HP HPE6-A86 Practice Test 42
Question 410
Which targeted correction is justified for this campus switching scenario? A new routed department VLAN cannot obtain DHCP leases from the remote authorized server because its gateway does not relay broadcasts.
- Follow supported VSF member numbering, compatible software and stacking-cable preparation.
- Configure the supported DHCP relay/helper function at the correct L3 gateway and review network security.
- Keep read-only access for observation and have an authorized admin make logged configuration changes.
- Enable only the intended interface and verify link and access policy before restoring server traffic.
Explanation
Correct Answer
B:Configure the supported DHCP relay/helper function at the correct L3 gateway and review network security. DHCP discover broadcasts need an authorized relay across a routed boundary. Verified result: Hosts receive the intended scope leases while rogue DHCP sources remain blocked.
Incorrect Answers
A:This change serves a different network condition (An installer adds a replacement switch to a VSF stack but assigns a duplicate member ID and leaves mixed software versions.), not the issue described. Appropriate response here: Configure the supported DHCP relay/helper function at the correct L3 gateway and review network security.
C:This change serves a different network condition (An installer creates an operator account for a night-shift technician, but the technician attempts to modify port VLANs with insufficient role permissions.), not the issue described. Appropriate response here: Configure the supported DHCP relay/helper function at the correct L3 gateway and review network security.
D:This change serves a different network condition (A new server-facing switchport remains administratively disabled after an approved cable move even though the transceiver is detected.), not the issue described. Appropriate response here: Configure the supported DHCP relay/helper function at the correct L3 gateway and review network security.
Question 411
An HPE Aruba Networking switch operator observes this condition: Two access switches are linked by a second unplanned Ethernet cable and broadcast traffic begins multiplying across the building. What action BEST addresses the fault?
- Find the unauthorized ARP responder and restore the expected gateway ownership and Layer 2 segmentation.
- Distinguish TCP reliability and congestion behavior from UDP application-specific delivery, then adjust the actual bottleneck.
- Enable and verify a correct spanning-tree design and remove or intentionally aggregate unintended redundant links.
- Correct the host gateway or prefix according to the actual /26 network boundaries and route between subnets if required.
Explanation
Correct Answer
C:Enable and verify a correct spanning-tree design and remove or intentionally aggregate unintended redundant links. STP/RSTP prevent forwarding loops by selecting a spanning tree across redundant Layer 2 links. Verified result: A stable loop-free logical topology forms and broadcast counters return toward baseline.
Incorrect Answers
A:This change serves a different network condition (A server has correct IP and gateway addressing but its ARP cache repeatedly learns the wrong gateway MAC after a test device was connected.), not the issue described. Appropriate response here: Enable and verify a correct spanning-tree design and remove or intentionally aggregate unintended redundant links.
B:This change serves a different network condition (A file copy over a congested WAN shows retransmissions and out-of-order segments, while UDP voice media reports loss without recovery.), not the issue described.
D:This change serves a different network condition (A switch SVI is configured as 192.0.2.126/26 while a new host uses 192.0.2.130/26 and expects same-subnet ARP.), not the issue described. Appropriate response here: Enable and verify a correct spanning-tree design and remove or intentionally aggregate unintended redundant links.
Question 412
What mistaken approach is MOST likely to worsen this networking fault? A network architect wants troubleshooting access during a data-VLAN outage but locates all switch management behind the same failed user trunk.
- Call a management VLAN carried over the failed trunk physically independent out-of-band access.
- Verify port VLAN membership with operational state rather than ticket labels.
- Verify the correct device and port before changing production configuration.
- Test both allowed and denied network paths after access-control changes.
Explanation
Correct Answer
A:Call a management VLAN carried over the failed trunk physically independent out-of-band access. Out-of-band management separates control access from production forwarding dependencies. Safer action: Provide an independently reachable and appropriately secured out-of-band management path when required by resilience goals.
