cert
cert-1
cert-2

Pass Cisco 700-805 Exam in First Attempt Guaranteed!

Get 100% Latest Exam Questions, Accurate & Verified Answers to Pass the Actual Exam!
30 Days Free Updates, Instant Download!

cert-5
cert-6
700-805 Exam - Verified By Experts
700-805 Premium File

700-805 Premium File

$69.99
$76.99
  • Premium File 145 Questions & Answers. Last Update: Nov 15, 2026

Whats Included:

  • Latest Questions
  • 100% Accurate Answers
  • Fast Exam Updates
 
$76.99
$69.99
accept 10 downloads in the last 7 days
block-screenshots
Cisco 700-805 Practice Test 68

Question 670

At a cross-functional renewal checkpoint, Northstar Energy reports: management sees a high booking total but weak cash/renewal health. Risk diagnosis: Which piece of evidence would most directly support diagnosis of the specific blocker?

  1. Finance sees total contract recurring value but needs growth split
  2. One large multi-year deal inflates TCV while retention is flat
  3. Renewal forecast counts the full recurring amount as expansion
  4. The dashboard assigns all $240k to a single annual period

Explanation

Correct Answer

B:

This is the discriminating account evidence: One large multi-year deal inflates TCV while retention is flat. It directly supports the case description, while the suitable response is to interpret ARR, ACV, TCV, NRR and OTRR together rather than one metric. Check the underlying customer and contract records before committing the renewal.

Incorrect Answers

A:

This is meaningful in a different renewal investigation, but it does not establish the specific blocker in the prompt. The discriminating evidence is 'One large multi-year deal inflates TCV while retention is flat', not this unrelated symptom.

C:

This evidence points toward another case: a customer upgrades its annual recurring subscription from $80k to $100k. For the named account, the relevant observation is 'One large multi-year deal inflates TCV while retention is flat', which tests the issue described.

D:

That signal would help if a $240k subscription covers 24 months with level pricing. The present case instead calls for verifying 'One large multi-year deal inflates TCV while retention is flat' before choosing a remedy.

Question 671

During a subscription portfolio review, Northstar Energy reports: management sees a high booking total but weak cash/renewal health. Acceptance test: What is the strongest case-specific evidence that the remedy succeeded?

  1. Annualized amount is $120k, with TCV still $240k
  2. Reported ending ARR and expansion delta reconcile to the source
  3. Decision-makers can separate contract value, recurring base and timeliness
  4. Expansion delta and total ending ARR are reported separately

Explanation

Correct Answer

C:

This demonstrates a completed remedy: Decision-makers can separate contract value, recurring base and timeliness. It closes the loop from the observed issue through the action 'Interpret ARR, ACV, TCV, NRR and OTRR together rather than one metric' to an observable, accountable result; mere activity or an emailed proposal would not be enough.

Incorrect Answers

A:

That outcome can matter when a $240k subscription covers 24 months with level pricing, but it does not verify the remedy required by this case. The necessary acceptance evidence is 'Decision-makers can separate contract value, recurring base and timeliness'.

B:

The offered result tests another workstream and could give false confidence about the named obstacle. Successful closure here needs 'Decision-makers can separate contract value, recurring base and timeliness', tied to the account's actual risk.

D:

This measure would show improvement for a different situation: a customer upgrades its annual recurring subscription from $80k to $100k. It would not prove the main account's issue was corrected; check 'Decision-makers can separate contract value, recurring base and timeliness' instead.

Question 672

In the lead-up to a customer decision, Northstar Energy reports: management sees a high booking total but weak cash/renewal health. Long-term prevention: Which ongoing control would most directly reduce recurrence of this failure?

  1. Separate baseline retained ARR from growth in dashboards
  2. Document the time normalization when reporting ACV
  3. Reconcile renewal waterfall components in regular reporting
  4. Maintain a multi-metric dashboard with consistent definitions

Explanation

Correct Answer

D:

This control is matched to the known failure mode: Maintain a multi-metric dashboard with consistent definitions. Repeating this check catches the signal 'One large multi-year deal inflates TCV while retention is flat' earlier and makes the correct handoff or intervention reliable beyond a single deal.

