This is not sufficient evidence for Glue workflows triggers and crawlers. Check glue workflow run, trigger state, crawler completion, job run and catalog table readiness. Glue workflow triggers coordinate Glue-native jobs and crawlers based on defined events and states.

Question 314

A conditional Glue workflow trigger never fires because a prerequisite job does not transition to expected status. Which design principle is consistent with the stated data-processing contract?

  1. The governing design principle is that glue workflow triggers coordinate Glue-native jobs and crawlers based on defined events and states.
  2. The governing design principle is that a successful IAM login means every analytics dataset is readable and correctly transformed.
  3. The governing design principle is that increasing a resource name length automatically increases AWS service throughput.
  4. The governing design principle is that a pipeline schedule guarantees that every downstream source record was processed correctly.

Explanation

Correct Answer

A:

Implement by choosing to use AWS Glue workflows and scheduled or conditional triggers to link crawlers and jobs with explicit completion conditions. Verify with glue workflow run, trigger state, crawler completion, job run and catalog table readiness.

Incorrect Answers

B:

A successful IAM login means every analytics dataset is readable and correctly transformed. That generalization conflicts with Glue workflows triggers and crawlers. Instead glue workflow triggers coordinate Glue-native jobs and crawlers based on defined events and states. Check glue workflow run, trigger state, crawler completion, job run and catalog table readiness.

C:

Increasing a resource name length automatically increases AWS service throughput. That generalization conflicts with Glue workflows triggers and crawlers. Instead glue workflow triggers coordinate Glue-native jobs and crawlers based on defined events and states. Check glue workflow run, trigger state, crawler completion, job run and catalog table readiness.

D:

A pipeline schedule guarantees that every downstream source record was processed correctly. That generalization conflicts with Glue workflows triggers and crawlers. Instead glue workflow triggers coordinate Glue-native jobs and crawlers based on defined events and states. Check glue workflow run, trigger state, crawler completion, job run and catalog table readiness.

Question 315

A conditional Glue workflow trigger never fires because a prerequisite job does not transition to expected status. An incorrect proposal is: Assume creating two jobs with similar names creates a dependency automatically. What issue should reviewers anticipate if the shortcut is adopted?

  1. The concrete failure is that a correctly encrypted S3 test object was the sole cause of an unrelated ISP outage.
  2. The concrete failure is that a harmless resource display-name edit caused all prior ETL jobs to lose their source schemas.
  3. The concrete failure is that launching ETL when schema discovery is still running can read stale or missing catalog metadata.
  4. The concrete failure is that reading a healthy CloudWatch log automatically erased every earlier record.

Explanation

Correct Answer

C:

The safer implementation is to use AWS Glue workflows and scheduled or conditional triggers to link crawlers and jobs with explicit completion conditions. Glue workflow triggers coordinate Glue-native jobs and crawlers based on defined events and states.

Incorrect Answers

A:

That unrelated assertion does not explain the actual Glue workflows triggers and crawlers risk.

B:

That unrelated assertion does not explain the actual Glue workflows triggers and crawlers risk. A harmless resource display-name edit caused all prior ETL jobs to lose their source schemas.

D:

That unrelated assertion does not explain the actual Glue workflows triggers and crawlers risk. Reading a healthy CloudWatch log automatically erased every earlier record.

Question 316

A conditional Glue workflow trigger never fires because a prerequisite job does not transition to expected status. The observed failure is: Launching ETL when schema discovery is still running can read stale or missing catalog metadata. Which response repairs the underlying problem without unnecessary privilege or data loss?

  1. The supported recovery step is to disable workflow history when a trigger remains inactive.
  2. The supported recovery step is to repair trigger predicates and prove correct crawler-to-job ordering with a test partition.
  3. The supported recovery step is to assume creating two jobs with similar names creates a dependency automatically.
  4. The supported recovery step is to run both crawler and transformation at the same timestamp and claim completion order.

Explanation

Correct Answer

B:

This addresses the observed Glue workflows triggers and crawlers failure while preserving the required contract. Recheck glue workflow run, trigger state, crawler completion, job run and catalog table readiness.

Incorrect Answers

A:

Disable workflow history when a trigger remains inactive. Launching ETL when schema discovery is still running can read stale or missing catalog metadata. Instead repair trigger predicates and prove correct crawler-to-job ordering with a test partition.

C:

Assume creating two jobs with similar names creates a dependency automatically. Launching ETL when schema discovery is still running can read stale or missing catalog metadata. Instead repair trigger predicates and prove correct crawler-to-job ordering with a test partition.

D:

Run both crawler and transformation at the same timestamp and claim completion order. Launching ETL when schema discovery is still running can read stale or missing catalog metadata. Instead repair trigger predicates and prove correct crawler-to-job ordering with a test partition.

Question 317

A conditional Glue workflow trigger never fires because a prerequisite job does not transition to expected status. The proposed implementation needs explicit operational validation. How should the architecture review approve and test the scoped solution?

  1. The reviewed plan is to assume creating two jobs with similar names creates a dependency automatically; treat a resource name as sufficient evidence.
  2. The reviewed plan is to run both crawler and transformation at the same timestamp and claim completion order; omit the source-to-target verification.
  3. The reviewed plan is to use AWS Glue workflows and scheduled or conditional triggers to link crawlers and jobs with explicit completion conditions; validate with glue workflow run, trigger state, crawler completion, job run and catalog table readiness.
  4. The reviewed plan is to disable workflow history when a trigger remains inactive; do not check the failure conditions.