Incorrect Answers
B:Verify port VLAN membership with operational state rather than ticket labels. Actual forwarding can differ from intended configuration. For the stated issue, the appropriate action is: Provide an independently reachable and appropriately secured out-of-band management path when required by resilience goals.
C:Verify the correct device and port before changing production configuration. Accurate change scoping prevents unintended service disruption. For the stated issue, the appropriate action is: Provide an independently reachable and appropriately secured out-of-band management path when required by resilience goals.
D:Test both allowed and denied network paths after access-control changes. Negative tests confirm unauthorized paths remain restricted. For the stated issue, the appropriate action is: Provide an independently reachable and appropriately secured out-of-band management path when required by resilience goals.
Question 413
Identify the unsafe shortcut to REJECT for the following campus switching situation: A contractor attaches an unmanaged switch to an edge port and creates a loop after the port was configured as unprotected edge.
- Enable BPDU guard on core switch-to-switch trunks without reviewing legitimate BPDUs.
- Use current platform release documentation for model-specific features.
- Verify HPE Aruba Central enrollment and group assignment after provisioning.
- Verify the correct device and port before changing production configuration.
Explanation
Correct Answer
A:Edge ports are intended for end devices; BPDU guard helps prevent an unexpected bridge from creating loops.
Incorrect Answers
B:Use current platform release documentation for model-specific features. Hardware and AOS-CX capabilities vary across series and versions. For the stated issue, the appropriate action is: Apply supported BPDU protection on appropriate edge ports and review the contractor cabling policy.
C:Verify HPE Aruba Central enrollment and group assignment after provisioning. Managed inventory and applied templates determine operational state. For the stated issue, the appropriate action is: Apply supported BPDU protection on appropriate edge ports and review the contractor cabling policy.
D:Verify the correct device and port before changing production configuration. Accurate change scoping prevents unintended service disruption. For the stated issue, the appropriate action is: Apply supported BPDU protection on appropriate edge ports and review the contractor cabling policy.
Question 414
Which proposed action would be LEAST defensible for this AOS-CX or network problem? A support VLAN can reach same-VLAN hosts but not a management VLAN even though both VLANs are allowed on the uplink.
- Add the management VLAN to the allowed trunk list and assume this alone implements subnet routing.
- Verify port VLAN membership with operational state rather than ticket labels.
- Retain authorized management access during maintenance.
- Verify the correct device and port before changing production configuration.
Explanation
Correct Answer
A:VLAN trunk allowance permits Layer 2 carriage but does not itself create a Layer 3 path between subnets.
Incorrect Answers
B:Verify port VLAN membership with operational state rather than ticket labels. Actual forwarding can differ from intended configuration. For the stated issue, the appropriate action is: Provide appropriately scoped Layer 3 gateways, routing and security policy between the two VLANs.
C:Retain authorized management access during maintenance. Management availability supports recovery and accountability. For the stated issue, the appropriate action is: Provide appropriately scoped Layer 3 gateways, routing and security policy between the two VLANs.
D:Verify the correct device and port before changing production configuration. Accurate change scoping prevents unintended service disruption. For the stated issue, the appropriate action is: Provide appropriately scoped Layer 3 gateways, routing and security policy between the two VLANs.
Question 415
Identify the unsafe shortcut to REJECT for the following campus switching situation: A newly provisioned switch can ping its own loopback IP but not the default gateway, yet an operator calls the uplink healthy.
- Restrict monitoring permissions to the required data access.
- Verify port VLAN membership with operational state rather than ticket labels.
- Inspect the source management VRF when a switch-origin probe fails.
- Submit only a loopback ping result as proof a fiber uplink is connected.
Explanation
Correct Answer
D:Safer action: Progress to physical and next-hop ARP checks rather than treat a local loopback reply as network reachability.