Incorrect Answers

A:

That cadence controls a different process associated with a customer upgrades its annual recurring subscription from $80k to $100k. Preventing the described recurrence requires 'Maintain a multi-metric dashboard with consistent definitions'.

B:

While useful for a $240k subscription covers 24 months with level pricing, it would not consistently detect this case's signal. Establish 'Maintain a multi-metric dashboard with consistent definitions' instead.

C:

A generic control is not enough when the failure mode is specific. This option tracks another risk; the focused prevention step here is 'Maintain a multi-metric dashboard with consistent definitions'.

Question 673

At a cross-functional renewal checkpoint, Orion Energy reports: a partner repeatedly books renewals late and pays for emergency legal processing. Recommended response: What should the renewals manager or coordinating team do first?

  1. Quantify execution overhead and prioritize earlier renewal readiness
  2. Use more predictable renewal timing to support resources and cash planning
  3. Document the link between mature success practice and lower renewal servicing cost
  4. Test the net economics of expansion and ongoing service obligations

Explanation

Correct Answer

A:

This addresses the specific obstacle: a partner repeatedly books renewals late and pays for emergency legal processing. The supporting sign is that avoidable late-stage work is increasing cost per successful renewal. The action therefore targets the account's immediate renewal dependency rather than unrelated housekeeping.

Incorrect Answers

B:

That work would mainly address a different condition: the partner needs to explain why renewal forecasting matters to working capital. Here the observed problem is a partner repeatedly books renewals late and pays for emergency legal processing, requiring the targeted action 'Quantify execution overhead and prioritize earlier renewal readiness'.

C:

This is a plausible renewal task when the team spends less time on unplanned escalation after success reviews, but that is not the deciding fact given here. The direct remedy in this account is 'Quantify execution overhead and prioritize earlier renewal readiness'.

D:

The suggestion may support another customer facing a renewal program raises NRR but requires very costly custom support commitments; it leaves this account's specific blocker untouched. Use 'Quantify execution overhead and prioritize earlier renewal readiness' to address the documented signal.

Question 674

During a subscription portfolio review, Orion Energy reports: a partner repeatedly books renewals late and pays for emergency legal processing. Risk diagnosis: Which piece of evidence would most directly support diagnosis of the specific blocker?

  1. Expansion value is reported without the added support delivery cost
  2. Avoidable late-stage work is increasing cost per successful renewal
  3. Late bookings create revenue timing volatility and rush operating costs
  4. The team spends less time on unplanned escalation after success reviews

Explanation

Correct Answer

B:

This is the discriminating account evidence: Avoidable late-stage work is increasing cost per successful renewal. It directly supports the case description, while the suitable response is to quantify execution overhead and prioritize earlier renewal readiness. Check the underlying customer and contract records before committing the renewal.

Incorrect Answers

A:

This is meaningful in a different renewal investigation, but it does not establish the specific blocker in the prompt. The discriminating evidence is 'Avoidable late-stage work is increasing cost per successful renewal', not this unrelated symptom.

C:

This evidence points toward another case: the partner needs to explain why renewal forecasting matters to working capital. For the named account, the relevant observation is 'Avoidable late-stage work is increasing cost per successful renewal', which tests the issue described.

D:

That signal would help if a partner improves adoption evidence and reduces last-minute renewal rescue work. The present case instead calls for verifying 'Avoidable late-stage work is increasing cost per successful renewal' before choosing a remedy.

Question 675

In the lead-up to a customer decision, Orion Energy reports: a partner repeatedly books renewals late and pays for emergency legal processing. Acceptance test: What is the strongest case-specific evidence that the remedy succeeded?