Explanation

Correct Answer

C:

The change-review requirement is satisfied only when evidence is checked: Glue workflow run, trigger state, crawler completion, job run and catalog table readiness.

Incorrect Answers

A:

Launching ETL when schema discovery is still running can read stale or missing catalog metadata. A resource label is not proof of Glue workflows triggers and crawlers.

B:

Run both crawler and transformation at the same timestamp and claim completion order. Omitting output verification can conceal failure. Glue workflow triggers coordinate Glue-native jobs and crawlers based on defined events and states. The accepted action is to use AWS Glue workflows and scheduled or conditional triggers to link crawlers and jobs with explicit completion conditions.

D:

Launching ETL when schema discovery is still running can read stale or missing catalog metadata. Verify with glue workflow run, trigger state, crawler completion, job run and catalog table readiness.

Question 318

An extraction must run each business day with a specified time zone and retry handling. What architecture action addresses the stated source-to-target behavior?

  1. Assume cron expressions always use the operator's browser-local timezone.
  2. Delete target idempotency checks because EventBridge is managed.
  3. Use EventBridge Scheduler with appropriate schedule expression, time zone, retry policy and idempotent target.
  4. Schedule duplicate targets to improve exactly-once semantics.

Explanation

Correct Answer

C:

Use EventBridge Scheduler with appropriate schedule expression, time zone, retry policy and idempotent target. This directly addresses EventBridge Scheduler time-based ingestion. Time-based event delivery and the processing job are separate stages; delivery may retry. Validate with schedule expression, timezone, invocation attempts, target execution ID and processed-business-day ledger.

Incorrect Answers

A:

Assuming a scheduler never invokes a target more than once can duplicate daily partitions. The supported design is to use EventBridge Scheduler with appropriate schedule expression, time zone, retry policy and idempotent target.

B:

Delete target idempotency checks because EventBridge is managed. Time-based event delivery and the processing job are separate stages; delivery may retry. Inspect schedule expression, timezone, invocation attempts, target execution ID and processed-business-day ledger.

D:

Assuming a scheduler never invokes a target more than once can duplicate daily partitions. The appropriate action is to use EventBridge Scheduler with appropriate schedule expression, time zone, retry policy and idempotent target.

Question 319

An extraction must run each business day with a specified time zone and retry handling. What validation evidence distinguishes a correct implementation from a dashboard-only change?

  1. A renamed resource label that does not show an authorization or processing result.
  2. A browser screenshot from another AWS account and time period.
  3. Schedule expression, timezone, invocation attempts, target execution ID and processed-business-day ledger.
  4. An old architecture drawing without the current query plan or job-run identifier.

Explanation

Correct Answer

C:

Schedule expression, timezone, invocation attempts, target execution ID and processed-business-day ledger. These observations directly test EventBridge Scheduler time-based ingestion. Time-based event delivery and the processing job are separate stages; delivery may retry.

Incorrect Answers

A:

A renamed resource label that does not show an authorization or processing result. This is not sufficient evidence for EventBridge Scheduler time-based ingestion. Check schedule expression, timezone, invocation attempts, target execution ID and processed-business-day ledger. Time-based event delivery and the processing job are separate stages; delivery may retry.

B:

A browser screenshot from another AWS account and time period. This is not sufficient evidence for EventBridge Scheduler time-based ingestion. Check schedule expression, timezone, invocation attempts, target execution ID and processed-business-day ledger. Time-based event delivery and the processing job are separate stages; delivery may retry.

D:

An old architecture drawing without the current query plan or job-run identifier. This is not sufficient evidence for EventBridge Scheduler time-based ingestion. Check schedule expression, timezone, invocation attempts, target execution ID and processed-business-day ledger. Time-based event delivery and the processing job are separate stages; delivery may retry.

Question 320

An extraction must run each business day with a specified time zone and retry handling. Which design principle is consistent with the stated data-processing contract?

  1. Time-based event delivery and the processing job are separate stages; delivery may retry.
  2. A CloudWatch metric label is equivalent to a successful target table data-quality validation.
  3. Increasing a resource name length automatically increases AWS service throughput.
  4. A pipeline schedule guarantees that every downstream source record was processed correctly.

Explanation

Correct Answer

A:

Implement by choosing to use EventBridge Scheduler with appropriate schedule expression, time zone, retry policy and idempotent target. This is the relevant technical mechanism for EventBridge Scheduler time-based ingestion.

Incorrect Answers

B:

A CloudWatch metric label is equivalent to a successful target table data-quality validation. That generalization conflicts with EventBridge Scheduler time-based ingestion. Instead time-based event delivery and the processing job are separate stages; delivery may retry. Check schedule expression, timezone, invocation attempts, target execution ID and processed-business-day ledger.

C:

Increasing a resource name length automatically increases AWS service throughput. That generalization conflicts with EventBridge Scheduler time-based ingestion. Instead time-based event delivery and the processing job are separate stages; delivery may retry. Check schedule expression, timezone, invocation attempts, target execution ID and processed-business-day ledger.

D:

A pipeline schedule guarantees that every downstream source record was processed correctly. That generalization conflicts with EventBridge Scheduler time-based ingestion. Instead time-based event delivery and the processing job are separate stages; delivery may retry. Check schedule expression, timezone, invocation attempts, target execution ID and processed-business-day ledger.

AWS Certified Data Engineer - Associate DEA-C01 Practice Tests