Incorrect Answers
A:Restrict monitoring permissions to the required data access. Read-only telemetry rarely needs broad configuration privileges. For the stated issue, the appropriate action is: Progress to physical and next-hop ARP checks rather than treat a local loopback reply as network reachability.
B:Verify port VLAN membership with operational state rather than ticket labels. Actual forwarding can differ from intended configuration. For the stated issue, the appropriate action is: Progress to physical and next-hop ARP checks rather than treat a local loopback reply as network reachability.
C:Inspect the source management VRF when a switch-origin probe fails. Control-plane routes can differ from client forwarding paths. For the stated issue, the appropriate action is: Progress to physical and next-hop ARP checks rather than treat a local loopback reply as network reachability.
Question 416
Which TWO claims link a supported response and validation for this wired switching scenario? A new uplink is physically patched into port 1/1/48 but the running configuration still describes it as a decommissioned printer.
- Action: Replace generic credentials with unique managed administrative identities and supported AAA or role controls.
- Verification: Each instance has planned root and forwarding roles while VLANs remain reachable.
- Action: Update the interface description and asset/cable record while validating actual operational connection.
- Unsafe shortcut: Assume renaming an interface description changes what physical device is attached.
- Verification: Topology inventory matches physical cable endpoints and operations can identify the uplink correctly.
Explanation
Correct Answers
C:Action: Update the interface description and asset/cable record while validating actual operational connection. Documented interface descriptions aid operations but do not replace actual port discovery and verification.
E:Verification: Topology inventory matches physical cable endpoints and operations can identify the uplink correctly. Documented interface descriptions aid operations but do not replace actual port discovery and verification.
Incorrect Answers
A:This remedy fits a different fault (A new switch uses an administrative identity that all branch installers know, and the same password is reused on every device.). For this case use: Update the interface description and asset/cable record while validating actual operational connection.
B:This is validation for another condition (A two-building deployment wants separate spanning-tree paths for user and voice VLANs but maps all VLANs into one MST instance.).
D:Documented interface descriptions aid operations but do not replace actual port discovery and verification.
Question 417
Which targeted correction is justified for this campus switching scenario? A distribution design expects switch A to be root but a technician reads only port LEDs and cannot explain the blocked uplink.
- Use LLDP neighbor detail and interface counters to verify the active connected peer and port.
- Ensure the management VLAN interface is properly enabled and associated with a viable Layer 2 path and route.
- Use show lacp interfaces and show lag to compare member synchronization and physical error state.
- Use show spanning-tree instance and bridge information to identify the elected root and port states.
Explanation
Correct Answer
D:Use show spanning-tree instance and bridge information to identify the elected root and port states. STP state is established by protocol election and port-role decisions that are visible in diagnostic output. Verified result: The correct root bridge and designated/alternate roles match the approved loop-free topology.
Incorrect Answers
A:This change serves a different network condition (A campus closet's uplink documentation lists switch B on port 1/1/48 while cables were moved to port 1/1/47.), not the issue described. Appropriate response here: Use show spanning-tree instance and bridge information to identify the elected root and port states.
B:This change serves a different network condition (An installer puts a new in-band management IP on a VLAN SVI that has no active member port and then cannot reach it.), not the issue described. Appropriate response here: Use show spanning-tree instance and bridge information to identify the elected root and port states.
C:This change serves a different network condition (A two-member uplink LAG carries traffic but half the expected capacity is missing and only one physical member is active.), not the issue described.
Question 418
Which evidence should be examined FIRST to localize this switch-related fault? A monitoring dashboard shows zero transmitted packets from one uplink although users still transfer files and SNMP poll timestamps have stopped.
- Compare last poll time, SNMP errors, CLI port counters and actual service traffic.
- Inspect source interface, target policy, intermediate traceroute and TCP service test.
- Inspect member rate/duplex, transceiver types, LACP flags and interface errors.
- Inspect ipconfig/route, DHCP option3, SVI address and first-hop traceroute.