  1. Renewals are achieved with less rework and better customer confidence
  2. Growth remains profitable after delivery commitments are included
  3. Renewal processes close with lower rework and predictable effort
  4. Forecast timing and actual order dates are more consistent

Explanation

Correct Answer

C:

This demonstrates a completed remedy: Renewal processes close with lower rework and predictable effort. It closes the loop from the observed issue through the action 'Quantify execution overhead and prioritize earlier renewal readiness' to an observable, accountable result; mere activity or an emailed proposal would not be enough.

Incorrect Answers

A:

That outcome can matter when a partner improves adoption evidence and reduces last-minute renewal rescue work, but it does not verify the remedy required by this case. The necessary acceptance evidence is 'Renewal processes close with lower rework and predictable effort'.

B:

The offered result tests another workstream and could give false confidence about the named obstacle. Successful closure here needs 'Renewal processes close with lower rework and predictable effort', tied to the account's actual risk.

D:

This measure would show improvement for a different situation: the partner needs to explain why renewal forecasting matters to working capital. It would not prove the main account's issue was corrected; check 'Renewal processes close with lower rework and predictable effort' instead.

Question 676

For a renewal program review, Orion Energy reports: a partner repeatedly books renewals late and pays for emergency legal processing. Long-term prevention: Which ongoing control would most directly reduce recurrence of this failure?

  1. Measure forecast accuracy as well as booked value
  2. Track adoption, escalation load and renewal cost together
  3. Include total support cost in expansion profitability review
  4. Track cost-to-renew and preventable delay causes

Explanation

Correct Answer

D:

This control is matched to the known failure mode: Track cost-to-renew and preventable delay causes. Repeating this check catches the signal 'Avoidable late-stage work is increasing cost per successful renewal' earlier and makes the correct handoff or intervention reliable beyond a single deal.

Incorrect Answers

A:

That cadence controls a different process associated with the partner needs to explain why renewal forecasting matters to working capital. Preventing the described recurrence requires 'Track cost-to-renew and preventable delay causes'.

B:

While useful for a partner improves adoption evidence and reduces last-minute renewal rescue work, it would not consistently detect this case's signal. Establish 'Track cost-to-renew and preventable delay causes' instead.

C:

A generic control is not enough when the failure mode is specific. This option tracks another risk; the focused prevention step here is 'Track cost-to-renew and preventable delay causes'.

Question 677

During a subscription portfolio review, Pioneer Energy reports: a partner retains recurring revenue but stops investing in customer adoption services. Recommended response: What should the renewals manager or coordinating team do first?

  1. Balance margin with lifecycle value creation to protect sustainable retention
  2. Evaluate contribution margin after discount and delivery cost
  3. Separate contingent Cisco 360/CPI opportunities from confirmed earned value
  4. Quantify execution overhead and prioritize earlier renewal readiness

Explanation

Correct Answer

A:

This addresses the specific obstacle: a partner retains recurring revenue but stops investing in customer adoption services. The supporting sign is that cost cuts reduce success touchpoints while churn indicators increase. The action therefore targets the account's immediate renewal dependency rather than unrelated housekeeping.

Incorrect Answers

B:

That work would mainly address a different condition: a discount-heavy retention campaign keeps contract count stable but lowers gross margin. Here the observed problem is a partner retains recurring revenue but stops investing in customer adoption services, requiring the targeted action 'Balance margin with lifecycle value creation to protect sustainable retention'.

C:

This is a plausible renewal task when budget includes incentive income with no qualification evidence, but that is not the deciding fact given here. The direct remedy in this account is 'Balance margin with lifecycle value creation to protect sustainable retention'.

D:

The suggestion may support another customer facing a partner repeatedly books renewals late and pays for emergency legal processing; it leaves this account's specific blocker untouched. Use 'Balance margin with lifecycle value creation to protect sustainable retention' to address the documented signal.

Question 678

In the lead-up to a customer decision, Pioneer Energy reports: a partner retains recurring revenue but stops investing in customer adoption services. Risk diagnosis: Which piece of evidence would most directly support diagnosis of the specific blocker?

  1. Avoidable late-stage work is increasing cost per successful renewal
  2. Cost cuts reduce success touchpoints while churn indicators increase
  3. Bookings stay flat while realized per-contract profitability falls
  4. Budget includes incentive income with no qualification evidence

Explanation

Correct Answer

B:

This is the discriminating account evidence: Cost cuts reduce success touchpoints while churn indicators increase. It directly supports the case description, while the suitable response is to balance margin with lifecycle value creation to protect sustainable retention. Check the underlying customer and contract records before committing the renewal.

Incorrect Answers

A:

This is meaningful in a different renewal investigation, but it does not establish the specific blocker in the prompt. The discriminating evidence is 'Cost cuts reduce success touchpoints while churn indicators increase', not this unrelated symptom.

C:

This evidence points toward another case: a discount-heavy retention campaign keeps contract count stable but lowers gross margin. For the named account, the relevant observation is 'Cost cuts reduce success touchpoints while churn indicators increase', which tests the issue described.

D:

That signal would help if a finance team books projected incentives as certain before confirming eligibility. The present case instead calls for verifying 'Cost cuts reduce success touchpoints while churn indicators increase' before choosing a remedy.

Question 679

For a renewal program review, Pioneer Energy reports: a partner retains recurring revenue but stops investing in customer adoption services. Acceptance test: What is the strongest case-specific evidence that the remedy succeeded?

  1. Financial reporting distinguishes qualified, earned and assumed incentives
  2. Renewal processes close with lower rework and predictable effort
  3. Partner profitability improves without degrading customer outcomes
  4. The campaign protects profitable retention rather than only quantity

Explanation

Correct Answer

C:

This demonstrates a completed remedy: Partner profitability improves without degrading customer outcomes. It closes the loop from the observed issue through the action 'Balance margin with lifecycle value creation to protect sustainable retention' to an observable, accountable result; mere activity or an emailed proposal would not be enough.

Incorrect Answers

A:

That outcome can matter when a finance team books projected incentives as certain before confirming eligibility, but it does not verify the remedy required by this case. The necessary acceptance evidence is 'Partner profitability improves without degrading customer outcomes'.

B:

The offered result tests another workstream and could give false confidence about the named obstacle. Successful closure here needs 'Partner profitability improves without degrading customer outcomes', tied to the account's actual risk.

D:

This measure would show improvement for a different situation: a discount-heavy retention campaign keeps contract count stable but lowers gross margin. It would not prove the main account's issue was corrected; check 'Partner profitability improves without degrading customer outcomes' instead.

Question 680

During the account team's readiness meeting, Pioneer Energy reports: a partner retains recurring revenue but stops investing in customer adoption services. Long-term prevention: Which ongoing control would most directly reduce recurrence of this failure?

  1. Monitor renewal price realization and cost-to-serve
  2. Recheck program rules and partner standing before forecasts
  3. Track cost-to-renew and preventable delay causes
  4. Review retention risk alongside lifecycle service cost changes

Explanation

Correct Answer

D:

This control is matched to the known failure mode: Review retention risk alongside lifecycle service cost changes. Repeating this check catches the signal 'Cost cuts reduce success touchpoints while churn indicators increase' earlier and makes the correct handoff or intervention reliable beyond a single deal.

Incorrect Answers

A:

That cadence controls a different process associated with a discount-heavy retention campaign keeps contract count stable but lowers gross margin. Preventing the described recurrence requires 'Review retention risk alongside lifecycle service cost changes'.

B:

While useful for a finance team books projected incentives as certain before confirming eligibility, it would not consistently detect this case's signal. Establish 'Review retention risk alongside lifecycle service cost changes' instead.

C:

A generic control is not enough when the failure mode is specific. This option tracks another risk; the focused prevention step here is 'Review retention risk alongside lifecycle service cost changes'.

Cisco Renewals Manager (CRM) (700-805) Practice Tests