Explanation
Correct Answer
A:Compare last poll time, SNMP errors, CLI port counters and actual service traffic. Missing monitoring data is not equivalent to a measured zero or an actual interface outage. Next step: Validate telemetry freshness and compare live CLI counters before declaring the physical link down.
Incorrect Answers
B:This diagnostic addresses another network condition (A network engineer uses ping to a remote server and receives no reply, then immediately asserts the local switch is faulty.). Here inspect: Compare last poll time, SNMP errors, CLI port counters and actual service traffic.
C:Inspect member rate/duplex, transceiver types, LACP flags and interface errors. This diagnostic addresses another network condition (Two ports intended for a LAG operate at different negotiated speeds after an optic replacement and aggregation health degrades.). Here inspect: Compare last poll time, SNMP errors, CLI port counters and actual service traffic.
D:This diagnostic addresses another network condition (A subnet's PCs can ping each other but never reach the building printer subnet after a DHCP option points them at an old gateway.). Here inspect: Compare last poll time, SNMP errors, CLI port counters and actual service traffic.
Question 419
A wired network administrator encounters: A regional core requires numerous line cards and high-density redundant power, but a fixed 24-port access model is proposed. Which configuration or response is MOST appropriate?
- Correct group/template assignment using approved model-specific configuration and stage the change.
- Evaluate modular switching platforms with documented redundancy and line-card expansion as required by the core design.
- Choose approved multi-gig capable access ports and adequate uplink speed for required devices.
- Select a switch with supported redundant power capacity and independent suitable AC distribution.
Explanation
Correct Answer
B:Evaluate modular switching platforms with documented redundancy and line-card expansion as required by the core design. Fixed access and modular chassis designs address different expansion, performance and operational requirements. Verified result: The selected platform meets slot, throughput and power resiliency requirements with a validated growth plan.
Incorrect Answers
A:This change serves a different network condition (A set of branch switches joins cloud management but receives an inappropriate template due to assignment to the wrong device group.), not the issue described. Appropriate response here: Evaluate modular switching platforms with documented redundancy and line-card expansion as required by the core design.
C:This change serves a different network condition (A high-density access site requires 2.5-Gb/s access for Wi-Fi uplinks but selects a platform whose edge ports are gigabit-only.), not the issue described. Appropriate response here: Evaluate modular switching platforms with documented redundancy and line-card expansion as required by the core design.
D:This change serves a different network condition (A wiring closet must remain operational through one PSU failure but planners count two outlet sockets as redundant internal PSUs.), not the issue described. Appropriate response here: Evaluate modular switching platforms with documented redundancy and line-card expansion as required by the core design.
Question 420
What fundamental switching or routing concept is MOST relevant here? Network changes from different technicians all appear under one shared local admin account, preventing accountability after an outage.
- Administrative accountability requires uniquely attributable identity and protected activity records.
- Effective maintenance plans depend on monitoring checkpoints and clear decision thresholds, not only a change window.
- Lifecycle management must connect official advisories to actual deployed product versions and exposures.
- Network configuration archives are sensitive assets requiring access, confidentiality and lifecycle governance.
Explanation
Correct Answer
A:Administrative accountability requires uniquely attributable identity and protected activity records. Appropriate intervention: Use individual authorized identities and centralized or protected command/accounting logs.
Incorrect Answers
B:This concept applies to another switch problem (A quarterly upgrade plan has a start time but no explicit abort criteria if a routing adjacency fails after the first switch is updated.). Administrative accountability requires uniquely attributable identity and protected activity records.
C:This concept applies to another switch problem (An AOS-CX security notice names a vulnerable release, but the team lacks an inventory tying installed versions to affected devices.). Administrative accountability requires uniquely attributable identity and protected activity records.
D:This concept applies to another switch problem (Switch configuration archives contain read-only SNMP strings and local account hashes in a shared team folder.). Administrative accountability requires uniquely attributable identity and protected activity records.